MTPS I Mill Plant Unit I Complete dismantling of Mill internals reconditioning renewal of worn out parts and bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one Mill 1B to 1E
Tender invitation for the supply of Cummins engine spares - 5 items as per Annexure
e-Tender for the supply of various sizes of pulleys for conveyor system 2 items as per given Annexure
MTPS I M I CA CWS I Strengthening and reconditioning of western side eroded corroded sun shield roof structure and its doors provided over hot water basin in Cooling Tower II and allied works
MTPS I BM Unit II COH 2024 25 FG Duct A and B sides Renewal of Deflector plates renewal of duct supports renewal of guard plates over the expansion joints renewal of splitter plate and allied works
MTPS I BM Unit II Capital maintenance 2024 25 A and B stream Boiler PA fans FD Fans ID Fans and its isolation dampers and APH gear box
MTPS I BM Unit II COH 2024 25 FG duct A side Dismantling fabrication supply and erection of portion of Flue gas ducts from APH outlet to 45 degree slope end
MTPS I TM Unit II Removal and Re Insulation of 210MW LMW Design Turbine and its auxiliaries during COH 2024 25
MTPS I BM Unit II COH 2024 25 FG duct B side Dismantling fabrication supply and erection of portion of Flue gas ducts from APH outlet to 45 degree slope end
MTPS I Mill Plant AC Plant Unit II AOH 2025 26 Air Washer System Epoxy painting of blowers discharge duct spray system enamel painting of AWCW Pumps pipe lines Spray nozzles flushing works replacement of damaged duct area
MTPSI TM Units I to IV Attending the preventive breakdown maintenance works of Valves Pipe Lines reducers by cutting welding gasket renewing of valves flanges and Overhauling of defective passing Valves in Units I to IV
Mettur TPS I Mill Plant Units I to IV Cold Vulcanizing of 1200mm width feeder Belts
MTPS I Mill Plant Reconditioning of 2 Nos of damaged worn out worm shafts and lock nuts for the mills 3E 2F
MTPS I Mill Plant Reconditioning of worn out Journal Header assembly of XRP 803 Mills of Unit III
MTPS I Mill Plant Unit II Complete dismantling and reassembling of bowl assembly worm gear housing worm wheel mill bottom insulation cover plates renewal of vertical shaft upper radial bearing etc in Coal Mill 2C Tilting work
MTPS I MI Mill Plant Unit II Removal of worn out thinned out wall plates of bunkers 2B 2C 2F and erection of new wall plates of 12 mm thick MS plates and supporting beams and other related works
MTPS I TM Stage I Unit I II Overhauling and Load testing of 2 ton capacity EOT crane 3 Ton capacity electrical Hoists in LP Bypass valve LHS RHS and movable 1 ton chain block trolleys in pumps and Compressor area for the year 2025 26
MTPSI TM Unit IV Overhauling of OLCTC System Pump LHS RHS Inspection Cleaning of Condenser CW box steam side Hot well OLCTC System Ball collecting Screen Overhauling of 200 mm condenser air release cum vacuum breaking valve and Condenser Cooling
MTPS I TM Unit IV Cleaning and Hydraulic Testing of Lub oil Coolers and Working oil coolers Dismantling cleaning and assembling of Suction Strainers of BFPs and CEPs Renewal of BFP leak off line and suction discharge flange Gaskets Inspection
MTPS I Mill Plant Unit III Complete dismantling and reassembling of bowl assembly worm gear housing, worm wheel mill bottom insulation cover plates broken main vertical shaft renewal of vertical shaft and its bearings etc in Coal Mill 3F Tilting
MTPSI TM Unit II Overhauling of Beacon Rotork Ind modact actuator with Renewal of oil seals O rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during Unit II AOH 2025 26
MTPS I TM UNIT III Changing the defective BFP 3B discharge NRV as per IBR specification by IBR welding and replacement of the defective BFP Suction valve 3B changing the eroded drip line reducers expanders and changing the defective eroded plug broke
MTPS I TM Unit III Replacing the existing defective vent condenser tube nest by spare tube nest in Unit III during 2025 26
MTPS1 TM Unit II Overhauling of OLCTC System Pump LHS RHS Overhauling 1600 mm Butterfly valve and its actuator gear box of cooling water inlet and outlet pipe lines in condenser Inspection Cleaning of Condenser CW box steam side Hot well
MTPS I Mill Plant Reconditioning of worm shaft thrust bearing housing released from Unit IV Coal Mill
MTPS I Mill Plant Unit III Removal of worn out thinned out wall plates of bunkers 3E 3F and erection of new wall plates of 12 16 mm thick MS plates and supporting beams and other related works
MTPS I TM Unit IV Annual Overhauling and gasket renewing of Valves in Feed Water Main Condensate and Extraction Steam lines in Unit IV during Annual Overhauling 2025 26
MTPS I BM Unit II Rotating parts COH 2024 25 Overhauling reconditioning of CERM EERM gear boxes ID PA FD fans gate actuators and other related works etc
MTPS I M I CA CWS I Dismantling of the existing Sun shield roof with structure provided over the hot water basin to facilitate the renewal of Hot water header pipe line and allied works
MTPSI Mill Plant Unit III Overhaul of cold air dampers cold air gates and strengthening the cold air ducts during AOH 2025 26
MTPS I Mill Plant Unit IV Fabrication of various length of dia 40 NB cooling water pipe line with flanges and assembling in the cooler cover of mill 4A to 4F and Dismantling of seal air fan motor and overhauling reassembling setting the alignment
MTPSI Mill Plant Unit IV Overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder Renewal of hot air gate seal during Annual over hauling of 2025 26
MTPS I BM Unit II COH 2024 25 Strengthening of the eroded portions of ESP hopper ID fan casing FG duct from ESP inlet to chimney and Renewal of Deflector plate in the ID fan outlet side FG duct and other related works in both A and B sides
MTPS I BM Unit II COH 2024 25 Dismantling fabrication and erection of portion of Flue gas ducts from Economizer outlet to APH inlet of both A and B sides etc
MTPS 1 Mill Plant Unit III Attending the Break down Preventive maintenance works such as overhauling of journal assemblies spring compression assemblies hard facing of Clamping ring Bowl hub cover strengthening welding of journal header
MTPS I TM II Unit I Complete overhauling and painting of Service Air Compressors 1A 1B 1C
MTPS I TM Unit I Unit II Preventive Breakdown maintenance works and Repairing works of Air Compressors Make KG Khosla Model No 2HA2QT Air Dryers Make Khosla as and when required basis for a period of one year from the date of commencement
MTPS I TM Division Load Testing of 2Nos 125 30 T Station EOT Cranes during 2024 2025
MTPS I Mill Plant Reconditioning of worn out upper journal housing Released from Unit I to IV Mills
MTPS I Mill Plant Unit IV Removal of worn out thinned out wall plates of bunkers 4B 4D 4F and erection of new wall plates of 12 mm thick MS plates and supporting beams and other related works
MTPS I TM Unit I to IV Attending Breakdown maintenance works of tube puncture and gasket renewal work in LP Heaters Gland coolers Main Ejectors and Inspection Identification of punctured Spiral coils and attending puncture in HPH 5 6 7
MTPS I Mill Plant Unit II Complete dismantling and reassembling of bowl assembly worm gear housing worm wheel mill bottom insulation cover plates renewal of vertical shaft upper radial bearing etc in Coal Mill 2B Tilting work
MTPS I TM Unit IV Overhauling and Flange gasket renewing of valves in Heater Drain Pegging Steam to Deaerator Condenser air Auxiliary steam and Drain Water lines and gasket renewing of valves in Unit IV during AOH 2025 26
MTPS I TM UNIT I Replacing of the Defective HRH Stub valve VDAS 122 eroded HRH CRH HP LP bypass drain line to Flash Tank II connected headers and changing the eroded drip line reducers expanders bends of HD 1 2 14 15
MTPS I Mill Plant Unit I Complete dismantling of Mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub Mill bottom in Mill 1D
MTPSI TM UNITI Replacing the defective Main Steam Stop valves Left Right at Turbine end as per IBR Specification including drawl of Reconditioned valves from stores leading lifting erection alignment IBR Welding stress relieving of valves
MTPS I TM Unit I Overhauling of OLCTC System Pump LHS RHS Inspection cleaning of Condenser CW box steam side Hot well OLCTC System Ball collecting screen Overhauling of 200 mm condenser air release cum vacuum breaking valve and condenser
MTPS I TM Unit I Annual Overhauling and gasket renewing of Valves in Feed Water Main Condensate and Extraction Steam lines during Annual Overhauling 2025 26
MTPS I TM Unit I Overhauling and Flange gasket renewing of valves in Heater Drain Pegging Steam to Deaerator Condenser air Auxiliary steam and Drain Water lines and gasket renewing of valves in Unit I during AOH 2025 26
MTPS I Mill Plant Centralised AC Plant Attending Breakdown works in AC Compressor No 2 and 3 AC Cooling tower fans Air handling units Air washer system Circulating water pumps pipe lines and valves etc for a period of 365 days