Loading…
Loading…
6,231 results • Best match
MTPS II MechanicalII Circle Providing one Number Diesel Driven TATA Sumo Tavera Xylo Bolero on hire basis for official use of Executive Engineer Mechanical Coal Handling Plant II Division MTPS II for the period of 365 days from the date of commencem
MTPS II CHP II Preventive Maintenance Works Complete Replacement of worn out and damaged conveyor belt in Reversible Belt Feeder 8 including diamond grooved rubbe relagging of head and tail pulley in Junction Tower 5
MTPS I O E Division Supply of one number Diesel driven Tata Sumo or Equivalent having seating capacity 8 plus 1 including driver on hire basis for the official use of EE Generation MTPS I for the period of One year from the date of etc
MTPSI ES Circle EMI Division RWPH Complete overhaul of 320KW 6.6KV Vertical mounted HT Motor 3 and 4 Sl.No 3840604 3 3840604 4 in Raw water pump House MTPSI
MTPS I Provision of 1 No diesel driven TATA Indica TATA Indigo or Equivalent car on hire basis for the official use of Superintending Engineer Operation MTPS I for the period of one year from the date of commencement of work
Hiring Vehicle for EE MM SI MTPS2
MTPSI ES Circle EM II Division SD I Rewiring of the Existing aged, worn out wiring and failed per damaged 230 volts single phase plug point boxes at Boiler platforms 0 Mtr to 54 Mtr Areas of Unit I
MTPS II CHP II Replacement of Oil Seal in B3 400 Gear box Ratio 20 9 1of Make Ms Premium Energy Transmission in Conveyor 7 2 at DH 1
Providing one number petrol diesel driven Ambassador, Tata Indica on hire basis for the official use of the Superintending Engineer Civil Mettur Thermal Power Station for the period of 366 days from the date of commencement of work.
Hiring vehicle for SE P A MTPS II
supply of Plug and stem assembly- 2 sets
Operation of pumps for filling water in water tanks, Upkeeping of silt pits and drains in the residential quarters of MTPS-II quarters and near LIC building area for a period of
Colour washing to the exterior surfaces at Rear and North side of Service Building.
works for effecting services in various schemes in Rural Sankari section in Sankari division
UpKeeping of Switchyard buildings, CPU Building, FOPH, CWPH, FWPH, Chlorination building and nearby roads for the period from 12.06.2020 to 22.10.2020 in MTPS-II Premises.
Arresting the seepage water in side con 1A at apron feeder 5 with pressure grouting and Providing Micro concrete using construction chemicals of W.T 5 tunnel house of MTPS-II
Supply of gaskets for Victaulic and Dresser coupling assembly for ZGM 133 G II model vertical coal mill 2 Items
Supply of Spares for KG KHOSALA make air compressor Model 2HA2QT 6 items as per specification
Annual overhauling work - 2024 - Painting with Bituminous black paint, after cleaning the cooled water basin floor concrete surfaces of NDCT at MTPS-II.
AOH-2023 - Dewatering, cleaning, and sludge removal in the clariflocculator, stilling chamber, parshall flume, flash mixer, clarified water storage tanks in PTP area and and Clearing the jungle growth with uprooting etc. in Pre Treatment Plant area p
Load testing of EOT crane at Cooling Water Pump House
Hired vehicle for Executive Engineer CHPI MTPS II
Supply of HRA front wall bend 2 Items
MTPS II CHP II Reconditioning of 630 mm dia drive double wheel bogie wheel assembly and nondrive single wheel bogie wheel assembly of SCR machines
Supply of Spares for KG Khosala Make Air Compressor Model 2HA2QT Tube Nest for Inter and After Cooler 2 items as per the specification
Supply of Consumables for Pennwalt Sharples Super Centrifuge Model AS 26 V as per the specification 10 items
Capital Overhauling AOH 2025- Arresting fly ash leakage from the damaged portions of concrete in between RCC shell top and roof deck sheet and around supporting angles of fly ash silo 1 and 2 and Bottom Ash Silo 1 and 2 at MTPS-II.
Supply of V Belts for Compressor House and Silo and Bottom Ash handling System in Ash Handling System 5 Items
Supply of Various sizes of soft iron sealing rings for valves 7 Items as per specification
Procurement of150 Watts High Bay LED Light Fitting 225 Nos
Supply and erection of Redundant Re-heater spray system LHS and RHS
Procurement of SS diffuser(Inner) With Flame steady ring (To with stand temperature up to 1500 degC) for opposed wall firing coal burners 15 Nos
Supply of 220 KW, 3 Phase Squirrel Cage Induction Motor 1 No
Nozzle Ring with Static Ring (Split type with interlock) for ZGM 133 G II vertical Roller Coal Mill 1 Set
Supply of Various sizes of Dome Valve seals 6 Items
Supply and Erection of Ceramic Lined M.S Plate for ignition air pipe 20 Nos.
Supply Installation testing commissioning 2V 1285AH LA PLANTE type batteries in Transparent SAN container 330 cells under buy back of old batteries
MTPS II CHP II Charges for operation of conveyors71 72Drive House 9 1 9 2 Drive House Conveyor 8A B and SCR Machines I AND II Mechanical aspects in coordination with CHP Control Room Dozer
Procurement of 1200 mm width Conveyor Belt 1 Item
Reconditioning of Primary Air Coal Bend (Type I) 10 Nos.
PROCUREMENT OF 250NB MS ERW PIPES OF 6 Mtr LENGTH FLANGED AT ONE END 90 NOS
Supply of LT Armoured Aluminium Cable and Copper Cable 3 Items
De-scoping - Balance works - Rectification of floor finish / wall finish and colour washing in 8.50m level 31.75m level air washer room for STG building
Dismantling the existing damaged RR Masonry Protection wall and constructing the same using Fly ash Bricks at Southern side of 230 KV 110 KV SS yard of K.R.Thoppur 400KV SS.
Dismantling of existing damaged water trench and Providing the RCC trench in 400 KV yard near ICT-IV at K.R.Thoppur 400KV SS.
works for effecting services in various schemes in South Kolathur section in Mettur division
Construction of lean to roof two wheeler shed at Thermal Nagar-11 (Thottilpatty Camp).
works for effecting services in various schemes in Rural and South Kolathur section in Mettur division
Upkeeping and removal of dust and dirt in Chemical house, clarified water pump house, drains in PTP area, ASPH to weigh bridge and roads in RWPH, Stores area and Time office building for a period of one year from the date of commencement of work.
Supply of Boiler Tubes