MTPS I TM Unit I Cleaning and Hydraulic Testing of Lub oil Coolers and Working oil coolers Dismantling cleaning and assembling of Suction Strainers of BFPs and CEPs Renewal of BFP leak off line and suction discharge flange Gaskets etc
MTPS I TM Unit I Overhauling of valves in Heater Drain Pegging Steam to Deaerator Condenser air Auxiliary steam and Drain Water lines in Unit I during AOH 2019 20
MTPS I BM Unit I Boiler Pressure Parts AOH 2019 Overhauling of secondary air dampers Scanner Air fans and its damper etc
MTPS I BM Unit I Rotating parts AOH 2019 Removal and Renewal of insulation in FG Ducts Air Ducts and Air Pre Heaters
MTPS I TM Carrying out Bullet cleaning of LHS and RHS of condenser tubes in Unit I condenser during AOH of 2019 20
MTPS I Mill Plant I Complete overhauling of gearbox Mechanical face seal assembly worm shaft assembly etc
MTPS I CA CWSI Cooling Tower I Overhauling of Flow Control Valves including reconditioning of worn out spares during AOH of Unit I
MTPS I BM Annual maintenance 2019 Unit I Boiler Replacement of defective Main steam stop valve and allied works
MTPS I Mill Plant AC Plant Unit I Annual overhaul Air Washer System Epoxy painting blower 1A and 1B Discharge duct and spray system Air filters renewal Replacement of blower bearing Water spray Nipples and Nozzles cleaning Flushing etc
MTPS I BM Unit I Boiler pressure parts AOH 2019 Rectification Replacement of defective Boiler tubes in water wall area steam cooled wall tubes and Inter pass area fin welding etc
MTPS I CA CWS I CT I Painting of Hot water basin sun shield roof doors and Cleaning the algae and other foreign materials on CT ID Fan blades safety grills inside the fan stack area gear boxes G B foundation in CTI during AOH of Unit I
MTPS I BM Unit I Annual maintenance 2019 20 A and B stream Boiler PA Fans FD Fans ID Fans and its isolation dampers and APH gear box
MTPS I BM Unit I Boiler Pressure Parts AOH 2019 Water washing of complete boiler Removal of heavy particle of soot deposited on water wall tube platen SH coil and Reheater coil Overhauling of water wall soot blowers and LRSB and allied works
MTPS I BM Unit I Boiler Pressure parts AOH 2019 Cleaning of boiler structures from 0 to 52 m level etc
MTPS I TM UNITI changing the eroded control valves reducers expanders pipes and bends Modification of Flange and allied works
MTPSI Mill Plant Unit I Rectification of 3 Nos Mill inner cone released from coal mill 1D to 1F and applying wear resistant Putty Eromat 1003 during AOH 2019 20
MTPS I TM UNIT I Complete Overhauling of HP Bypass Main Valves Model No ARS 72 LHS and RHS during AOH of 2019 20
MTPS I Mill Plant Unit I Dismantling reconditioning and assembling of fuel inlet elbows and Spool pieces Coal pipes during Annual overhaul 2019 20
MTPS I BM AOH 2019 Unit I Renewal Reconditioning of various Saw tooth expansion joints in FG ducts and Air ducts and other related works etc in both A and B sides
MTPS I TM Unit I Renewal of Gasket at water box side tube nest side condensate inlet and outlet flange inspection etc
MTPS I CA CWS I Overhauling of CT ID Fan gear boxes 6Nos including Static balancing of blades in Cooling Tower I and II
MTPS I TM Unit II Inspection and Rectification of chocked spiral coils 228 Nos in condensing zone and 2 Nos in De superheating zone in HPH 5 Unit II
MTPS I BM Unit I Rotating parts AOH 2019 Overhauling of CERM and EERM gear boxes patch up works and other related works in flue gas ducts between ESP inlet to chimney
MTPS I CA CWS II Reconditioning of released FRP fan blades 2 Sets of cooling tower ID fans of stage II
MTPS I TM Unit I Overhauling of Beacon Rotork Ind-modact actuator with Renewal of oil seals O rings wheel retainer ring etc
MTPS I Mill Plant Unit IV Clearing the Mill rejects from Unit IV Mill Feeder area weighing in departmental weigh bridge and transporting to rejects yard G switch yard area etc
MTPS I CA CWS I Dewatering sludge removal Complete cleaning and applying bleaching powder in the inner and outer rings and painting of MS structures in Clarifier I during AOH of Unit I
MTPS I CA CWS I Cooling Tower I Renewal of the existing damaged PVC fills with new fills rearranging the hanging fills along with SS GRP grid in Cooling Tower I during AOH of Unit I
MTPS I BM Unit I AOH 2019 FG Duct B side Renewal of Deflector plates renewal of duct supports etc
MTPS I BM Unit I AOH 2019 Flue gas duct A side Patch up works and other repair works between FG duct 45 degree slope end to ESP inlet
MTPS I BM Unit I Annual overhauling 2019 20 Overhaul of ESP AB pass internals and related works
MTPS I CA CWS I Overhauling of 1600 mm BFV including Actuator GB Overhauling checking and renewal of Nitril rubber seal and Painting of Intake Screen of Cooling water Pumps 1A 1B and 1C during AOH of Unit I
MTPS I BM Unit I AOH 2019 FG Duct A side Renewal of Deflector plates renewal of duct supports etc
MTPS I BM Unit I Boiler Pressure Parts AOH 2019 Maintenance of Burners and replacement of worn out fasteners at cover plates
MTPS I BM Unit I Annual overhauling 2019 20 Overhaul of ESP CD pass internals and related works
MTPS I BM Unit I Boiler pressure parts AOH 2019 Safety Valve Floating by Trevitest Method
MTPS I BM Unit I Boiler Pressure Parts AOH 2019 Reconditioning of worn out damaged fin welding Renewal of worn out damaged peephole door and allied works
MTPS I BM Unit I AOH 2019 Flue gas duct B side Patch up works and other repair works between FG duct 45 degree slope end to ESP inlet
MTPS I BM Unit IV Rotating parts AOH 2019 Overhauling Reconditioning of CERM and EERM gear boxes ID PA FD fans gate actuators and other related works etc
MTPSI Mill Plant Unit IV Overhauling of tramp iron chute knife edge gate valves and laying of pneumatic line in Mill 4A to 4F during AOH 2019 20
MTPS I BM Unit IV Boiler Pressure Parts AOH 2019 Overhauling of HP LP valves and replacement of defective valves
MTPS I BM Unit IV Boiler AOH 2019 Rectification Replacement of Defective tubes in water wall area S panel area Water wall reducer tubes inter pass area steam cooled wall tubes and fin welding at I and II pass area
MTPS I TM Unit IV Overhauling and commissioning of Heater Drip Pump 4A and 4B during AOH of 2019 20
MTPS I TM Unit IV Removal of Insulation and providing Re Insulation to Pipe Lines Valves Gland Steam Cooler Low Pressure Heater Flash tank and its accessories etc
MTPS I Mill Plant Unit IV Renewal of Existing Insulation and G I sheets in Hot air ducts during AOH 2019 20
MTPS I BM Unit IV AOH 2019 Flue gas duct B side Patch up works and other repair works between FG duct 45 degree slope end to ESP inlet including cost of materials
MTPSI BM Unit IV AOH 2019 ESP CD Pass Hoppers Strengthening of the welding joints patch welding the eroded portions and the other related works etc
MTPS I Mill Plant UnitIV Overhauling of classifier assemblies venturi vanes venturi Collars etc during annual overhaul 2019 20
MTPS I BM Unit IV Boiler Pressure Parts AOH 2019 Overhauling of secondary air dampers Scanner Air fans and its damper flap gate Reconditioning of damaged wind box compartment dampers guide plates insulation etc
MTPS I TM Carrying out Bullet cleaning of LHS and RHS of condenser tubes in Unit IV condenser during AOH of 2019 20