Loading…
Loading…
227 results • Best match
Design and const of 590 Mtr snow gallery, const of 483 Mtr snow avalanche catch dam, 100 m loose rock scaling on D-S road approach road to south portal of proposed Shinkun la tunnel under 126 RCC 13 TF of project Yojak in the state of HP through EPC
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Outstation 24*7
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Facility Management Services - LumpSum Based - Industrial; WT 4930 As & when required miscellaneous civil works for boiler side of plant area at UkaiTPS; Consumables to be provided by service provider (inclusive in contract cost)
Vehicle Hiring Service - Per Vehicle-Day basis - Hatchback; 2025, 2024; Outstation; Plain; 5000 x 04 jeep = 20000 Kms; Round Trip, Vehicle Hiring Service - Per Vehicle-Day basis - Hatchback; 2025, 2024; Outstation; Plain; 3000 x 06 jeep = 18000 Kms per month use; Round Trip, Vehicle Hiring Service - Per Vehicle-Day basis - Hatchback; 2024, 2025; Outstation; Plain; 3000 kms x 02 jeep = 6000 Kms per month use; Round Trip
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 4982G Work contract for Preventive Breakdown Maintenance work of Vertical Fire water and Emulsifier water pumps Horizontal water pumps Jockey fire water pumps of Uni..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electrical System or Installation; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 4966A G Work of on line preventive & breakdown maintenance for Boiler rotary parts of 500 MW of UTPS on As and when required basis; Power House Equipment; As Per ATC
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 5002G Emergency works of Air Pre Heater Gear Box overhaul replacement and other work on as and when required basis in Boiler Unit No 3 4 and 5 at Ukai TPS BMD 2; Air ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 4985 G work of complete overhauling of existing Zero Discharge Sump Pumps of unit no 3 4 and 5 at UTPS and miscellaneous work on as and when required AHP 2; Complete ..
Digital Micro - Ohmmeter as per IS 13875 (Q3) MSE Exemption for Years of Experience and Turnover
Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2)
Monthly Basis Cab & Taxi Hiring Services - MUV; NA; Local
Pressure Calibrator (Q3) MSE Exemption for Years of Experience and Turnover
Custom Bid for Services - Unloading of coal wagons and related cleaning of entire coal plant Similar Category Coal Exploration Services Facility Management Service- Manpower based (Version 2) Handling and Transport on Lumpsum Basis
CONVEYOR DECKING PLATE 1, CONVEYOR DECKING PLATE 2, CONVEYOR DECKING PLATE 3, CONVEYOR DECKING PLATE 4, DECKING PLATE FOR CONVEYOR BELT 5
MS CHANNEL SIZE 150x75 MM IS2062X84, MS CHANNEL SIZE-200x75x6.2MM, MS CHANNEL SIZE 250x80 MM, MS CHANNEL SIZE 125x65x5.3 MM, MS BEAM SIZE, MS BEAM, MS BEAM 250x125 MM, MS BEAM SIZE 450x150 MM, MS ANGLE SIZE 100x100x8 MM, MS ANGLE SIZE 75x75x10 MM, MS ANGLE SIZE 75x75x8 MM, MS ANGLE SIZE 65x65x8 MM, MS ANGLE SIZE 65x65x6 MM, MS PLATE SIZE 10 MM, MS PLATE SIZE 12 MM, MS CHEQUERED PLATE
clinical cabinets (Q3), Stretcher Trolleys (Q3), Saline Stand (V2) (Q3), Overbed Tables (Q2), trolleys or accessories (Q3) MSE Exemption for Years of Experience and Turnover
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 4965 G ESP collecting plates and field related spares replacement work in Unit no 3 and 4 at GSECL Ukai TPS BMD 2; Power House Equipment, ESP collecting plates and fi..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Work of cleaning of various coolers and strainers of turbine auxiliaries WT 4915; Service Provider
Calibration Services - As per ATC; As per ATC; NABL Labs, As per ATC; As per ATC
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Work of Replacement installation and commissioning of Various Pumps of TMD 2 at Ukai TPS on as and when required basis; Power House Equipment; As per ATC
Professional Painting Service - Metals; NA; Pipelines, Grills, WT 4923 anticorrosive painting for the various structures, auxiliaries, tanks, piping fence etc at GSECL Ukai TPS
Polyester Webbing Slings (Q4), Polyester Round Slings (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 10 Bid Number : GEM/2025/B/6606327 Dated : 26-09-2025 Bid Document 1/9 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Polyester Webbing Slings Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 35010.9 Evaluation Method Item wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 4962A Work of online preventive and breakdown maintenance for Boiler its mountings and accessories for 500 MW Unit No 6 at Ukai TPS BMD 6; Power House Equipment; As p..
Facility Management Services - LumpSum Based - Industrial; Providing and fixing Curtains of required pattern for windows; Consumables to be provided by service provider (inclusive in contract cost)
Supply of idlers rollers
Reverse Osmosis based Point of Use Water Treatment System for Drinking Purposes (V3) as per IS 16240 (Q2) MSE Exemption for Years of Experience and Turnover
Fire Proximity Suit (V3) (Q2)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 5009G Work of Various maintenance works of stacker cum reclaimer for coal handling plant of 500MW Unit no 6 CHP 6 MECH MAINT; Various maintenance works of stacker cum..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 4964 G DC battery cell Preventive maintenance work at 220 KV and 400 KV Switchyard at Ukai TPS GSECL; Switchyard, Power House Equipment, DC battery cell Preventive ma..
Television (TV) (V2) (Q2) MSE Exemption for Years of Experience and Turnover
COLLECTING ELECTRODE, HELICAL WIRE TYPE EMMITING ELECTRODES, COMPLATE SHAFT ASSLY.FOR COLLECTING RAPPING MECHANISM, COMPLATE SHAFT ASSLY.FOR EMITTING RAPPING MECHANISM, INNER ARM ASSLY FOR COLLECTING and EMITTING RAPPING, OUTER-ARM ASSLY.FOR COLLECTING RAPPING, OUTER-ARM ASSLY.FOR EMITTING RAPPING, PLAINE BEARING FOR ESP, SHAFT INSULATOR FOR ESP, SHOCK-BAR WITH ANVIL FOR COLLECTING RAPPING, ANVIL FOR EMITTING RAPPING, GAS DISTRIBUTION SCREEN PLATE II FOR ESP, SHOCKBAR GUIDE FRONT SIDE, SHOCKBAR GUIDE REAR SIDE
POWER CYLINDER, HOSE PIPE1, HOSE PIPE2, HOSE PIPE3, HOSE PIPE4, HOSE PIPE5, HOSE PIPE6, HOSE PIPE7, HOSE PIPE8, HOSE PIPE9, HOSE PIPE10, HOSE PIPE11, HOSE PIPE12, IP CONVERTER 1, IP CONVERTER 2, FLOWMETER 1, FLOWMETER 2, OXYGEN ANALYSER, DIGITAL VIBRATION METER
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 4970A G Work of repairing rectification of ESP of Unit No 3 to 6 on as and when required basis at Ukai TPS BMD 6; repairing rectification of ESP; As Per ATC
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; WT 4992 The work of in situ repairing of High Pressure Valves and Spring Loaded boiler safety valves during AOH COH and as and when required basis; A..
Handling and Transport on Lumpsum Basis - WT 4917 A GeM Biennial rate contract for the work of Cleaning Collecting loading transporting and unloading of Coal Reject coal and Coal dust from Bowl mills area and R C Feeder floor area of unit 6 at Ukai T..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electrical System or Installation; Service Provider
Handling and Transport on Lumpsum Basis - Work of Loading, transportation and unloading of stacked coal unloaded WT 4932
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; WT 4973 Work of replacement of various size of IBR approved 2500 class valves by IBR Approved agency in unit 3to6; As per ATC
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 5060G Various Safety related works and other miscellaneous flap RPG gates and damaged grill decking plate replacement work for CHP 6 at GSECL TPS Ukai (CHP 6); Variou..
Repair and Overhauling Service - Backhoe Loaders (V2); WT 4956 G Work contract for attending running repairs scheduled preventive break down maintenance with overhauling of 07 Seven nos SAN make locomotives of UKAI TPS Fuel Locoshed; No; Buyer Premi..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; valves of turbine auxiliaries; Service Provider
Operation and Maintenance Of Electrical Systems/Electrical Installations - Complete System
Annual Maintenance Service - Desktops, Laptops and Peripherals - WT 4971 G AMC for Desktop Computers Laptops Printers and Scanners at Ukai TPS IT; As per ATC
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; WT 4968 Maintenance contract for complete servicing overhauling attending fault repairing checking various types of Hoist cranes and fabrication erection..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 4959 G The work of fabrication of various size Bends for Boiler Unit Nos 3 to 6 at GSECL Ukai TPS during as and when required basis BMD 2; Fabrication of various size..
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Earth Moving Equipment, Material Handling Equipment, WT 4972 G Hiring of Pocklain or Excavator for unloading of coal wagon at Uk..
Testing Service for On-Board/Commissioned Equipment Instrument related to Plant
MAKE BHEL COAL MILL XRP-1003 SPARES-1, MAKE BHEL COAL MILL XRP-1003 SPARES-2, MAKE BHEL COAL MILL XRP-1003 SPARES-3, MAKE BHEL COAL MILL XRP-1003 SPARES-4, MAKE BHEL COAL MILL XRP-1003 SPARES-5, MAKE BHEL COAL MILL XRP-1003 SPARES-6, MAKE BHEL COAL MILL XRP-1003 SPARES-7, MAKE BHEL COAL MILL XRP-1003 SPARES-8, MAKE BHEL COAL MILL XRP-1003 SPARES-9, MAKE BHEL COAL MILL XRP-1003 SPARES-10, MAKE BHEL COAL MILL XRP-1003 SPARES-11, MAKE BHEL COAL MILL XRP-1003 SPARES-12, MAKE BHEL COAL MILL XRP-1003 SPARES-13, MAKE BHEL COAL MILL XRP-1003 SPARES-14, MAKE BHEL COAL MILL XRP-1003 SPARES-15, MAKE BHEL COAL MILL XRP-1003 SPARES-16, MAKE BHEL COAL MILL XRP-1003 SPARES-17, MAKE BHEL COAL MILL XRP-1003 SPARES-18, MAKE BHEL COAL MILL XRP-1003 SPARES-19, MAKE BHEL COAL MILL XRP-1003 SPARES-20, MAKE BHEL COAL MILL XRP-1003 SPARES-21, MAKE BHEL COAL MILL XRP-1003 SPARES-22, MAKE BHEL COAL MILL XRP-1003 SPARES-23, MAKE BHEL COAL MILL XRP-1003 SPARES-24, MAKE BHEL COAL MILL XRP-1003 SPARES-25, MAKE BHEL COAL MILL XRP-1003 SPARES-26, MAKE BHEL COAL MILL XRP-1003 SPARES-27