Loading…
Loading…
116 results • Best match
CONSTRUCTION OF BHURSAKONA TO CHARBHIYA DAM APPROACH ROAD LENGTH 2.20 K.M. OF DISTRICT JASHPUR
SUPPLY INSTALLATION OF HIGHMAST LIGHT, STREET LIGHT AND DRILLING OF TUBEWELL & INSTALLATION OF MOTOR PUMP AT GARDEN OF SARADIH BARRAGE UNDER HASDEO BANGO PROJECT DISTT. SAKTI.
CONSTRUCTION OF BAGIYA BARRAGE ACROSS MAINI RIVER NEAR VILLAGE BAGIYA IN BLOCK KANSABEL,DISTRICT-JASHPUR(C.G.) INCLUDING OPERATION AND MAINTENANCE FOR FIVE YEARS AFTER COMPLETION OF CONSTRUCTION
Renovation of Head Work and C.C. Lining of Main Canal from R.D. 0.00 m to 1290.00 m, Construction of 3 Nos. of V.R.B, 20 Nos. of Colabas, 5 Nos. of Inlet Structure and Repair of existing structure of Rengakathera Tank under Block Ambagarh Chowki, District Mohla-Manpur-Ambagarh Chowki
Construction of MohmelaSirpur barrage project and all appurtenant work including pipe irrigation network, operation and maintenance for five years after completion of construction work on Mahanadi River in Tahsil - Arang distt - Raipur (C.G.)
Repair, Lining and Concrete work of Rasota sub minor canal and Karmanda minor canal of Parsada distributary.
Repair and Lining work of Kolihadewari, Baijupara minar canal of Bokarel Distributary and Khoha minar of Parsada distributary.
CONSTRUCTION OF REPAIR & MAINTENANCE AND LINING WORK OF MINOR CANAL OF KANKI AND KARMA DISTRIBUTORY OF HASDEO RIGHT BANK CANAL.
Construction of Strengthening of Kapsi to Paralkot Dam Road from km 1/2 to 10/10 = 9.83 Km i/c Culverts and Bridges.
WMM Emulsion Patch Work at Various Roads under Vidhan Sabha Sub Division Raipur (C.G.) 1. Nandanvan Jarway Hirapur Road 5.2 Km 2. Urla Patharidih Road 4.1 Km 3. Bana Berla Anicut Road 0.4 Km 4. Hathband Tendua Road 2.0 Km 5. Math Beldarseoni Road 3.2 Km 6. Shankarnagar Balodabazar Road 3.4 Km
RENOVATION AND REPAIR OF HEAD WORK, EASTE WEIR & LHS SLUICE, CONSTRUCTION OF R.H.S. SLUIECE, CC LINING WORK OF R.B.C. MAIN CANAL RD 0 M. TO 1350 M., C.C. LINING WORK & LBC MAIN CANAL RD 0 M. TO 990 M., CONSTRUCTION OF 02 NOS, VRB AND 08 NOS OF OUTLETS OF DUGLI TANK SCHEME, BLOCK-NAGRI, DISTRICT – DHAMTARI.
CONSTRUCTION OF DIVERSION WEIR CUM CAUSEWAY, E/W LBC MAIN CANAL RD 0.00 M TO 1740 M , 2 NOS HEAD SLUICE, 2 NOS VRB, 2 NOS CD AND E/W RBC MAIN CANAL RD 0.00 M TO 4980 M , 5 NOS VRB, 6 NOS CD 1 NO VERTICAL FALL AND FIXING 20 NOS OUTLETS OF BANSHDHARI NALA DIVERSION SCHEME
Handling, Transport and Other Mining Services - Percentage quote based - Transportation laying and fitting 6 X 6 mtr PVC Pipe from 84L Dam to 96L 6X for installation of 500 GPM 6 stage pumps at 96L 6X and Transporting of Motor pump set 500 GPM to 96 ..
Frozen semen straw Frozen Semen Straw ( 50000 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Allowed Values Set 1 Usage: Frozen semen straw is for containing and long duration storage of frozen ... the dams milk ... No/breed/bulls dams standard ...
Design, Drawing, Construction, Testing, Commissioning of Intake well 6m dia height 22Mtr,30m length approach bridge&approach road, Electric Sub station315 KVA/11/0.415 KV with all required Work,Raw water V.T. pumps and motors 02 Nos each of 25HP ... existing anicut , ...
Design, Drawing, Construction, Testing, Commissioning of Floating Pontoon of size 5X3 mtr at JHUMKA Dam, Raw Water Electric Sub station100 KVA/11/0.415 KV with all required Work,Raw water HSCF pump sets 2 no of 10HPhaving discharge - 97656 LPH and against 20.0m head at Floating pontoon station site, 2.0 MLD conventional Type Water Treatment Plant, Clear water centrifugal pump set 03 Nos of 30HP having discharge 93750 LPH against 101m head, Clear Water Electric Sub station 100 KVA/11/0.415KV with all required Work at WTP site, 120 KL capacity 30m staging MBR-1 no at village salka,100 KL capacity 16m staging MBR-2 no at village salka, Providing, laying, jointing and testing & commissioning of Raw Water Pumping Main DI K-9 Pipe 250 mm Dia- 200m and Clear water pumping main 150 mm Dia DI K-9 Pipe-3820 m,DI K-9 Pipe200mm dia-1210 m ,total Length-5030 m& Clear Water Gravity Mains DI K-7 pipe 300 mm dia L= 6128m.& O-PVC Pipe PN-16, 160mm dia – 5423m. 250 mm dia –7487m, 110mm dia – 31711 m. Total Length- 50749 m with all required valves &specials,as per attached key plan map, Providing and fixing Bulk flow meters, nala crossing and work include taking permission to PWD, WRD deptt. etc. Allied All civil works including Boundary wall around WTP campus. Work completion is 12 months including rainy season Integrationof all component, comprises of three month testing & 09 month trial run of entire scheme (with defect liability period of one year). (On Risk and cost basis)GROUP WATER SUPPLY SCHEME NARKELI BLOCK- BAIKUNTHPUR DISTRICT –KOREA