MTPS I MP Unit II overhauling of classifier assemblys replacement repairing of eroded inner cones inner cone drum section venturi vanes venturi Collars and Strengthening of worn out mill top separator body during Annual overhaul 2019
MTPS I BM Unit II Boiler pressure parts AOH 2019 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
MTPS I BM Unit II AOH 2019 Flue gas duct B side Patch up works and other repair works between FG duct 45 deg slope end to ESP inlet
MTPS I CA CWS I Overhauling of sludge Disposal pump and valves during AOH of Unit II
MTPS I TM Unit I Inspection and Rectification of feed water pressure drop across HPH 5 by removing the drain cooling zone spiral coils 32 Nos conducting boroscope test cleaning the sediments foreign materials in feed water Header etc
MTPS I CA CWS I CT II Painting of Hot water basin sun shield roof doors and Cleaning the algae and other foreign materials on CT ID Fan blades safety grills inside the fan stack area gear boxes G.B.foundation in CT II during AOH of Unit II
MTPS I BM Unit II AOH 2019 FG Duct A side Renewal of Deflector plates renewal of duct supports renewal of guard plates over the expansion joints renewal of splitter plate and patch welding the eroded portion etc
MTPS I BM Unit II AOH 2019 FG Duct B side Renewal of Deflector plates renewal of duct supports renewal of guard plates over the expansion joints renewal of splitter plate and patch welding etc.
MTPS I BM Unit II AOH 2019 Flue gas duct Patch up works and other repair works between APH outlet to 45 deg slope end both A and B sides
MTPS I TM Unit II Changing the eroded control valves reducers expanders pipes and bends and defective 1 inch and 2 inch drain line and vent line valves Replacement of 2inch valves 4 Nos in HPT Transfer pipe line etc
MTPS I TM Unit II Removal of Insulation and providing Re Insulation to Pipe Lines Valves Gland Steam Cooler Low Pressure Heater Flash tank and its accessories and disposal of waste insulation materials for Unit II during Annual overhaul 2019-20
MTPS I BM Unit II Boiler pressure parts AOH 2019 Rectification Replacement of defective boiler tubes in Economiser and LTSH coil and drain line repair work
MTPS I BM Unit II Boiler pressure parts AOH 2019 Overhauling of HP LP valves and replacement of defective valves
MTPS I Mill Plant Unit IV Clearing the Mill rejects from Unit IV Mill Feeder area weighing in departmental Weigh bridge and transporting to reject yard G / switch yard Area/coal yard by using contractors vehicle and Unloading the same and return etc
MTPS I CA CWS I Overhauling of 1600 mm BFV including Actuator GB Overhauling checking and renewal of Nitril rubber seal and Painting of Intake Screen of Cooling water Pumps 2A 2B and 2C during AOH of Unit II
MTPS I TM I Unit II Annual Maintenance work in Main Turbine and its Auxiliaries during 2019 20
MTPS I Mill Plant Unit II Overhauling of tramp iron chute knife edge gate valves and laying of pneumatic line in mills 2A to 2F during AOH 2019 20
MTPS I BM Unit II Boiler pressure parts AOH 2019 Overhauling of secondary air dampers Scanner Air fans and its damper flap gate Reconditioning of damaged wind box compartment dampers guide plates insulation etc
MTPS I BM Unit II Boiler pressure parts AOH 2019 Rectification Replacement of defective boiler tubes in water wall area steam cooled wall tubes and inter pass area fin welding etc
MTPS I Mill Plant Unit II Hot air ducts Welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion joints in hot air ducts 2A to 2F during Annual overhaul 2019 20
MTPS I Mill Plant Unit II Renewal of Coal pipe bends ceralin bends and Patch welding the eroded portions of Coal bends and pipelines between Mill Outlet Elbow and Fuel Inlet Elbow during Annual overhaul 2019 20
MTPS I BM Unit II Annual maintenance 2019 20 A and B stream Boiler PA Fans FD Fans ID Fans and its isolation dampers and APH gear box
MTPS I Mill Plant Unit II Strengthening Rectification of raw coal bunkers 2A 2B 2C and 2F leak arresting work by patch welding and Providing stiffeners during AOH 2019 -20
MTPS I Mill Plant Unit II Fabrication of various size MS bend 10 deg 15 deg 20 deg 23 deg 5 Nos if necessary to suit dia 508mm X 12.7mm thick coal pipe line and hard facing of existing New MS bends during AOH 19 20
MTPS I BM Unit II Boiler pressure parts AOH 2019 Reconditioning of worn out damaged fin welding Renewal of worn out damaged peephole door and manhole door assembly header shield plates overhauling of peep hole manhole door assemblies and allied works
MTPS I CA CWS I Cooling Tower II Overhauling of Flow Control Valves Including reconditioning of worn out spares during AOH of Unit II
MTPS I BM Unit II Annual maintenance 2019 20 Overhaul of ESP CD pass internals and related works
MTPS I BM Unit II Annual maintenance 2019 20 Overhaul of ESP AB pass internals and related works
MTPS I BM Unit II Boiler pressure parts AOH 2019 Removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc.,
MTPS I TM Unit II Overhauling of TLOCBPs H2CBPs Hydrazine Dozing Pumps and Phosphate Dozing Pumps during Annual Overhaul of 2019 20
MTPS I BM Unit II AOH 2019 Renewal Reconditioning of various Saw tooth expansion joints in FG ducts and Air ducts and other related works etc in both A and B sides
MTPSI Mill Plant AC Plant Unit II Air Washer System Epoxy painting the blower 2A and 2B Discharge duct and the spray system Enamel painting the circulating water pump pipe lines Overhauling the AWCW Pump 2A and commissioning etc
MTPS I TM Unit II Overhauling of OLCTC System Pump LHS and RHS 200mm condenser air release cum vacuum Breaking valve and its isolation gate valves and gear mechanism condenser cooling water box drain valves CW box air vent valves etc
MTPS I Mill Plant Unit III Clearing the Mill rejects from Unit III Mill Feeder area weighing in departmental Weigh bridge and transporting to reject yard G switch yard Area coal yard by using contractors vehicle etc
MTPS I TM Carrying out Bullet cleaning of LHS and RHS of condenser tubes in Unit II condenser during AOH of 2019 20
MTPSI Mill Plant Unit II Dismantling reconditioning and assembling of fuel inlet elbows and fabrication of various length of coal pipe with collar and welding both the collar to the coal pipe during Annual overhaul 2019 20
MTPS I BM Unit II Boiler Pressure parts AOH 2019 20 Reconditioning and Hard facing of used and Wornout square coal nozzle tips and checking of deformation and matching with nozzle
MTPS I TM Unit II Overhauling of Beacon Rotork Indmodact actuator with Renewal of oil seals O rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft etc.
MTPS I BM Unit II Boiler AOH 2019 20 Reconditioning and hard facing of used and worn out coal nozzles fixing of divider plates and allied works
MTPSI Mill Plant Unit II Complete overhauling of gearbox Mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc.
MTPS I TM Unit II Overhauling and renewal of flange gaskets of valves in Feed Water Main Condensate and Extraction Steam lines during Annual Overhaul 2019 20
MTPS I CA CWS I De watering sludge removal Complete cleaning applying bleaching powder in the inner and outer rings and painting of MS structures in Clarifier II during AOH of Unit II
MTPS I BM Unit II AOH 2019 Complete overhaul of APH B side and other related works
MTPS I TM Unit II Overhauling and Renewal of Gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of LPH 3 and 4 GC 1 etc.
MTPS I BM Servicing of sky climber drive and its auxiliaries reconditioning of sky climber bed and platform materials and overhauling of gear box assemblies etc for the year 2019 20
MTPS I BM Unit II AOH 2019 Complete overhaul of APH A side and other related works
MTPS I MP Unit II Dismantling, patch welding and assembling of Mill outlet elbows Mill discharge valve bodies orifices Transition pieces fabrication of spool piece Multiple port outlets and rectification of hanger support etc in Mills 2A to 2F
MTPS I Mill Pant Unit II Renewing Reconditioning of the worn out Mill under bowl Door frames and Doors in 2A to 2F Mills during Annual Overhaul 2019 20
MTPS I BM Unit II Boiler Pressure parts AOH 2019 Safety Valve Floating by Trevitest Method
MTPS I BM Unit II Boiler Pressure parts AOH 2019 Cleaning of boiler structures from 0 to 52 m level etc