Loading…
Loading…
49,796 results • Best match
Major Repair Works under State Budget Head School in GOVT GIRLS SR SEC SHCOOL WEIR Block WEIR
Repairs to Godown chouki compound road for K.T. weir and other related works of Sonawadi K.T. weir
Repair and maintenance of expansion joints of Mahanadi Barrage bridge for the year 2023-24 (Bay No. 10, 22, 29, 41, 43, 52, 59, 79 , 91). (MBD50/2023-24)
CONSTRUCTION OF KT WEIR AT GOPALPUR NO 2 TAKALI JAHAGIR NO2 and REOSA GOPALPUR and CONSTRUCTION OF GATED CNB NO 1 CHECK DAM AT TAKALI JAHAGIR TQ AMRAVATI DIST AMRAVATI
Leakage remedial measures bet. Ch. 0.0 to 35.0 m. of dam from Hillock side and bet. joint of Flank wall and waste weir and surrounding area of Kadwai M.I. Scheme
Removal of shrubs and grass cleaning of drain Maintenance and repair of U S and D S pitching dam top road waste weir of Terani M I Tank Tal Gadhinglaj
Operation and maintenance and providing support to run sinnar Municipal councils augmented discharge (kadawa Dam as Source) water supply scheme And Existing Water Supply Scheme (Chehedi Weir) as per demand
Operation and maintenance and providing support to run sinnar municipal councils augmented discharge (kadwa dam as source) Water Supply scheme And Existing Water Supply Scheme (Chehedi Weir) as per demand
Providing S.G. Shuttering arrangements to head sluice of (i) 28/4 DP, Ramavaram high level channel and low level channel (ii) Kovvuru surplus weir and (iii) GVs of Chinthapalli and Tossipudi lock, shutters of Gendredu dam and Volapalli dam in Kakinada, Kovvur and Tossipudi sections
Construction of 2 nos Check dams at Metela and Murgatala within Dubrajpur Block
Construction of concrete check dams in Co. 4/N of Nandini Wildlife Sanctuary
Construction of Concrete Check Dams 5 Nos in Comptt Co 7 9 JDR
Construction of 405 Loose stone check dams in GP Madla, Peepalbara and Damana
7 Number Stop Dams M.S. Shutter Opening and Closing Work Under Bagli Subdivision
Construction of 3 nos check Dams in drain near Malch Mahal Central Ridge.
Upkeep and Maintenance of Cheruthony and Idukki dams for the year 2020-21
GP KV 240/2020-21 Maintenance of Check Dams in various Wards ( 1,6,18 )
OandM and Operation of Controlling of various dams under Water Resources Division Rajsamand
Construction of Check Dams with gates at Gunjotiwadi 6 TQ. OMERGA DIST. Osmanabad
Rain water harvesting by construction of mini check dams at NMPT colony area
C/O gully plugging and check dams at wadder NLO Javid ah Ganie
IHEPUpkeep maintenance of Cheruthoni and Idukki dams for the year 2022-23
SUPPLY OF WEIR PUMP 150 SV SPR
SUPPLY OF SPARES FOR WEIR PUMP (WARMAN)
Security of Saddle dam at RPS Dam
Renovation of hydel store at DVC, Tilaiya dam under T. K. Division Konar.
BARRAGE GATE CONTROL PANEL (Q3), HEAD REGULATOR GATE CONTROL PANEL (Q3)
Replacement of pipeline in Ranaveera colony at w no 8 and Srinivasanagara in w no 6 Leakage repair and sand barrage at Mundli Dam providing wooden planks to Ramasamudra check dam 10 HP and 40 HP monoblock pump repair in Ramasamudra WTP in Karkala TMC limit
CONSTRUCTION RECHAGE SHAFT , ANICUT ANICUT CUM CAUSEWAY AT W.C. KHARKA , TURKADIYA UNDER PMKSY 2.0 (WDC-1) PS AKLERA DIST. JHALAWAR ( 10 Work)
Construction of Anicut(3), Pacca Checkdam(6) and Renovation of Anicut(13) Work GP Dhamancha, Govindpura, Daulatpura, Dorai Block Begun under RGJS
Construction of NRM Work (Anicut Cum Cause Way, Anicut) Under PMKSY-2.0 WDC-1 PS Aklera Distt. Jhalawar Pakka Work (6 Work)
Maintenance and Repairs of Pitching and Rock Toe of LHS and RHS Shelgaon Barrage Medium Project Tal and Dist Jalgaon
Removal of four nos. temporary weirs inside Najafgarh drain on its bed, between Chhawla Bridge (RD 17905m) to Kakraula Regulator Bridge (RD 30180m) on Najafgarh drain.
Construction of WHS (Anicut) in Block Kekri under PMKSY 2.0
NEW ANICUT CONSTRUCTION JAWAI AND BALIYA CHOWKI RANGE MOUNT ABU
NIRMAN WORKS PRATHANA STHAL AND ANICUT RENOVOATION SATOLA,PILI KHEDA
Construction of Anicut near Amali ka Bhat GP Swadari Deogarh
62/2025-26 Construction of Anicut, MPT, SDS, WHS, PT
Construction of Cutoff Wall Anicut PS Bayana Under MjSA-2.2
Repair maintenance and renovation of water sedimentation tank at Tilaiya Dam T.K. Division Division Konar.
Cleaning of vertical porous drain pipes in the drainage gallery of Hatnur dam using redrilling
Action Plan 2021-2022-Mangalam Project - Dam Section Providing shutters to the sluice along LBMC
Repair and maintenance of different types of quarters of permanent colony at Rengali Dam Site
DRIP II- SGHEP - Pamba Dam -Overhauling of Intake gate of IC Tunnel and allied works
Repair and maintenance of E- types residential building of permanent colony at Rengali Dam Site
Repair and renovation work of Agar Sagar Dam Part 1, Shyama Prasad Mukherjee Scheme Head
Restoration of relief well level monitoring system on right side down stream of Pandoh Dam
Manufacturing Transportation of M.S. curved type needle gate for various K.T. Weirs etc. under the control of Krishna Irrigation Division, Satara
Construction of Concrete weirs including B.T.Road at Thumukunta village, Galiveedu Mandal, Kadapa District for Ananthapuramu Ultra Mega Solar Park (1500 MW).
Manufacturing Supplying of Straight Needle Gate Size 2 15 05 1792 Nos for Hilli KT Weir Tal Akkalkot 138 Nos Khanapur KT Weir Tal Akkalkot 99 Nos Sindhkhed KT Weir Tal N Solapur 175 NosBandalgi KT Weir Tal NSolapur 22