Loading…
Loading…
49,824 results • Best match
Krishna Koyna Lift Irrigation Scheme M and R to K.T. Weirs at Gavhan, Vithuraychiwadi No. 1, Vithuraychiwadi No. 2, Dhulgaon No. 1, Dhulgaon No. 2 and Ranjani for 2020-21.
Check dam work
Aluminum painting of hoist and driving units of radial gates
Aluminum painting of hoist and driving units of radial gates
Aluminum painting of hoist and driving units of radial gates
Aluminum painting of hoist and driving units of radial gates
O” Ring for Nozzle Dam Assembly (Q3), Mechanical Seal for Nozzle Dam Assembly (Q3)
Maintainence and Repairs to waist weir of Chandori Ex Mal Tank Tq. Sakoli Dist. Bhnadara
Repair of damaged Floor (main cavity Patch portion) of U/S Trench weir intake site
KT Weir On Tarali River and Uttrmand river
DETAILED SURVEY and GEOTECHNICAL INVESTIGATION FOR PROPOSED CONVERSION OF BOPLE K.T WEIR INTO BARRAGE
Strengthening of counter weight of Weir side gates of Barrage at Wazirabad water works.
Renovation and strengthening of Weir side gate no. 16 at Barrage in Wazirabad WW.
Malampuzha Dam,second largest dam is one of the main tourist attractions in Palakkad, Kerala. During festival seasons
Construction of Concrete Check Dam Pravasuni RF of Kateipada-1 of Deogarh Range of Deogarh Division
Construction of Concrete Check Dam Pravasuni RF of Kateipada-3 of Deogarh Range of Deogarh Division
Construction of Concrete Check Dam Badtalia RF of Shibapali-2 of Barkote Range of Deogarh Division
Construction of Concrete Check Dam Badtalia RF of Shibapali-1 of Barkote Range of Deogarh Division
Construction of Concrete Check Dam Pravasuni RF of Kateipada-4 of Deogarh Range of Deogarh Division
Repairs to750 HP VT pump of the Rustumpur LIS 1st Stage in Hidkal Dam Taluk Hukkeri.
Supplying Man Power to Filter House and Jackwell at Hidkal Dam for the year 2025-26
Consultancy services & conducting suitable tests required for rehabilitation of Markandeya Dam at Hukkeri taluka Dist. Belagavi
DSO Rectification works to Walayar Dam
Watershed Development and Soil Conservation work ( Construction of ANICUT and MPT) GP WALOTA GP FLOJ PS DOVDA District Dungarpur
Providing, fabrication and supply of stopdam gates size-1.50m x 3.00m-10nos for Agra-2 Barrage of WR Division Sehore.
Supplying labours for flood control work in the month of June- 2023 to November- 2023 for Hatnur Dam Section Tal-Bhusawal
Procurement of Sluice Valve and Foot Valve with installation for external water supply line and pump house at Rengali Dam Site
Painting on rusted steel surface after sand blasting of Superstructure stanchion legs of Gate no.1 to 19 at Pahadi Dam.
GENERAL-Meenkuzhi -LI Scheme at Kokkottuvayal near Meenkuzhi Dam in Kadannappalli- Panappuzha Panchayath in Kalliasseri Constituency, Kannur Dist. - General Mechanical Work
DEPOSIT 2025 26 Desiltation Of Poonoor River between Padanilam Check dam and Undodikkadavu in Kunnamangalam GP Kunnamangalam LA General Civil Work
IMPROVEMENT TO YELGAON DAM ROAD VR - 29 TQ. BULDANA. CH. 1/00 TO 1/500
Construction of 9- Dry Rubble Chek Dam At - Patan range (Salve-3 and Palshi- 6)
Opening and Closing gates of thirty two no. Barrage under Water Resources Division Bhopal
Construction of road from fazilpur dam To donalia mathpara dam of Sanmatinagar GP under Raghunathganj-II Block
Motorisation of 15 Ton Capacity Screw Stem Hoist of Service Gate of 1.2 x 1.8 Meter of head regulator at Bor Dam Project, Dist. Wardha.
Construction of anicut on morel river near bada GP Bilona khurd, Tehsil Lalsot District Dausa
Provision of R.C.C Pillar and Barbed wire Fencing along reservoir boundary for Demarcation of Hatia Dam area D.W and S. Division, Hatia Project, Ranchi.
Reaming of Existing Drainage Holes of 63 mm. Diameter, cleaning of formed drains etc. inside inspection gallery of Gandhisagar Dam for year 2020-21
Fabrication and erection of shed, Installing LED Light, replacing rope drum cover, Repairing and overhauling of roller cage assembly on Barua Dam Distt-Chitrakoot
Repairing of overhead RCC tank and filter house including replacement of pipe line of power house at THPS, DVC, Tilaiya Dam T.K. Division Konar
Strengthening of rusted foundation girder, overhauling of roller cage assembly, Replacing of old damaged cover of rope drum gear and pinion of Ranguwan Dam.
Removal of Old Wooden Platform and Erection of New MS Chequered Plate Over Superstructure from gate no 01 to 18 at Govind Sagar Dam.
Plantation work at Judicial Academy (5000 Plants) and State Dairy farm (10000 Plants) and Kaliasote dam nehru nagar ( 5000 plants ) including 3 years Maintenance.
Annual Periodic Maintainence For 3 Years of Verticle Lift Gate of Size 12 x 7 Mtr 12 Nos Hoist 85 Ton Capacity Gantry Crane-25 MT Cap1 No at Mohpur Taluka Mahur High Level Barrage Tq Mahur Dist Nanded
Construction of C C Bathing Ghat near Jenapur old Anicut on Brahmani right Embankment
Waghur Project - Construction of Record Room and Extension to Project Branch Room for Waghur Dam Division Tal-Dist-Jalgaon
Cleaning of 02 Nos. choked relief wells on Trial at downstream side of Obra Dam, at Obra Sonebhadra U.P.
MI Work Fixing MS Needles to KT weir Chandoh Patvan Chandoh Kawathe Fakte Sablewadi Nimgaon Dude Nimgaon Dude Kund Nimgaon Dude Tamkarwadi Amadabad Annapur Tal Ambegaon Dist Pune
MI Work Removing MS Needles to KT weir Chandoh Patvan Chandoh Kawathe Fakte Sablewadi Nimgaon Dude Nimgaon Dude Kund Nimgaon Dude Tamkarwadi Amadabad Annapur Tal Ambegaon Dist Pune
CONSTRUCTION OF AMRIT SAROVAR, FARM POND , TANKA, ANICUT, PT, MPT IN GP THATWARI, SHIMLA, RANWA, BARAU, RASOOLPUR, MADHOGARH, DALELPURA AND NARUANGPURA