MTPS I BM Unit I Boiler pressure parts AOH 2024 Rectification Replacement of defective Boiler tubes in 9th header and Economizer Coils at Boiler IInd pass area and Radiography testing of welded joints
MTPS 1 Mill Plant Unit I Attending the break down Preventive maintenance works such as overhauling of journal and spring assemblies replacement of mechanical face seal assy and mill gearbox bearings etc
MTPS I BM Unit III AOH 2022 23 Complete overhaul of APH B Side and other related works
MTPS I BM Unit II AOH 2020 Flue gas duct B side Patch up works and other repair works between FG duct 45 degree slope end to ESP inlet including cost of materials
MTPS I BM Unit IV Boiler pressure parts AOH 2023 Rectification Replacement of defective Boiler tubes in 9th header and Economizer Coils at Boiler IInd pass area and Radiography testing of welded joints
MTPS I Civil Circle Up keeping of the residential quarters in Thermal nagar 11 by periodical cleaning of roads around residential buildings and disposing the debris for the period of one year from the date of commencement
MTPS I Civil Circle Up keeping of Drains by removal of ash deposits, silt and other waste materials from the drain adjacent to the power house building on the southern side and along the 58S road leading from Unit IV to canteen and from inside
MTPS I BM AOH 2024 Unit I Boiler Rectification Replacement of Defective tubes in LTSH Coils and Economizer hanger tubes at boiler IInd pass area
MTPS I BM AOH 2021 Unit II Boiler pressure parts Rectification and replacement of overheated HRH coil header stub bends and other circuit bends at penthouse area and allied works
MTPS I BM Unit II Boiler pressure parts AOH 2022 Rectification replacement of defective boiler tubes in Economizer Coils right side at Boiler II nd pass area and Radiography testing of welded joints
MTPS I BM Pressure parts Units I and II Boiler Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism cleaning air washing of Boiler structures and floor and allied works for the period of 120 days from the date of commen
MTPS BM Unit I Boiler AOH 2021 Rectification Replacement of Defective tubes in water wall area S panel area Water wall reducer tubes inter pass area steam cooled wall tubes
MTPS I BM Unit I Boiler Pressure parts Reconditioning and Hard facing of used and Wornout square coal nozzle tips and checking of deformation and matching with nozzle
MTPSI Mill Plant Unit I Overhauling of tramp iron chute knife edge gate Valves Strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills Renewal of the worn out Mill
MTPS I Mill Plant Unit I Removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level Welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion
MTPS 1 Mill Plant Unit I Attending the Break down Preventive maintenance works such as overhauling of journal assemblies spring compression assemblies mechanical face seal assembly etc
MTPS I TM Rebabbitting and Machining of worn out TG Bearings No 1 to 7 of various diameters of 210 MW LMW Design Turbine
MTPS I Civil Circle - Up keeping of the Residential quarters of MTPS I in Thermal Nagar 1 to 10 by periodical Cleaning of Man Holes, Inspection Chambers and up keeping of in the residential quarters area in Thermal Nagar 4 and 5 by providing water
MTPS I TM I Breakdown Maintenance work in Main Turbine its Auxiliaries in Unit I to IV for a period of One year during 2024 25 as and when required basis
MTPS I TM Unit I to IV Attending Preventive Breakdown Maintenance work of removal of Insulation and providing re insulation to pipe lines and valves HP Heaters Gland Steam Cooler etc
MTPS I BM Unit II Boiler pressure parts AOH 2021 Disposal of Ash from Eco hoper deflection slope rear arch room and boiler roof area, and strengthening of Eco hopper supports with new pipes and allied works
MTPS I Mechanical I Circle BM Units I and II Overhauling of movable trolleys and Electrical hoist load testing and certification of chain blocks located above Primary Air Fan Forced Draft Fan Induced Draft Fan and ESP area
MTPS I BM Unit I Rotating parts AOH 2024 25 Overhauling reconditioning of CERM and EERM gear boxes ID PA FD fans gate actuators and other related works etc
MTPS I TM I Dismantling Inspection and Overhauling of Pennwalt Centrifuges 4A and 4B in Unit IV during 2021 22
MTPS I CA Fire Protection Checking of Deluge valves Cleaning of spray nozzles in Emulsifyre system of GTs UATs MOTs COTs and DOTs of Unit I to IV and ST I and II during Unit Annual Overhauling period of 2020 21
MTPS I Mill Plant Unit II Hard facing of Fuel inlet Elbows long and short during AOH 2021 22
MTPS I BM Providing 1 No Diesel driven van having seating capacity 8 and above including driver on hire basis for the official use of EE BM MTPS-I for the period of one year from the date of utilization of vehicle
MTPS I Mill Plant Unit II Renewal of damaged Coal pipe bends ceralin bends and Patch welding the eroded portions of Coal bends and pipe lines between Mill Outlet Elbow and Fuel Inlet Elbow during AOH 2020 21
MTPS I BM AOH 2021 22 Unit IV Flue Gas duct B side Patch up works and other repair works between APH out let to ESP inlet
MTPS I BM Unit III Boiler pressure parts AOH 2021 Water Washing of complete boiler Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and Reheater coil Overhauling of water wall soot blowers and LRSB and allied works
MTPS I M I Circle CA Fire Protection Checking of Deluge valves cleaning of spray nozzles in Emulsifyre System of GTs UATs MOTs COTs DOTs of Unit I to IV etc
MTPS I TM Providing of 1No Diesel driven Tata Sumo Chevrolet Tavera of 9 plus 1 seating capacity or an equivalent Vehicle on hire basis including driver for the official use of EE TM for the period of one year from 01.08.2020 to 31.07.2021
MTPS I BM Unit II Boiler Pressure Parts AOH 2020 Disposal of Ash from Eco hopper deflection slope rear arch room and allied works
MTPS I - Civil Circle - Removal of top soil vegetation along the inside of 169 West side compound wall at CHP area of MTPS I
MTPS I BM Unit II Boiler Pressure Parts AOH 2020 Removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes etc
MTPS I BM Unit I Rotating parts AOH 2021 22 Overhauling reconditioning of CERM and EERM gear boxes ID PA FD fans gate actuators etc
MTPS I BM Unit IV Boiler Pressure parts AOH 2020 21 Servicing of various size actuators and allied works
MTPS I TM Unit IV Renewal of Gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of LPH 4 GC 1 Ejector 4A etc
MTPS I TM Unit I to IV Replacement of 2Nos existing Service hour Completed emergency replacement of Boiler Feed Pump Cartridge by a Reconditioned Cartridge and commissioning
MTPS I TM Unit II Inspection and Complete Overhauling of Voith Hydraulic Coupling of Boiler Feed Pump 2A during AOH 2020 21
MTPS I TM Unit I to IV Dismantling Cleaning and assembling of Main oil Tank filters and Centrifuges bowl assembly during 2023 24 for a period of One year
MTPS I Boiler Rotating parts Units I and II Preventive and Breakdown maintenance Works and other allied works as and when required basis for the period of 120 days from the date of commencement of work
MTPS I BM Boiler Statutory Inspection 2022 23 Unit I APH A Checking of rotor level sector plate level and axial seal plate alignment Water washing of cold end baskets and other related works
MTPS I BM Unit III Boiler pressure parts AOH 2023 Disposal of Ash from Eco hopper deflection slope rear arch room boiler roof area and strengthening of Eco hopper supports with new pipes and allied works
MTPS I Civil Circle Capital Over haul 2023-24 Providing one coat of Bituminous acid alkaline heat resistant Black paint to the Concrete Columns beams, side walls of the Cold water basin of Cooling Tower Unit II
Mettur TPS I Mill Plant Unit IV Reconditioning of released SS elliptical feeder discharge chute from mill 1A and 1B
MTPS I - Civil Circle Providing two coats of exterior emulsion paint colour washing and plain replacing existing damaged glasses with new one to the west side in power house building at MTPS I
MTPS I CA CWS I Complete Overhauling of 30Ton capacity EOT crane including load testing 1 No in Cooling water Pump House
MTPS I TM Unit I to IV Dismantling Cleaning and assembling of Main oil Tank filters and Centrifuges bowl assembly for the period of 120 days from the commencement of the work
MTPS I BM Unit IV Boiler Pressure Parts AOH 2020 21 Cleaning of boiler structures from 0 to 52 m Level etc