Loading…
Loading…
3,756 results • Best match
Non-Comprehensive Annual Maintenance Contract of 3 nos. Otis Make Lifts (1 No. at Power House and 2 Nos. at Dam) installed at Omkareshwar Power Station for 01(one) Year
Non-Comprehensive Annual Maintenance Contract of 3 nos. Otis Make Lifts (1 No. at Power House and 2 Nos. at Dam) installed at Omkareshwar Power Station for 02(Two) Years
Non-Comprehensive Annual Maintenance Contract of 3 nos. Otis Make Lifts (1 No. at Power House and 2 Nos. at Dam) installed at Omkareshwar Power Station for 03 (Three) Years
Repair work of 30 H.P. Gallery dewatering Motor pump set no. 1 (Sr. no.80227) and 30 H.P. Motor control panel no.1 of Mahi project Main Dam District Jhabua
Repair work of 30 H.P. Gallery dewatering Motor pump set no. 1 (Sr. no.80228) and 30 H.P. Motor control panel no.1 of Mahi project Main Dam District Jhabua
Annual Repair and Maintenance and Patrolling work of Dehandi, Math Math Distributary Canal, Navapada, Karangarh, Math-Math Sub Distributary Canal of Mahi Main Dam Tehsil Petlawad, District Jhabua M P
Construction of stop dam cum culvert and plantation environment upgradation work on Kanthali river in village Badan ji ka Kheda for water conservation and increasing ground water level District Mandsaur
Annual Repair and Maintenance of L/F, R/F AND Hoist Bridge Street Lights and Internal Electrification of Control Room and Barriers at Main Dam Bansagar Deolond Distt. Shahdol (M.P.).
Work of laying 11 KV line 9.80 KM with allied works from 33 or 11 KV Substation Plastic Park Tamot to Intake well Ratapani Dam Village Ahmadpur Distt Raisen MP
Providing and fixing commissioning with testing of 20 passenger cum freight 1360 Kg capacity, 2 stop (G and T) elevator with IS specification approved make at Orr major Dam project.
Shifting 11 kv line, and 25 KVA DTR at location Rojiya- Karedi road (Rojiya dam area) in various village under Khujner D/C in (O and M) Dn Rajgarh (M.P.)
E/W of damage portion of Dam Bund near R D 3898.50 D S of Right Flank and removal of silt from longitudinal D S drain of Rajiv Sagar Project
Premonsoon Repair and Maintenance of 33/0.43 KV Sub Station and Control room at Upper Beda Dam Site, Dist. Khargone including material, labour, charges, connection and testing etc. complete work.
Shifting of Various HT Line DTR and Road Crossing at place Lakhanpur to Bansadehi including Kheri to Bhojpur (Begumganj- Raisen) affected by the submergence of Jera Dam Medium Irrigation Project
Earth work on dam and canal repairing work of Piliyakhal tank tehsil Nalkheda Distt. Agar under jurisdiction of W.R. Sub Division, Susner Distt. Agar Malwa of Water Resources Division, Shajapur.
Pre-monsoon annual repair maintenance work of 07 nos. radial gates, 02 nos. head sluice gates and coupled head stock set at Kushalpura Dam Medium project (Biaora), Distt Rajgarh (M.P.)
Premonsoon Repair and Maintenance of 33/0.43 KV Sub Station and Control room at Upper Beda Dam Site, Dist. Khargone including material, labour, charges, connection and testing etc. complete work.
Premonsoon Repair and Maintenance of Radial gates and Power Pack at Upper Beda Dam Site, Year 2021-22 Distt. Khargone including material, labour charges, transportation and testing etc. complete work
Providing and Erection of 11 KV Line (Nimon to banda Dam) including additional bay (at Substation Nimon) with required elements for Banda Irrigation Project, complete work with material and Labour
Repair maintanance and overhauling of Hydraulic system for Radial gates of Madikheda dam Sindh Project II Distt. Shivpuri (size of Radial gates 14.5mtr (W) x12 mtr (H) , Total 10 Nos)
Construction of VRB at RD 2110 of Dharampura Dy of Singhpur Barrage.
Facility Management Service- Manpower based (Version 2) - Industrial; Providing Services of Gauge Reader for taking reservoir level/flood monitoring at ISPS Dam site, Handia and other G&D sites for the monsoon season- 2025 (16th Jun to 15 Oct); Unsk..
Repair, maintenance and servicing of DG Set at Pillowa Dam and Kotwal Dam Morena
Procurement of spares for Suction/ Discharge valve Unit of M/s WEIR MINERAL make GEHO pumps model no. TZPM 250 are installed at silo in HCSD system of Fly Ash system of AHP-IV 2X250 MW Unit 10 and 11, STPS, Sarni.
Procurement of spares for Suction/ Discharge valve Unit, Pulsation Diaphragms and Seal Unit of WEIR MINERAL make GEHO pumps model no. TZPM 250 installed at silo in HCSD system of Fly Ash system of AHP-IV Unit 10 and 11 STPS, Sarni.
Lining work in main canal R.D. 0.00m. to 15930m. of Gangulpara Tank and Dongarbudi Tank R.D. 4280m. to 6770m. renovation and resectioning of Bund, repair of sluice and waste weir of Mau Tank and Shervi No.2 Tank under special repair scheme
Purchase of spares for Suction/ Discharge Valve Unit of M/s WEIR MINERAL make GEHO pumps model no TZPM 250 are installed at silo in HCSD system of Fly Ash system of AHP-IV 2X250 MW Unit 10 and 11, STPS , Sarni.
Supplying and installation of Heat shrinkable jointing kit, pipes, Including Other electrical Elements for connection of Control Room at Sajali Medium Dam District Damoh (M.P.) complete work with material and labour at work site as per G Schedule
Repair of Stop dam Jatkheda, Kuno, vijaypur (Damage by heavy rain and flood. comprises of Earth work, concrete work, pitching work etc. including management operation and maintenance for (MOM) 2 years.
Work for Propsed new 11 kv line and new LT Line for affected existing LT Line due to drowned area of Dolnala DAM at village Kukdikhapa Rajna DC of Pandhurna Chhindwara
Dismantling work of damaged sluice tower of Pipartal tank, Construction work of New Well type Sluice, Excavation and Eartwork of dam, pitching work and gate fixing work etc under Special Repair.
Annual Canal Cleaning, Repairing work and Patrolling of Math-Math Branch Canal, Pattharpada Distributary and Tail Distributary of Left Bank Canal of Mahi Main Dam Tehsil Petlawad, District Jhabua Madhya Pradesh
Pre-monsoon Repair and Maintenance of Semri medium project 02 nos. sluice gates (2m x 2m), Tulsipar and Semra Khas tank sluice gates (600mm x 600mm) (02 nos. gates each dam)
Revised Estimate for Public experiment for installation of 1x100 KVA DTR, and LT Line At Village Kolgaon Dam Ke Pass Under Betul (R) Dc in O and M Dn Betul (S)
Survey Investigation and Preparation of D.P.R. for Road along the Canal at Left Side from Kaliyasot Dam to New Byepass Road (km. 1/2 to km. 13/2) Length 12.10 kms.
Annual Maintenance (Oiling And Greasing) of Radial Crest Gate Size (14.0 x 5.02)M with 70 Ton Capacity electrical hoist of Gulab Sagar Dam Mahan Project at Khaddi Distt.- Sidhi (M.P.).
New Electrification work with providing and Installation of 100 KVA DTR -13 Nos., at rehabilitated Village Kalyanpura affected by submergence of Sitanagar Medium Dam with material and labour at work site.
The Repairing work of Shed No. 02 in the premises of O/O The Assistant Engineer PHED Fairs Sub Division, Near Laharpur Dam, Bagh Mungaliya Bhopal as per bill of quantity.
PROVISION OF COOK HOUSE CUM DINING HALL AND PROVN OF LIVING ACCN WITH ALLIED INFRA AT KHANDARI FARM AND PROVN OD CHECK DAM FOR RWH AT MCMM UNDER GE (E) JABALPUR
Premonsoon Repair and Maintenance of 33/0.43 KV Sub Station and Control room at Lower Goi Dam Site, Year 2021-22 including material, labour charges, Connection and testing etc. complete work
Electrical Maintenance of Residential and Non Residential premises of colony, DG sets and illumination of Power House, Switchyard and Dam area at Indira Sagar Power Station, Narmada Nagar, Distt. Khandwa (M.P).
Cleaning/re-drilling of formed drains between inspection gallery to drainage gallery and foundation drainage holes at Drainage gallery along with the seepage water collection arrangement of Dam, Omkareshwar Power station
New Electrification work with providing and Installation of 100 KVA DTR -04 Nos., at rehabilitated Village Pathariya affected by submergence of Sajli Medium Dam with material and labour at work site.
Supply and installation of aerators for water purification near the stop dam located at different places on Saraswati and Kanh rivers of Indore city for operation and maintainence of 2 years.
FOR THE WORK OF REPAIR OF PUMP PARTS OF DB 65/20 AND DB 100/26 WATER PUMP FOR DEWATERING ARRANGEMENT OF LEFT AND RIGHT DAM GALLERY R.A.B.L.S PROJECT, BARGINAGAR JABALPUR.
Prepration of Detailed Project Report under CM infrastructure Development Scheme Face IV of Road Work, Drain Work, Building Work, Stop Dam, Swiming Pool etc. as per Requirement of Municipal Council Waraseoni
NIT document for Survey and investigation of catchment area command area head work and canal work of proposed Chahla Tola Rajarwara Tank Khitouli cause way cum stop dam Barhi Distt Katni
Shifting of Various HT Line with DTR and Road Crossing at place Lakhanpur to Bansadehi including Kheri to Bhojpur (Begumganj-Raisen) affected by the submergence of Jera Dam Medium Irrigation Project
SUCTION CASE BEARING MOC Br LTB2 JYOTI MAKE RESERVE WATER DAM, IMPELLER WEARING RING MOC SS CF8 JYOTI MAKE RESERVE WATER DAM, IMPELLER MOC SS CF8M JYOTI MAKE RESERVE WATER DAM, IMP. HOLDING SPLIT RING MOC SS316 JYOTI MAKE RESERVE WATER DAM, BOWL ... WATER DAM , ... WATER DAM , ... WATER DAM 1 ... WATER DAM , ... WATER DAM , ... WATER DAM 1 ... WATER DAM , ... WATER DAM , ... WATER DAM , ... WATER DAM , ... WATER DAM , ... WATER DAM , ... WATER DAM 1 ... WATER DAM 1 ... WATER DAM , ... WATER DAM , ... WATER DAM , ... WATER DAM , ... WATER DAM , ... WATER DAM , ... WATER DAM , ... WATER DAM , ... WATER DAM , ... WATER DAM , ... WATER DAM , ... WATER DAM
Providing and Installing of DG Set (62.5 KVA-1No.) including required various Electrical Elements with test and trial of Sajali Medium Dam. District Damoh (M.P.) complete work with material and labour at work site as per G Schedule and direction o