Loading…
Loading…
6,236 results • Best match
MTPS I Mill Plant Unit II Rectification of 4 Nos Mill inner cone released from coal mill 2A to 2D and applying wear resistant Putty (Eromat 1003) during AOH 2019 20
MTPS I BM Unit II Rotating parts AOH 2019 20 Overhauling of CERM and EERM gear boxes patch up works and other related works in flue gas ducts between ESP inlet to chimney
MTPS I Mill Plant Unit II Dismantling hard facing and assembling of 1mtr length coal pipes after MOE in Mills 2A to 2D during AOH 2019 20
MTPS I TM Unit II Inspection and Complete Overhauling of Voith Hydraulic Coupling of Boiler Feed Pump 2C during AOH 2019 20
MTPS I MP Unit II Dismantling and replacement of wornout eroded coal pipes 5 Nos in Coal Mills 2A 2B 2C and 2D during AOH 2019-20
MTPSI Mill Plant Unit II Hard facing of Mill Discharge valve body 24 Nos in Mills 2A to 2F during AOH 2019 20
MTPS I Mill Plant Unit I to IV Cold vulcanizing of 1200mm width feeder belts
MTPS I Mill Plant Unit II Hard facing of Spool Pieces of 1Mtr length in Mill 2A to 2F during AOH 2019 20
MTPS I BM Unit II Boiler pressure parts AOH 2019 Maintenance of Boiler drum and all safety valves
MTPS I Mill Plant Unit II Overhaul of Hot air gates and Cold air gates Hot air damper and Reconditioning of Hot air gate power cylinder during Annual overhaul 2019 20
MTPS I CA Fire Protection Checking of Deluge valves Cleaning of spray nozzles and Frangible glass bulb detectors in Emulsifyre system of GT UAT MOT COT and DOT of UnitI to IV and ST I and II during Unit Annual Overhauling period of 2019 20
MTPS I BM Unit II Rotating parts AOH 2019 Removal and Renewal of insulation in FG Ducts Air Ducts and Air Pre Heaters
MTPS I Mill Plant Unit II Reconditioning of mill outlet elbow 8 Nos released from Unit II during AOH 19 20
MTPS I BM Unit II AOH 2019 Cutting and patch welding on the eroded portion of the duct above expansion joint style 07 and renewal of eroded duct support pipes both A and B sides
MTPS I BM Unit II Boiler pressure parts AOH 2019 Servicing of various size actuators and allied works
MTPSI Mill Plant Unit II Hard facing of Fuel inlet elbows Long and short during AOH 2019 20
MTPS I TM Unit II Cleaning and Hydraulic Testing of Lub oil Coolers and Working oil coolers Dismantling cleaning and assembling of Suction Strainers of BFBPs and CEPs Renewal of BFP leak off line and suction discharge flange Gaskets etc
MTPS I BM Unit II Boiler pressure parts AOH 2019 Disposal of Ash from Eco hoper deflection slope rear arch room and boiler roof area and strengthening of Eco hopper supports with new pipes and allied works
MTPS I BM Unit II Boiler pressure parts AOH 2019 Water Washing of complete boiler Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and Reheater coil etc
MTPS I TM Unit I Inspection and Rectification of chocked spiral coils 228 Nos in condensing zone in HPH 5 Unit I
MTPS I MP Unit IV Clearing the Mill rejects from Unit IV Mill Feeder area weighing in departmental Weigh bridge and transporting to reject yard G switch yard Area coal yard by using contractors vehicle and Unloading the same and return
MTPS I TM Unit II Inspection and Rectification of feed water pressure drop across HPH 5 by removing the drain cooling zone spiral coils 32 Nos conducting boroscope test cleaning the sediments foreign materials in feed water etc
MTPS I TM Unit III Overhauling of OLCTC System Pumps LHS RHS Inspection and Cleaning of Condenser CW box steam side Hot well OLCTC System Ball collecting screen welding etc
MTPS I TM Unit III Servicing Reconditioning and assembling of existing Ball Separator Assemblies with allied works for OLCTC System LHS and RHS during COH 19 20
MTPS I TM Unit III Overhauling of Beacon Rotork Ind modact actuators with Renewal of oil seals O rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during Unit III COH 2019 2
MTPS I TM UNIT III changing the eroded control valves reducers expander pipes and bends and defective 1 inch and 2 inch drain line and vent line valves by IBR and Non IBR Welding in Unit III during Capital Overhauling 2019 20
MTPS I Mill Plant Unit III Complete inspection of Mill internals reconditioning renewal of worn out parts and bearings replacement of eroded worm wheel with worm shaft etc in Mill 3D during COH 19 20
MTPS TM Unit III Overhauling and renewal of flange gaskets of Valves in Feed Water Main Condensate and Extraction Steam lines during Capital Overhaul 2019 20
MTPS I TM Unit III Overhauling of valves and renewal of flange gaskets in Heater Drain Pegging Steam to Deaerator Condenser air Auxiliary steam and Drain Water lines etc
MTPS I TM Units III Renewal of Gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of LPH 1 2 3 and 4 GC 1 and II and vent condenser etc
MTPS I Mill Plant Unit III Complete inspection of Mill internals reconditioning renewal of worn out parts and bearings replacement of eroded worm wheel and worm shaft etc in Mill 3F during COH 2019 20
MTPS I Mill Plant Unit III Reconditioning of 08 Nos Head Pulleys for 36 inch Gravimetric Feeders
MTPS I BM Unit III Boiler COH 2019 Rectification Replacement of Defective Boiler tubes in 9th header and Economizer Coils at Boiler II pass area
MTPS I BM Unit III Capital maintenance 2019 20 A and B Stream Boiler PA fans FD fans and ID fans and its isolation dampers and APH gear box
MTPSI BM Unit III Boiler pressure parts COH 2019 Erection and operation of sky Climbers for assisting various maintenance works and dismantling of sky climbers
MTPS I BM Unit III Boiler Pressure parts COH 2019 Overhauling of HP LP valves and replacement of defective valves
MTPS I BM Unit III Boiler Pressure parts COH 2019 Servicing of various size actuators and allied works
MTPS I BM Unit III Boiler COH 2019 Overhauling of secondary air Dampers Scanner Air Fans and its damper flap gate etc
MTPS I Boiler Rotating parts Units III and IV Preventive Breakdown maintenance Works and other allied works as and when required basis
MTPS I BM Unit III COH 2019 Renewal Reconditioning of various saw tooth expansion joints in FG ducts and Air ducts and other related works etc in both A and B Sides
MTPS I BM Unit III Boiler Pressure parts COH 2019 Maintenance of boiler drum and all safety valves
MTPS I BM Unit III Inspection Renewal of guide bearing in Air Pre Heater A and B sides and Dismantling Cleaning Inspection and Reassembling of air seal assembly etc
MTPS I BM Unit III Capital Overhauling 2019 20 Overhaul of ESP AB Pass Internals and related works
MTPS I Mill Plant Unit III Fabrication of MS bend 10 degree 15 degree and 22 degree 8 Nos to suit dia 508mm X 12.7mm thick coal pipe line and hard facing of existing New MS bends 19 Nos during COH 2019 20
MTPS I BM Unit III Capital Overhauling 2019 20 Overhaul of ESP CD Pass Internals and related works
MTPS I BM Unit III Boiler COH 2019 Arresting the air ingress ash leakage in Ist pass Penthouse area with an advanced ceramic fiber sealing system and allied works
MTPS I BM Unit III COH 2019 Tube thickness survey Water wall buffing providing platform Renewal of shrouding and allied works etc
MTPS I Mill Plant Unit III Hard facing of Fuel inlet elbows Long and short during COH 2019 20
Mettur TPS I Mill Pant Unit III Renewal Reconditioning of the Worn out Mill under bowl Door frames and Doors in Mills 3A to 3F during Capital Overhaul 2019 20
MTPS I Mill Plant Unit III Overhaul of Hot air gates and Cold air gates Hot air damper and Reconditioning of Hot air gate power cylinder during Capital overhaul 2019 20