Loading…
Loading…
4,272 results • Best match
SUPPLY OF SPARES FOR M/S WEIR MINERALS MAKE PUMPS INSTALLED IN BOTTOM ASH HANDLING SYSTEM OF 2X600 MW, KATPP, RVUN, JHALAWAR.
CC ROAD NIRMAN DAMODAR MANDIR SE LEKAR MASJIT KI GALI KO SHAMIL SH SUSAY KOLI KE MAKAN TAK WARD NO 6 WEIR
Repair and renovation of waste weir of Khatka MIP Village-Niwari GP-Gadreta Tehsil- Shahabad, Distt. Baran (Under Rajiv Gandhi Jal Sanchay)
Repair and Renovation of Fatehpura Anicut and Construction of flood protection wall from Lakhina Suhawa via Ratanpura Jhootha to Fatehpura first Thikrana Gujran G.P-Suhawa Tehsil and District Beawar
Watch and Ward of Kalisindh Dam along with Operation of Rest House , upkeep of garden at Dam site with Guaging work of Kalisindh River near village Barai and Bhumada for the year 2023-24
Watch and Ward of Kalisindh Dam along with Operation of Rest House , upkeep of garden at Dam site with Guaging work of Kalisindh River near village Barai and Bhumada for the year 2022-23
Construction of CCT, MPT, Pakka Chekdam, Sub surface bariar and anicut work at GP Bhana, Khatamala, Tasol, Pasund, Dhayla and Kelwa PS Rajsamand Under RGJSY Ist
Supply of Material at the site for the work of Repair and Renovation of Downstream side protection work Palasani anicut G.P. Palasani, P.S. Luni Under Mnrega
Pakka Work - Anicut Renovation, Renovation of RTWHS, Recharge shaft , GP- Badi Sakhthali, Bhat Bhamariya, Chokhali Peepali, Kangarh, Luharkhali, Block- Dalot (MJSA-2, Phase-II, State Fund)
Construction of WHS,Anicut, Pakka Checkdam in Bathera Kalan, Mal Ki Toos , Modi, Gupari, Majawra, Nandwell Toos Dangiyan Panchayat Samiti Vallabhnagar (MJSA 2.0 Phase1 State Fund)
Construction of MPT and DSMP and Anicut in Gram Pachayat Kunda, Dhankawara, Kali Ghati, Shaktawaton ka Gurah, Surkhand Khera, Udatfala Block Semari (By MJSA2.0 Phase 2)
1_Construction of CCT(1), Sunken Pond(6) Recharge Shaft(6) and Renovation of Anicut(1) GP Mangrol, Kanroonda, Bhawaliya, Satkhanda Block Nimbahera District Chittorgarh MJSA 2.2
Aamba, Khanpura se Dourai ke beech, Nathuwala Rawaton ke kua ke pass anicut and causeway renovation and repair va Ajaysar ke Talabon ki Repair (Pushkar) Ajmer
Construction of WHS and PakkaCheckdam, MPT, Anicut Renovation and Farm Pond in Gram Panchayat BhalonkaGuda, JhamarKotda and Lalpura in PMKSY-2.0 of P.S. Kurabar Dist. Udaipur
Construction of NRM Works under MJSA 2.0, MPT (7 Nos.), and Rafat cum anicut (1 No.) various Villages of G.P. Mamor / Hingoniya / Shyampura in P.S. Sangod
Rehabilitation Work of Ayad River (Part - 4), Udaipur (New Bhopalpura Bridge to Ashoknagar Anicut (Length -740 mtr and Avg. width- 40.00 mtr) (E-03_USCL_work No. 04)
Rehabilitation Work of Ayad River (Part - 5), Udaipur (Ashoknagar Anicut to Lakecity Mall Bridge (Length -510 mtr and Avg. width-51.00 mtr) (E-03_USCL_work No. 05)
Rehabilitation Work of Ayad River (Part -6), Udaipur (Lakecity Mall Bridge to Champabagh Anicut (Length -470 mtr and Avg. width-59.00 mtr) (E-03_USCL_work No. 06)
Construction of Contour bunding with waste weir, Bank stabilization nirman,ECD Nirman,Farm pondNirman,MPT Nirman,Sunken pond Nirman PS Kaman Under MJSA 2.3
NIT NO 32 Providing surface water Bisalpur Dam to HPCL, Beawar Road, Sardhana, District Ajmer
Repair and Renovation of Bhagwatgarh Dam and Canal Tehsil Chouth Ka Barwara District SawaiMadhopur
Shifting of Public asset Bheru ji ka Chabutra at Kotradeepsingh which is affected due to Submergence of Navnera Barrage Project across River Kalisindh Dist-Kota.
Shifting of Public asset Atla ji ka Chabutra at Kotradeepsingh which is affected due to Submergence of Navnera Barrage Project across River Kalisindh Dist-Kota.
Construction of CC Road from Brijnath temple near the access provided Toll Plaza Barod Village Under Sumbergence of Navnera Barrage Project across river Kalisindh Distt.Kota
Protection measures river training works to protect old monument (Barod shiv temple) in US of Navnera Barrage on Kalisindh River In Tehsil Mangrol District Baran
Safety measures works Protection Wall of Brijnath mandir Village Barod Which is Affected due to Submergence of Navnera Barrage Project across River Kalisindh dist. Kota
Supplying and Filling and laying of empty cement bags filled with earthand supply of labour rainy season For year 2021-22 on dams and canals in the jurisdiction of Water Resources Sub division Rajgrah
Supplying and Filling and laying of empty cement bags filled with earthand supply of labour rainy season For year 2021-22 on dams and canals in the jurisdiction of Water Resources Sub division Alwar
Supplying and Filling and laying of empty cement bags filled with earthand supply of labour rainy season For year 2021-22 on dams and canals in the jurisdiction of Water Resources Sub division Kotkasim
Supplying and Filling and laying of empty cement bags filled with earthand supply of labour rainy season For year 2021-22 on dams and canals in the jurisdiction of Water Resources Sub division Tijara
Hiring of JCB, Supplying of EC bag, Unskilled labour,Oil Greasing etc. for various dams Transferd from Panchayati raj Department during rainy season Under jurisdiction of sub div Begun, chittorgarh for year 2026-27
Hiring of Consultancy Services for obtaining wildlife clearance from Ministry of Environment, Forest and climate change MOEFandCC for the work of Construction of the feeder system from isarda dam to ramgarh Dam including all component
Repair, Renovation and Restoration work of Dheebru Sagar Dam and Canal Kantoli, Tehsil Malpura, District Tonk,Repair, Renovation and Restoration work of Ganglov Dam and Canal, Tehsil Todaraisingh, District Tonk, Repair, Renovation and Restoration wor
Watershed Development and Soil Conservation work ( Construction of Pakka Check Dam) GP Bhinda GP Bhilwa Panchela PS JHOTHARI District Dungarpur
Watershed Development and Soil Conservation work ( Construction of Pakka Check Dam) GP Sanserpur GP Padli Gujreshwar PS JHOTHARI District Dungarpur
Interloking Int Kharanja Nirman may nali Koli Basti se Surajmal Master ke ghar ki or Luhasa Gram Panchayat Jeewad in Panchayat Samiti Weir
SITC of DG set and other associated electrical works for Oxygen Generation Plant at CHC Weir, Bhusawar, Deeg, Bayana and Kaman, Distt. Bharatpur
Construction of Girls Toilet and Boys Toilet under Strengthening of Existing Schools (PAB 2022-23) GOVT. UPS Lalta Mudiya BLOCK- Weir DISTRICT- Bharatprur
Repair and Rehabilation of Roads under Pkg. No. RJ-06-06/NP/RIDF-XXVIII/ 2022-23 in P.W.D. Division-Weir. (Risk and Cost)
CC ROAD NIRMAN VINAY MEDICAL KI DUKAN SE LEKAR GALIYON KO SAMIL KARTE HUYE PRADIP CHOUDHARY KE MAKAN TAK WARD NO. 3 WEIR
Widening and Strengthning work of weir to Khanua Via Jheel Ka Wada, Kailadevi, Milakpur, Uchhain, Gahnoli mod km 0/0 to 43/200
Post Monsoon Repairing and Maintenance Works at Kalisindh Dam, Jhalawar for the Year 2022-23
work of tying the raw dam from the railway line culvert to the pump house
Watch and Ward and Oiling Greasing of Lhasi Dam From April 2025 to March 2026
Renovation of Dam and Canals of Danta Dhuwala Tank Tehsil Mandal, District Bhilwara under DMFT
clif consturction, sand filling work in pathway sculpture etc. at running work of surpura dam
Providing and Fixing of electrical and mechanical Components of Bisalpur Dam for year 2021 - 22
Supply of empty cement bags filled with earth at gudha dam for rainy season 2024
Repair of Flood Damage of Main Canal of Gopalpura Dam from Ch. 0 to 181
Construction of Counterfort Retaining wall for protection of D/S Approach Road of Bisalpur Dam