MTPS I TM UNIT III Complete Overhauling of HP Bypass and LP Bypass Spray Valves and Oil Supply Unit during COH of 2019 20
MTPS I Mill Plant Unit III Hard facing of Mill Discharge valve body 24 Nos in Mills 3A to 3F during COH 2019 20
MTPS I BM DM Plant Neutralizing pits below ground level Size 9.5m X 6.5M X 3.5m cleaning and removing of sludges of acidic alkaline and lime slurry formed during neutralization of effluent water in neutralizing pits of Stage I and II
MTPS I TM Unit III Overhauling of TLOCBPs H2CBPs Hydrazine Dozing Pumps and Phosphate Dozing Pumps during capital Overhaul of 2019 20
MTPS I TM UNIT III Gasket renewing of 600 500 350 300 250 200 150 mm Valves Gasket renewing of 350 300 200 150 mm cooling line orifice plates Flanges in Unit III during Overhauling COH 2019 20
MTPS I TM Unit III Inspection of Condenser tubes flaring and torque setting by using special tools Tube sheets Cleaning degreasing and Epoxy coating to the thickness of 1500 Microns on condenser tube sheets of the condenser and Cleaning sand bl
MTPS 1 Mill Plant Unit IV Overhauling load testing and certifying of lifting tools and movable trolleys
MTPS I BM DM Plant Providing new rubber lining and refixing the Frontal piping system of Stream II Ion Exchangers in Stage II DM Plant
MTPS I BM Unit III COH 2019 20 ESP CD Pass Hoppers Strengthening of the welding joints patch welding the eroded portions and the other related works etc
MTPS I BM Unit III Rotating Parts COH 2019 Removal and Renewal of insulation in Air Pre Heaters A and B and Eco outlet to APH inlet side
MTPS I BM Unit III Rotating Parts COH 2019 Removal and Renewal of insulation in FG ducts Air ducts and Air Pre Heaters
MTPS I BM Unit III Boiler Pressure Parts COH 2019 Cleaning of boiler structures from 0 to 52 m Level etc
MTPS I BM Unit III Rotating Parts COH 2019 20 Overhauling Reconditioning of CERM and EERM gear boxes ID PA FD fans gate actuators and other related works etc
MTPS I Mill Plant Unit III Hot air ducts welding of eroded and wornout portion of hot air duct joints and providing guard plates for the expansion joints and allied works
MTPS I BM Unit III Boiler pressure parts COH 2019 Reconditioning of worn out damaged fin welding Renewal of worn out damaged manhole door assembly Header shield plates etc
MTPS I BM Unit-III COH 2019 20 ESP AB Pass Hoppers Strengthening of the welding joints patch welding the eroded portions and the other related works etc
MTPS I BM Unit III Boiler COH 2019 Removal of Skin casing sheet and Insulation in Boiler Ist pass Inter pass and IInd Pass area MSL HRH Header inside the pent house and HP LP valves etc
MTPS 1 TM Unit III Removal of insulation and providing re insulation to pipe lines and valves Deaerator main flange Vent condenser gland steam cooler low pressure heater flash tank II and its accessories etc
MTPS 1 CA CWS II painting of Roof truss above the hot water basin on eastern and western side of cooling tower III during COH 2019 20
MTPS I CA CWS II Overhauling of 20 Nos flow control valve complete assembly and renewal of its worn out components and patch welding of FVC nozzle pipe in cooling tower III during COH of unit III
MTPS I CA CWS II Painting the outer surface of Hot water header pipes pipe supports hot water raiser pipes with support structure Hot water header drain pipe line and FCV in Cooling tower III during COH 19 20
MTPS I TM Reconditioning of 2 Nos defective Cartridge of Boiler Feed Pump Model FK6D 30 Cartridge No 85020 and 88016 released from BFP 1C and 2B
MTPS I TM I Unit III Inspection Overhauling and Renewal of gaskets of Turbine Lub oil line valves NRVs Overhauling of JOP Oil line valves and Renewal of existing worn out cooling water pipe line of inlet outlet and vent pipes of TLOC SOC AC etc
MTPS I TM Unit III Inspection and Complete Overhauling of Voith Hydraulic Coupling of Boiler Feed Pump 3C and 3B during COH 2019 20
MTPS I BM Unit III Rotating Parts COH 2019 Cutting Patch welding on the eroded portion of the duct above expansion joint style 07 and renewal of eroded duct support pipes both A and B sides
MTPS I TM Reconditioning of defective Beacon Rotork Actuators including replacement of worn out spares of Actuators during 2018 19
MTPS I TM I Lifting Cleaning Inspection and Re conditioning of Lifting tackle of HP IP and LP Casings Rotors TG Bearing and Obtaining load test certificate during 2018 19
MTPS I BM Unit III Boiler Pressure Parts COH 2019 Safety Valve Floating by Trevitest method
MTPS I CA CWS I Overhauling of CT ID Fan gear boxes 4 Nos including Static balancing of blades in Cooling Tower I and II
MTPS I CA CWS II Complete dismantling inspection overhaul including renewal of worn out pump components and assembling in any 2 Nos CWPs of stage II
MTPS I Mill Plant AC Plant Unit III Capital overhaul Air Washer System Epoxy painting blower 3A and spray system Enamel painting the pipe lines Replacement of blower bearing Overhauling the AWCW Pump 3C Overhauling of Gate valves spray nozzles etc
MTPS1Mill Plant Unit I Break down Preventive maintenance works such as overhauling of journal assemblies spring compression assemblies mechanical face seal assembly renewal of vertical shaft thrust bearing worm shaft thrust and radial etc
MTPS 1 Mill Plant Unit IV Break down Preventive maintenance works such as overhauling of journal assemblies spring compression assemblies mechanical face seal assembly renewal of verti
MTPS I TM Providing of 1No Diesel driven Tata Sumo Chevrolet Tavera of 9 1 seating capacity or an equivalent Vehicle on hire basis including driver for the official use of EE TM for the period of one year from 01 08 2019 to 31 07 2020
MTPS I TM Unit III - Renewal of suction Guide O Rings renewal gaskets for BFP 3A3B and 3C Replacement of NDE Mechanical seal assy and inspection etc
MTPS I CA RWS De watering sludge removal cleaning with bleaching powder complete overhauling of flocculator drive mechanism renewal of traction drive wheels assembly etc
MTPS I Mill Plant Unit III Dismantling hard facing and assembling of 1mtr length coal pipes after MOE in Mills 3A to 3F during COH 2019 20
MTPS I BM Lift Operation of Boiler Lifts I to IV and attending routine maintenance and Minor repair works of Boiler Lift II and its accessories for 180 days from the date of commencement of works
MTPS I ACE M I Circle Providing of one number Diesel driven Ambassador Car Tata Indica Tata Indigo or Equivalent car including driver on hire basis for the official use of Additional Chief Engineer Mechanical I MTPSI
MTPS I TM Unit III Reduction of auxiliary power consumption by conversion of 5 stages to 4 stage in condensate Extraction Pump 3A and 3B and erection and commissioning of modified 4 Stage pumps CEP 3A and 3B in Unit III
MTPS TM Unit III Air Compressor System Renewal of Manhole door gaskets and Overhauling of Safety valves of Receiver Tanks Replacement and Overhauling of 150 mm gate valves and NRVs of Instrument Air and Service Air lines and allied works
MTPS I TM I Overhauling Load testing and Certification of 15 Nos Chain Blocks of various capacities available in the area of Turbine Lub oil Coolers Seal Oil Coolers and Main Oil tanks in Unit I to IV during 2018 19
MTPS I BM Lift Operation of Boiler Lifts I to IV and attending routine maintenance and Minor repair works of Boiler Lift II and its accessories for 120 days from the date of commencement of works
MTPS I BM Units I and II Boiler Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism cleaning and air washing of Boiler structures and floor and allied works
MTPS I Mill Plant AC Plant Air Handling Unit Model 7 Switch yard AHU II, Conference hall AHU III and Air Handling Unit Model 5 ESP II AHU II, ESP III AHU I etc
MTPS I CA FP Break down Preventive maintenance works such as Patch welding in hydrant header Replacement of Fire hydrant post dismantling and allied works
MTPS I TM I Reconditioning of the damaged Water Tank of Electric Oil Heater in Pennwalt Centrifuge 3A during 2019 20
MTPS I CA CWS II Fabrication and erection of Platform around the air release valves in stage 2 Cooling Water pump discharge pipe lines and renewal of cable trench dewatering pump discharge line in CWPH stage2
MTPS I Mill Plant Unit II Clearing the Mill rejects from Unit II Mill Feeder area weighing in departmental weigh bridge and transporting to rejects yard G switch yard area coal yard by using contractors vehicle and unloading the same and
MTPS I BM Unit III and IV AOH 2019 Reconditioning and Hard facing of used and worn out square coal nozzle tips and checking of deformation and matching with nozzle