Loading…
Loading…
3,756 results • Best match
Survey, investigation and preparation of DPR for the development of 139848 hectare CCA under 174809 hectare GCA in the command area of Ken LBC in Chhatarpur district from the lower level tunnel of Daudhan Dam under the Ken Betwa Link Project
On Turnkey Basis Construction of Mild steel pipe barrel type well drop syphon structure at RD 28005 M of Rajghat left Bank canal in down stream of Lower Orr Dam , as per detailed scope of work but not limited to that.
Customized AMC/CMC for Pre-owned Products - Non comprehensive Annual Maintenance Contract of 3 Nos Otis Lift 01 No at Power House & 02 Nos at Dam Installed at Omkareshwar Power Station Siddhwarkut for 03 Three years; Otis Elevator Company (India) Lim..
Premonsoon oiling and greasing of 10 no. radial gate size 14.50mX12m Madikheda Dam 4 no. vertical lift gates size 2mX2m Ukayla saddle Dam distt. Shivpuri
Supply of 4 Labour (2 Skilled electrician and 2 Semiskilled helper) for Mahur Dam and Upper Keketo Dam Under WRD Sub Division (E/M) Gwalior
Temporary repair work of Kham tank waste weir by Borri Bandhan at Water Resources Sub Division Shujalpur
Premansoon RM and illumination of tawa dam for gallery dewatering section, street lighting, hoist bridge, right and left earthen dam illumination, DG set, repairing work etc.
Const of Pathway at Harkia khal Jaju Sagar Dam, Neemuch
Providing Labours for Parasdoh Dam Multai (upto 31 March 2026)
Providing Labours for Barna Dam Bari (upto 31 March 2026)
CONTRCTION OF CHECK DAM SARPANCH FALIYA KHATAMA MEGHNAGAR DIST JHABUA
Providing and fixing lights with pole at Kotwal Dam Morena
Pre-monsoon Oiling, Greasing of gates at Kotwal Dam, Morena
REPAIRING OF FENCING AT KALIYASOT DAM W-29 Z-08
Pre Monsoon oiling,greasing of gates at pagara dam morena
Providing and fixing lights with pole at Pillowa Dam Morena
REPAIR WORK OF LAKHUNDAR DAM CANAL OF RBC AND LBC
Non destructive geophysical investigation and rehabilitation recommendation of Ramauwa Dam.
Providing Labours for Tawa Dam Tawanagar (upto 31 March 2026)
Repalcement of the sluice gate 300x300 mm at Jogli Dam
Opening and closing of stop dam gates of paras tank
Opening and closing of 14 no stop dam MS shutters
U Bolt with Nuts and Washers, Square Plate, C Channel, Flanges, Canvas hose Pipe, Butterfly NRV, Gate Valve
Opening and Closing of Shutter Gate 6 Nos of Barrage Under Datuni Project Sub Division Kantaphod Distt Dewas (IInd CALL)
Premonsoon Repair and Maintenance of LBC sluice gate(2 No. Emergency gate and 2 No. service gate - 1.5 m X 2.0 m) at Upper Beda Dam site, Year 2021-22 Distt. Khargone including material, labour charges, transportation and testing etc. complete work
Estimate for Installation of 25 KVA DTR (Kisan Mitra Yojna) for 1 No. 5 HP Pump Connection for Shri Tulsiram s/o Lahoba Pawar at Village Kapasiya(Sendreaya Dam) in Dunawa D/c under (O and M) Division Multai In Betul Circle
Execution of balance work of Halon Irrigation Project Dam with NoF OF and Radial Gates Stop Log Gates Sub Station Gantry Crane etc. and 2 Nos High Level. Bridges with MoM for 24 months after completion as per details scope of work.
Dismantling work of 132kV Kukshi-Badwani line between loc. No. 222 to 343 due to increase of water level in the submerged catchment area of Sardar sarovar Dam, under the jurisdiction of EE(EHT-Maint.) Dn. Indore under consumer contribution works sche
Const. of Petlawad to deoli road length 1.50 k.m., Arniya bagdo to sukdi road length 1.40 k.m., Sakariya to arniya dam road length 1.20 k.m., Nipaniya raju to ajeemabad road length 2.00 k.m., Kanthariya to Gogakheda length 1.65 k.m. total length 7.7
Shifting of IRRI. DTR (100KVA) at Narmada River from DUB area of Sardar Sarover Dam to more than 141 meter level at VILL- Kheda water works wala , Sisgoan, Babu Chakki wala, Narendra Singh fattesingh wala, Under Chikhalda DC. Teh.- Kukshi Distt. Dhar
Pre-Mansoon Maintenance of 18 Nos. Radial Crest Gates size (18.290 x 15-529) M with 160 Ton Capacity Hoisting Arrangement, 55 Ton capacity Gantri Crane Control Panel and Power supply System for Operation of Gates of Bansagar Main Dam Deolond Shahdol
Recharging pit with vertical filter to be constructed in the submergence of Reservoir and pond and Stop dam and recharging pit around the less yield tube well no of work at Sagar and Rehli recharging shaft and recharging pit Sub Division Sagar
Facility Management Service - Manpower Based - Industrial; O&M of Civil Work; Providing Services of Gauge Reader for taking reservoir level flood monitoring at ISPS Dam site and GD site Handia for the monsoon season 2023 16th Jun to 15 Oct; Gauge Rea..
Construction of Upstream and Downstream RCC Parapet wall with dram alongwith the earthen dam top, 6 nos. RCC stair case top to bottom of earthen dam, Bitumen road on top of earthen dam, emulsion paining of parapet wall, power pack room, inner and out
Repair of Down Stream Main Chambal Bridge railing at Left and Right sight Bank
Repair and Maintenance of Gallery Dewatering Arrangment 50 HP Centryfugal Motor Pump 1 No. At Lower Goi Project (Shaheed Bhima Nayak Sagar Priyojna) Dist. Barwani including material, labour, charges, transportation and testing etc. complete work
Operation and Maintenance of Dewatering Work in Dewatering Gallery ,DG set operation and Maintenance, Gallery lighting and Maintenance , Sub-Station Operation and Maintenance of Upper Beda Project Dist. Khargonr(M.P.) For 12 Months for the year 2025
Repair and Maintenance of cable tray by Supplying and Erection of FRP Cable tray by replacing old rusted/broken cable tray of Upper Beda Project including material, labour, charges, connection and testing etc. complete work.
Repair and Maintenance of Fencing Around Meetering Equipement (ME) and Earh Pit of Lightening Protection system for Upper Beda Project including material, labour, charges, connection and testing etc. complete work.
Installing Sliding Main Gates (Two Nos) Near Lift Room and Power Room No.01 at Lower Goi Project (Shaheed Bhima Nayak Sagar Pariyojna), including material, labour, charges, connection and testing etc. complete work.
Repair and Maintenance of Gallery Dewatering Arrangment (25 HP Mody Make Submerisble Motor Pump ) At Lower Goi Project (Shaheed Bhima Nayak Sagar Priyojna) Dist. Barwani including material, labour, charges, transportation and testing etc. complet
240HP Electric Motor Repair with Material
Operation and Maintenance (of 30 tone gantry crane, Stop Log gate, Radial Gate, Gallery lighting, 200 and 250 KVA DG Set, 33/0.4 KVA Sub Station) Work For Lower Goi Project Dist. Barwani complete work.
Other Documents As per Tender Document
Repair and Maintenance the canals of Parasali,poladogar,Kutada Bujurg - I ,Gopalpura etc.tank Under Gandhisagar division.
Construction of RCC Nala Work From Muktidham to Banjara Dam Sheopur
CONSTRUCTION OF BOUNDARY WALL FOR W.T.P. CAMPUS NEAR DAHODE DAM OBEDULLAGANJ
Providing and fixing lights in the gallery at Kotwal Dam Morena
ANNUAL REPAIR OF TOWER ROOM at Thanwar Dam Distt. Mandla (M.P.)
Pre monsoon and Greasing, work at Mahuar Dam distt. Shivpuri, M.P.