Loading…
Loading…
6,236 results • Best match
MTPS I Mill Plant Unit III Removal of worn out thinned out wall plates of bunkers 3A 3B and 3C and erection of new wall plates of 12 16 mm thick MS plates and supporting beams and other related works
MTPS I BM Unit II Boiler pressure parts COH 2024 Erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
MTPS I CA CWS I Overhauling of sludge disposal pump and Cold and hot water tunnel vent valves Air Vent valves and gate valves including Painting of CT safety grills inside the fan stack area etc
MTPS I BM Unit II Removal of deteriorated and peeled off insulation and re insulation with new insulation materials on the Portion in ESP outlet common FG duct area ID fan 2B outlet FG duct horizontal vertical portion and ID fans casing area etc
MTPS TM I Overhauling Load testing and Certification of 15 Nos Chain Blocks of various capacities available in the area of Main Oil tanks Turbine Lub oil Coolers and Seal Oil Coolers in Unit I to IV during 2024 25
MTPS TM Unit I Cleaning and painting of inner and Outer portion of Receiver Tanks of 1 2 for Instrument Air and Service Air and renewal of Manhole door gaskets and Overhauling of Safety valves of Receiver Tanks Overhauling of Silica gel type Air drie
MTPS I TM Unit I Replacing the existing defective Constant variable load hangers by new load hangers after providing necessary scaffolding supporting arrangements during Unit I AOH 2025 26
MTPS I BM Unit I Removal of deteriorated and peeled off insulation and re insulation with new insulation materials on the Portion in ID fan 1A and 1B casing portion and other related works
MTPS I TM UNIT IV Replacing the defective valve VDAS 122 eroded Flash tank-I changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 2 drain line vent line valves pipes bends by IBR Non IBR
MTPS I BM Unit II COH 2024 25 Renewal of eroded Style 07 expansion joint Removal refixing and other related works etc in both A and B sides
MTPS I BM Unit II COH 2024 25 Flue Gas duct A and B sides Patch up works and other repair works between APH out let to ESP inlet
MTPS I MP UNIT III Rectification of Seal air fan bed of SAF 3A Reconditioning of fan impeller Housing Cover and Balancing of Impeller and Reconditioning
MTPS I BM Unit II COH 2024 25 Renewal of the eroded impeller wear plates with new one and Renewal of the damaged primary toothed gear coupling and other related works in ID fan 2B
MTPS 1 Mill Plant Unit IV Reconditioning of worn out journal shafts released from Unit I to IV
MTPS I BM Unit II Boiler Pressure parts AOH 2022 Reconditioning and Hard facing of used and Worn out square coal nozzle tips including SS304 plates and checking of deformation and matching with nozzle
MTPS I BM AOH 2021 Unit III Boiler pressure parts Rectification and replacement of overheated HRH coil header stub bends and other circuit bends at penthouse area and allied works
MTPS I TM Reconditioning of defective BFP Discharge NRVs ES 4 BFP suction and CEP discharge NRV with buildup ends
MTPS I Mill Plant Unit III Clearing the Mill rejects from Unit III Mill Feeder area weighing in departmental weigh bridge and transporting to rejects yard G switch yard area etc
MTPS I BM Pressure parts Units III and IV Boiler Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism cleaning and air washing of Boiler structures and floor and allied works for the period of 120 days from the date of co
MTPS I BM Unit III Boiler pressure parts AOH 2021 22 Rectification Replacement of defective Boiler tubes in 9th header and Economizer Coils at Boiler II pass area
MTPS 1 Mill Plant Unit II Attending the Break down Preventive maintenance works such as overhauling of journal assemblies spring compression assemblies mechanical face seal assembly renewal of vertical shaft thrust bearing etc
MTPS I BM Unit IV AOH 2022 23 Flue Gas duct B side Patch up works and other repair works between FG duct 45deg slope end to ESP inlet including the cost of materials
MTPS I BM Unit II AOH 2020 21 Complete overhaul of APH B side and other related works
MTPS I BM Unit I Boiler Pressure parts AOH 2023 Overhauling of HP LP valves and replacement of defective valves
MTPS I Mill Plant AC Plant Unit II COH 2024 25 Air Washer System Epoxy painting of blowers, discharge duct spray system and air filter platform area replacing the damaged 200 NB GI header pipe vibration pads Overhauling the Blower 2
MTPS I Mill Plant Unit II Dismantling and assembling of Coal pipe bends and Patch welding the eroded portions of Coal bends pipelines between Mill Outlet Elbow and Fuel Inlet Elbow during Capital overhaul 2024 25
MTPS I BM Unit II Boiler pressure parts COH 2024 Supply and installation of Air sealants in penthouse to avoid ash leakage air ingression to the boiler and allied works
MTPS I CA RWS Overhauling of Raw Water Pump No 02 and its butterfly valve dismantling fabrication and Erection and Painting of damaged raw water intake screens at Raw water pump house
MTPS I Mill Plant Unit II Reconditioning of head Pulleys of 36 Gravimetric Feeders released from Unit II
MTPS I Mill Plant Unit II Replacement of the existing eroded feeder discharge chutes in Mill 2C to 2F during COH 2024 25
MTPS I Mill Plant Unit II Complete dismantling of Mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub Mill bottom in any Mill 2A to 2F of Unit II
MTPS I Mill Plant Unit II Dismantling and assembling of fuel inlet Elbows and Hard facing of Fuel inlet Elbows long and short during Capital overhaul 2024 25
MTPS I BM Unit I Boiler pressure parts AOH 2023 Disposal of Ash from Pent house Eco hopper deflection slope rear arch room and boiler roof area strengthening of Eco hopper supports with new pipes and arresting of ash leakage in pent house etc
Mettur TPS I Mill Plant Units I to IV Cold Vulcanizing of 1200mm width feeder Belts
MTPS I BM Unit IV AOH 2022-23 Renewal Reconditioning of various Saw tooth expansion joints in FG ducts and Air ducts and other related works etc in both A and B sides
MTPS I TM UNIT IV Complete Overhauling of HP Bypass LP Bypass Spray Valves Oil Supply Unit during AOH 2024 2025
MTPS ITM Unit II Overhauling and Flange gasket renewing of valves in Heater Drain Pegging Steam to Deaerator Condenser air Auxiliary steam and Drain Water lines and gasket renewing of valves in Unit II during AOH 2023 24
MTPS I TM Unit IV Overhauling and Flange gasket renewing of valves in Heater Drain Pegging Steam to Deaerator Condenser air Auxiliary steam and Drain Water lines and gasket renewing of valves in Unit IV during AOH 2024 25
MTPS I Mill Plant Unit II Hard facing of 1mtr length coal pipes after MOE in Mills 2A to 2D during AOH 2020 21
MTPS I TM Unit III Overhauling of OLCTC System Pump LHS and RHS Inspection and Cleaning of Condenser CW box steam side Hot well and OLCTC System Ball collecting Screen Overhauling of 200 mm condenser air release cum vacuum breaking valve and Conde
MTPS I TM Unit I and Unit II Preventive Breakdown maintenance works and Repairing works of Air Compressors Make KG Khosla Model No 2HA2QT and Air Dryers Make Khosle on as ans when required basis for a period of 120 days in the year 2021 20
MTPS I CA CWS I Cooling Tower I Renewal of the existing damaged PVC fills with new fills rearranging the hanging fills along with SS GRP grid in Cooling Tower I during AOH 2024 2025 of Unit I
MTPS I - Civil Circle - Uprooting unwanted vegetation both sides of road from wet ash weigh bridge to cross bund road
MTPS I - Civil Circle - Painting the existing hand rails and providing toe wall to the hand rails of CT Unit IV at MTPS I
MTPS I CA CWS I Lifting the intake screens positioning cleaning and painting of intake screens frame Structures of Cooling Water Pumps 1A 1B and 1C of Unit I during Boiler statutory inspection work
MTPS I BM Unit I Boiler Statutory Inspection 2020 21 Flue Gas duct A side Patch up works and other repair works between APH outlet to ESP inlet.
MTPS1 BM Unit II Inspection Renewal of Guide bearing in Air pre Heater A and B sides and dismantling cleaning inspection and reassembling of air seal assembly etc and other related works during AOH 2025 2026
Mill Plant Unit II Applying two layers ceramic wear coat Eromat at mill outlet elbow Ceramic 90 deg bends released from Unit II during COH 2024 25
MTPS I Mill Plant Unit II Cutting removing of existing worn out mill separator body curved liners and erection of new MS liners in Mill 2A to 2F during COH 2024 25
MTPS I BM Lift Supply Erection and commissioning of Control Panel 1 No for Boiler Lift II of MTPS I