Loading…
Loading…
5,521 results • Best match
Krishnagiri dt Strenthening of Road From Shoolagiri- Berigai road to sadhepuram road Via Vempalli upto shoolagiri Dam KM 3450 4400 Ho Shoolagiri SGI-49
Rehabilitation of Right Main Canal of Manjalar Dam from LS 0 m to 6750 m in Devathanapatti Village of Periyakulam Taluk in Theni District
Gate Chain W132 as per drawing 3-48-003-59763 and SQP ref QP: SQP: DAM: 501 Rev 01 dt 28/12/15 (Q3)
Repair to vertical lift gate shutters in old existing spillway vent 1,2,3 with hoisting arrangements in Manimukthanadhi Dam in Sankarapuram Taluk of Kallakurichi District.
Provision of LED street Light Arrangements and LTUG cable to the Road In-between In-Gate and Gallery of Mordhana Dam in Vellore District.
Renewal of Electrical Installations, LED Flood lights, motor pumps and power mains Arrangements to the Gallery and Shutter of Mordhana Dam in Vellore District.
Special Repairs to KRP Dam LMC at LS 0.00 km to 4.00 km and 4.50 km to 5.30 km in Krishnagiri Taluk and District.
Krishnagiri DT - AGAMT 2021-22 - Veppanapalli Block - Desiliting of Ivyer eri and Strengthing of bund, Construction of new sluice and new surplus weir at Chinnabomarasanapalli H/o Veppanapalli - Package No - TN-04-KRI-105
Krishnagiri DT - AGAMT 2021-22 - Veppanapalli Block - Desiliting of Dasirapalli eri and Strenthing of bund, Repair of sluice and repair of surplus weir at Dasirapalli H/o Naduvanapalli - Package No - TN-04-KRI-110
Krishnagiri DT - AGAMT 2021-22 - Veppanapalli Block Desiliting of P.K.Pethanapalli Periya eri and Strenthing of bund, sluice repair and repair of surplus weir at P.K.Pethanapalli H/o P.K.Pethanapalli Package No - TN-04-KRI-126
PROVIDING DISTRIBUTION MAIN AT WARD NO.1 MANJALAR DAM KUDIYIRUPPU AND GANDHI NAGAR, WARD 14 COLONY STREET IN DEVADANAPATTI TOWN PANCHAYAT
Construction of Culverts at Edapalayam Lake adjacent to Cuddalore - Chithoor road and construction of weir at Karayanchetti Eri and Varathukulam in Melathikkan Panchayat in Package No. TVM/2024-25/67 under State Scheme Savings Fund
Krishnagiri District Kelamangalam Block under AGAMT 2022_2023 Construction of Weir and Desilting of Odasai Eri and Strengthening of Bund and Retaining wall 1No and Providing Threshing Floor 1No in Pillayar Agraharam Panchayat Package No TN_KLM_006
S&I of Water Pump, Horizontal split Case type, Capacity 83.33 LPS Min, Total Head 80M, RPM 1800, Body CI. Make Beacon Weir/ Best & Crompton, Model SDCC 125 150 (or) equivalent with same mounting dimen
Rehabilitation and Improvements of Kelavarapalli dam and park under DRIP - II in Hosur Taluk of Krishnagiri District. (Hydro Mechanical works) - IBRD loan No. 9181 IN
Providing Distribution pipe line with 125mm dia 1000m and 50mm dia HDPE 1000m 40mm dia 700m and 32mm dia 200m GI Pipe Sholayar dam Eadathukarai
Providing Distribution pipe line with 125mm dia 1000m and 50mm dia HDPE 1000m 40mm dia 700m and 32mm dia 200m GI Pipe Sholayar dam Eadathukarai
Repair and renewal of river sluice 4 Nos. and head sluice shutter and its appurtenant structures in Manimuthar Dam in Ambasamudram Taluk of Tirunelveli District
Nagercoil Corporation Annual Maintenance of Mukkadal Dam to Krishnankovil Filter house Gravity line including Rectification of repair leak work in 400mm, 600mm, 800mm PSC pipe.
Strengthening of the Vaniyandhal to Muniyappar kovil road km 1.660 and Strengthening of the Sangarapuram Manimutharu Dam To Ranganthapuram Road km 1.210 in Kallakurichi Block
Costruction of Threshing Floor at Near Ramanathi Dam Road in Keelakadayam Panchayat in Kadayam Panchayat Union Tenkasi District AGAMT II 2021-22 Package No.4
Strengthening of Sambankulam-Kadana dam road 0/0 - 1/920 in Kadayam panchayat union in Tenkasi District under NABARD RIDF 2026-27 Pack No.06
Removal of hyacinth, floating materials, debris and other obstructions from Upstream side of Jafferkhanpet bridge to downstream side of Nandambakkam Check Dam in Chennai District.
Clearing of floating debris accumulated at trash rack (grids of panel) and nearby barrage gates, intake pool at water level such as Hyacinth, grass, thorns, weeds, logs, dead animals etc., and disposing the collected debris and cleaning the Mechani
Clearing of floating debris accumulated at trash rack (grids of panel) and nearby barrage gates, intake pool at water level such as Hyacinth, grass, thorns, weeds, logs, dead animals etc., and disposing the collected debris and cleaning the Mechani
Clearing of floating debris accumulated at trash rack (grids of panel) and nearby barrage gates, intake pool at water level such as Hyacinth, grass, thorns, weeds, logs, dead animals etc., and disposing the collected debris and cleaning the Mec
Providing One number either a diesel driven Ambulance Van or Petrol driven Maruthi Ambulance van with all vital life support such as oxygen, stretcher, etc., on hire basis for the official use of employees of Mettur Workshop Circle Mettur dam for t
Krishnagiri District Shoolagiri Block under AGAMT II 2021-22 Strengthening of Bund and repairs to weir and Construction of Baby pond with Retaining wall and Bhathing ghat in Pedhasigarapalli Panchayat Package No TN-04-KRI-214
Krishnagiri Dt Bargur Block AGAMT II 2022_23 2 Works For Strengthening of Bund, Weir Repair, Revetment work at MGNREGS Pond and Providing Link Drainage at Madepalli Near Burial Ground (40M) at Madhepalli Panchayat Package No BRG_31
Krishnagiri DT - AGAMT II 2021-22 Mathur Block - Desilting of Tank and construction of New weir and Desilting of Kuttai and construction of Retaining wall at Bommepalli and Goundanur Panchayat 3 works TN-04-KRI-410
Improvement works on the downstream side of the Periyar Vaigai 3 Weir by providing cladding wall to protect the left flank embankment and allied works at Periyar Vaigai Small Hydro Electric Power Station in Theni District
Krishnagiri dt Shoolagiri Block Strenthening of Road From Shoolagiri- Berigai road to sadhepuram road Via Vempalli upto shoolagiri Dam KM 2700 3450 Ho Shoolagiri SGI-48
Krishnagiri dt Shoolagiri Block Strenthening of Road From Shoolagiri- Berigai road to sadhepuram road Via Vempalli upto shoolagiri Dam KM 1950-2700 Ho Shoolagiri SGI-47
Supply of Labour / Man Power for Operation and Maintenance of Aathoor Dam Head works on Daily wages basis through Contract for a period of One year
Salem District - P.N.Palayam Block - Strengthening the Road from Pappanaickenpatti to PWD channel Road (Dam Road) - Pappanaickenpatty Panchayat in NABARD -RIDF-XXX -2024-2025 Package No.08
Construction of a check dam across Kothavady stream at SF No 31 1A in Vadakkipalayam village near temple trust land in Pollachi taluk in Coimbatore district
Construction of New Hostel Building at RIRD in Krishnagiri Dam at Krishnagiri Block In Krishnagiri DT Under RIRD 2025-2026 Package No TN 04 KRI 266
STATE DISEASTER RESPONSE FUND 2026-27 CONSTRUCTION OF NEW OPEN WELL NEAR AATHOOR DAM SOUTH SIDE OF RIVER BED FOR CHINNALAPATTI TOWN PANCHAYAT WATER SUPPY SCHEME.
Nagercoil Corporatin 6 months Maintenance of Mukkadal Dam to Krishnankovil Filter house Gravity line including Rectification of repair leak work in 400mm,600mm,800mm PSC pipe
Krishnagiri dt Shoolagiri Block Strenthening of Road From Shoolagiri- Berigai road to sadhepuram road (Via) Vempalli upto shoolagiri Dam KM 780 1350 Ho Shoolagiri SGI-45
Vellore District Upgradation of the Road from Kavai medu to Poongulam Mordhana Dam in Erthangal Panchayat in Gudiyatham Block General Fund 2025-26 Package No 82
Palamedu Town Panchayat , Re tender Replacement of providing pumping main Sathiyar OpenWell to sathiyar Dam Head work Replacement Pumping Main First reach In Palamedu Town Panchayat
Krishnagiri DT Mines and Minerals 19-20 Construction of Cement Concrete Check DAM in Sinthalandoddi channel at Saraldoddi in B.S. Thimmasandhiram Panchayat Shoolargiri Block Package no_22
Rehabilitation and improvements to the flood affected area, inside of sholayar dam PH I bypass tunnel exit point at Manamboli of Valparai taluk of coimbatore district
Providing Compost Pit at nearby Dam Road in Thirikudapuram Village and Panchayat in Kadayanallur Panchayat Union, Tenkasi District under SBM(G) and 16th CFC - 2026-27
Removal of hyacinth, floating materials, debris and other obstructions from Upstream side of Nandambakkam Check Dam to downstream side of Airport runway bridge in Chennai District
Flood Management by Engaging Technical Persons and Labourers to keep watch round the clock during monsoon period from June 2026 to January 2027 at Periyar Dam.
Maintaining the 13 Nos. Surplus gates and Regulator shutter arrangements including lubrication and flood management during monsoon period at Periyar dam for the year 2026-27.
FABRICATION AND FIXING OF 1 NO. NEW BOTTOM WHEEL BOGIE IN RF SIDE OF BARRAGE GATE NO.13 INCLUDING REPLACEMENT OF END GIRDER PORTION AND FABRICATION OF NEW ROLLER ASSEMBLY AT BKB POWER HOUSE I/SAMAYASANGILI IN ERODE GENERATION CIRCLE.
Re Construction of Chitteri Weir and Providing CC Pavement in School Street and Construction of Anganwadi Building and Construction of Girls Toilet in PUMS and Providing Fencing and green net work for moringa Horticultural nursery at Nachanandal