MTPSI Mill PlantComplete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in mills 1A to 1F during Annual o
MTPS I Civil Circle Improvement work - Improvements on original work for providing Concrete Platform on Southern side of wet ash weighbridge adjacent to the BT road leading to Dry silo (IInd Portion)
MTPS 1 Mill Plant Unit III Attending the break down Preventive maintenance works such as overhauling of journal and spring assemblies replacement of mechanical face seal assy mill gearbox bearings etc
MTPS I Civil Circle Up keeping of IBD drain of unit I to IV near power house building by removal of ash deposits and cleaning of debris / slush / silt / waste ash etc., collecting from dustbins and from interconnected Manholes, IBD drains etc.,
MTPS I BM Unit III and IV Boiler Pressure parts Preventive Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism oil gun cleaning soot blower operation cleaning and air washing of Boiler structures floor and allied works
MTPS 1 Mill Plant Unit II Attending the break down Preventive maintenance works such as overhauling of journal and spring assemblies replacement of mechanical face seal assy and mill gearbox bearings etc
TM Unit I to IV Attending Breakdown Maintenance work of removal of Insulation and providing reinsulation to pipe lines and valves HP Heaters Gland Steam Cooler LP Heater transportation of required material and Disposal of scraps in Turbine Area,
MTPS I Mill Plant Unit I Dismantling and assembling of fuel inlet Elbows and Hard facing of Fuel inlet Elbows long and short during Annual overhaul 2024 25
MTPS I BM Unit II AOH 2021 22 ESP AB and CD pass Renewal of worn out gas distribution screen plates with new screen plates etc
MTPSI TM Unit I Overhauling of valves in Heater Drain Pegging Steam to Deaerator Condenser air Auxiliary steam and Drain Water lines in Unit I during AOH 2021 22
MTPS I TM Unit IV Overhauling of OLCTC System Pump LHS and RHS Inspection and Cleaning of Condenser CW box steam side Hot well and OLCTC System Ball collecting Screen etc
MTPS I TM Unit III Overhauling and renewal of worn out spares and Bearings and commissioning of Heater Drip Pump 3A and 3B during AOH of 2023 24
MTPS I TM I Replacement of failed stem of released HP and IP Control valve assembly with new stems
MTPS I BM Unit III Rotating parts AOH 2023 24 Overhauling reconditioning of CERM and EERM gear boxes ID PA FD fans gate actuators and other related works etc
MTPS I TM Unit I Overhauling of Beacon Rotork Ind modact actuator with Renewal of oil seals O rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during Unit-I AOH 2024 25
MTPS I BM Unit II Rotating parts AOH 2025 26 Removal and renewal of insulation in FG ducts Air Ducts and Air Pre Heaters
MTPS I TM Unit II Overhauling of Valves in Feed Water Main Condensate and Extraction Steam lines during Annual Overhauling 2022 23
MTPS I CA CWS I Overhauling of sludge disposal pump and Cold and hot water tunnel vent valves Air Vent valves and gate valves including Painting of CT safety grills inside the fan stack area gear boxes in CT I in Unit I during AOH 2023 2024
MTPS I Civil Circle Periodical Cleaning of septic tanks located behind R 7 block in Thermal Nagar3 (R.E Quarters area), near R 34 quarters in Thermal Nagar 2 (7.56 acres area), Near Q14 Block in Thermal Nagar5 and P11 Block in Thermal Nagar-4
MTPS I TM Unit I Cleaning and Hydraulic Testing of Lub oil Coolers and Working oil coolers Dismantling cleaning and assembling of Suction Strainers of BFPs and CEPs etc
MTPS I Mill Plant Unit I Hot air ducts welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion joints in hot air ducts 1A to 1C during Boiler statutory inspection 2020 21
MTPS I CA CWS-I De watering complete cleaning and sludge removal Cleaning with bleaching powder painting the structure of clarifier II during AOH 2022 23
MTPS I TM Carrying out Bullet cleaning by specially designed Phosphor Bronze Bullet shot of LHS and RHS of condenser tubes in Unit I condenser during AOH of 2023 24
MTPS 1 Mill Plant Unit I Overhauling load testing and certifying of lifting tools and movable trolleys
MTPS I CA CWS II Complete dismantling inspection overhaul including renewal of worn out pump components and assembling in any 2 Nos CWPs of stage II
MTPS I TM Unit II Overhauling and commissioning of Heater Drip Pump 2A and 2B during AOH of 2020 21
MTPS I TM Providing of 1No Diesel driven Tata Sumo Chevrolet Tavera of 9 1 seating capacity or an equivalent Vehicle on hire basis including driver for the official use of EE TM for the period of one year from 06 10 2025 to 05 10 2026
E-tender for the supply of Stationery articles - 20 items as per Annexure furnished
MTPS I Mill Plant III Complete overhauling of gearbox Mechanic face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly etc
MTPS I TM UNIT II Complete Overhauling of HP Bypass and LP Bypass Spray Valves and Oil Supply Unit during AOH 2022 2023
MTPS I BM Lift Operation of Boiler Lifts I to IV and attending routine maintenance and Minor repair works of Boiler Lift II and its accessories for 120 days from the date of commencement of works Phase I of the year 2022 23
MTPS I Civil Circle Uprooting of heavy jungle growth and disposing the debris along east side of CWPH, fore bay, Clarifier I and II, south side of CT-I and Raw water storage tank area at MTPS I
MTPS I CA CWS II Overhauling of 1600 mm BFV including Actuator Gearbox Overhauling checking and renewal of Nitrile rubber seal Painting of Intake Screens of CWP 4A 4B 4C of Unit IV during AOH 2023 24
Mettur TPS I Mill Pant Unit IV Renewal of the worn out Mill under bowl Door frames and Doors in Mill 4A to 4F during Annual Overhaul 2022 23
MTPS BM Unit III Inspection Renewal of Guide bearing in Air pre Heater A and B sides and dismantling cleaning inspection and reassembling of air seal assembly etc and other related works during AOH 2021 22
MTPS I BM Unit II Rotating parts AOH 2021 22 Removal and renewal of insulation in FG ducts Air Ducts and Air Pre Heaters
MTPS I TM Unit II Replacing the existing defective vent condenser tube nest by a retubed spare tube nest in Unit II during Unit shutdown period
MTPS I - Civil Circle - Painting the existing steel ladders and plastering using micro concrete for columns in switch yard and providing MS black steel tube to the canteen kitchen chimney at MTPS I
MTPS I CA CWS II Unit IV Overhauling of 1600 mm BFV in CWP discharge line including Actuator Gearbox Overhauling checking and renewal of Nitrile rubber seal and painting of Intake Screens of CWPs 4A 4B and 4C during AOH 2025 26
MTPS I TM Unit II Complete overhauling and painting of Instrument Air Compressors IAC 2A 2B 2C
MTPS I TM Unit I Overhauling of Valves in Feed Water Main Condensate and Extraction Steam lines during Annual Overhauling 2021 22
Mettur TPS I Mill Plant Providing 1 No Diesel driven Tata Sumo Chevrolet Tavera or an equivalent Vehicle on hire basis including driver for the official use of EE MP for the period of one year from 01 09 2020 to 31 08 2021
MTPS I Mill Plant Unit I Dismantling assembling of Mill outlet elbows and it accessories in mill 1A to 1C during Boiler statutory inspection 2020 21
MTPS I CA RWS Overhauling of 20 Ton EOT crane and 10 Ton Electrical Gantry crane and Load testing of cranes in RAW water pump House
MTPS I Mill Plant Unit IV Hard facing of Fuel inlet elbows Long and short during AOH 2023 24
MTPS I CA CWS I Painting of Hot water basin sun shield roof doors and Cleaning the algae and other foreign materials on CT ID Fan blades safety grills inside the fan stack area gear boxes GB foundation of 11 meter height in Cooing Tower II
MTPS I TM II Unit I Complete inspection and reconditioning of axial Piston pump of HP LP Bypass system oil supply unit
MTPS I Mill Plant Unit IV Strengthening Rectification of raw coal bunkers 4B 4D 4F leak arresting work by patch welding and Providing stiffeners during AOH 2023 24
MTPS I TM Unit III Replacing the existing defective vent condenser tube nest by spare tube nest in Unit III during AOH 2024 25
MTPS I Civil Circle Annual Over haul 2023-24 Cleaning of columns, Beams, drift eliminators, louvers and stacks in cooling tower cells including removal of silt/slush in cold water basin in Cooling tower IV