MTPS I TM I Re tubing of 2Nos Old and Worn out Seal Oil Cooler Tube Nest during 2020 2021
MTPS I Mill Plant Unit II Hard facing of Fuel inlet Elbows long and short during Annual overhaul 2023 24
MTPSI BM Unit I Annual Overhauling 2020 21 Overhaul of ESP CD pass Internals and related works
MTPS I Civil Circle - Cleaning of ash deposits in the Inter connected man holes of unit I to IV floor and around ESP areas of MTPS for the period from 16.06.2022 to 30.09.2022
MTPS I BM Unit II Boiler pressure parts AOH 2021 Erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
MTPS I Mill Plant IV Complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in Mills 4A to 4F during AOH 2024
MTPS I BM Unit I and II Boiler Pressure parts AOH COH 2024 Reconditioning and Hard facing of used Worn out square coal nozzle tips including SS309 plates and checking of deformation and matching with nozzle
MTPS BM Unit III Boiler pressure parts AOH 2021 Rectification Replacement of Defective tubes in water wall area S panel area Water wall reducer tubes inter pass area steam cooled wall tubes and fin welding at I st and II nd pass area
MTPS I BM AOH 2024 25 Unit III Complete overhaul of APH A and B Sides and other related works
MTPS I BM AOH 2022 2023 Unit II Complete overhaul of APH B Side and other related works
MTPS I BM Unit III Boiler pressure parts AOH 2021 Rectification Replacement of defective Boiler tubes in 9th header and Economizer Coils at Boiler II pass area
MTPS I BM Unit IV Boiler pressure parts AOH 2022 Rectification replacement of defective boiler tubes in Economizer Coils right side at Boiler IInd pass area and Radiography testing of welded joints
MTPS 1 Mill Plant Unit II Attending the break down Preventive maintenance works such as overhauling of journal and spring assemblies replacement of mechanical face seal assy mill gearbox bearings worn out roller and bull ring segment
MTPS 1 Mill Plant Unit IV Attending the Break down Preventive maintenance works such as overhauling of journal assemblies spring compression assemblies mechanical face seal assembly etc
MTPS I BM Unit II Boiler pressure parts AOH 2023 Rectification Replacement of defective Boiler tubes in 9th header Economizer Coils at Boiler IInd pass area and Radiography testing o f welded joints
MTPS I BM Unit IV Boiler pressure parts AOH 2022 Rectification Replacement of defective tubes in water wall area S panel area Water wall reducer tubes etc
MTPS I Civil Circle - Up keeping of D.M.Plant, Fuel Oil Pump House, Transport Office, Workshop, Ash Slurry Pump House Stage I and II, ESP I to IV Control room, MCC I SWGR etc., by cleaning of toilets for the period of one year
MTPS I BM Unit II Boiler AOH 2020 Rectification Replacement of Defective tubes in water wall area S panel area Water wall reducer tubes inter pass area steam cooled wall tubes and fin welding at Ist and IInd pass area
MTPS I - Civil Circle - Up keeping and operation of sewage water treatment plant equipments and up keeping of gardens in front of service building and center median of Double Road and Lawn in Front of MTPS I gate for the period of one year
MTPS I Mill Plant Unit IV Dismantling hard facing and assembling of 1 meter length coal pipes after MOE Mill Outlet Elbow in Coal Mill 4A to 4F during Capital Overhaul 2025 26
Civil Circle - Up keeping of gardens located in front on either side of 230K.V Switchyard control room, DG house and Hydrogen cylinder storage room buildings, South west corner of 58S road, North west side slope of 230K.V Switchyard and dispensary
MTPS 1 Mill Plant Unit IV Attending the break down Preventive maintenance works such as overhauling of journal and spring assemblies replacement of mechanical face seal assy and mill gearbox bearings worn out roller and bull ring segment
MTPS I BM Unit III Boiler Statutory Inspection 2020 21 Flue Gas duct B side Patch up works and other repair works between APH outlet to ESP inlet
MTPS I Mill Plant Unit III Dismantling patch welding and assembling of Mill outlet elbows Mill discharge valve bodies orifices Transition pieces fabrication of spool piece Multiple port outlets etc in Mills 3A to 3F during AOH 2021 22
MTPS I Boiler Rotating parts Units III and IV Preventive and Breakdown maintenance Works and other allied works as and when required basis for the period of 120 days from the date of commencement of work
MTPS I TM UNIT III Overhauling of Screw Air Compressor 3A and 3B of make Ingersoll Rand Model No R131 i x 7 5 AC
MTPS I Mill Plant Unit IV Renewal of eroded worn out Expansion joints in hot air duct 4B and 4C during AOH 2020 21
MTPS I BM Pressure parts Units I and II Boiler Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism cleaning and air washing of Boiler structures and floor and allied works for the period of 120 days from the date
MTPS I BM Unit I to IV Boiler Pressure Parts Safety Valve floating during AOH COH 2024
MTPS I Mill Plant Unit I Clearing the Mill rejects from Unit I Mill Feeder area weighing in departmental weigh bridge and transporting to rejects yard G etc
MTPS I BM Unit I Rotating parts AOH 2020 21 Removal and renewal of insulation in FG ducts Air Ducts and Air Pre Heaters
MTPS I TM Unit III Overhauling of TLOCBPs H2CBPs Hydrazine Dozing Pumps and Phosphate Dozing Pumps during Annual Overhaul of 2021 22
MTPS I Mill Plant Unit IV Overhaul of hot air dampers cold air Dampers cold air gates hot air gate power cylinder renewal of hot Air gate seals during Annual overhaul 2023 24
MTPS I CA CWS I Cooling Tower I Overhauling of Flow Control Valves and including reconditioning of worn out spares during AOH 2024 2025 of Unit I
MTPS 1 Mill Plant Unit II Overhauling load testing and certifying of lifting tools and movable trolleys
MTPS I - Civil Circle Clearing heavy jungles in between Anthiyur feeder to Salem 400KV-I and Salem 400KV II feeder on the rear side of switch yard of MTPS I
MTPS 1BM Unit IV AOH 2025 26 Application of hard setting sealing compound of Eromat 1003 on the erosion prone area of the Air Pre heater hoppers including the cost of materials
MTPS I TM I Dismantling Inspection and Overhauling of Pennwalt Centrifuges 3A and 3B in Unit III during 2021 22
MTPS I BM Unit IV Boiler pressure parts AOH 2022 Erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
MTPS I BM Lift Operation of Boiler Lifts I to IV and attending routine maintenance and Minor repair works of Boiler Lift II and its accessories for 120 days from the date of commencement of works
MTPS I M I Circle CA FP Replacement of wornout punctured Headers pipelines in Hydrant Emulsifyre system Service water and Auxiliary Cooling water system etc
MTPS I - Civil Circle - Cleaning removal collecting loading, transporting and disposal of debris / slush / silt and waste materials etc., in all around Cooling Tower Unit I to IV area, CWPH, Chlorination building, lime shaftner house
MTPS I Civil Circle - Repair works to the Feeder floor operator room Stage I, Stage II and Mill Plant operator room roof water leak arresting works and other allied civil works etc., at MTPS I
MTPS I MP UNIT IV Overhauling of gravimetric feeders and Clean out conveyor and cleaning clearing the coal dust and ash deposited from bunker platforms feeder floor feeder discharge platforms coal pipes mill floor and mill gearbox of mill 4A to 4F
MTPS I Mill Plant Unit II Complete dismantling of Mill internals reconditioning renewal of worn out parts renewal of worn out vertical shaft and renewal of worm gear hub Mill bottom etc in Mill 2A of Unit II
MTPS I CA CWS II Overhauling of Traction drive and flocculator drive assembly and replacement of damaged traction wheel in clarifier III and IV
MTPS I Mill Plant Unit IV Overhauling of tramp iron chute knife Edge gate valves in Mill 4A to 4F during AOH 2022 23
MTPS I BM Unit II Boiler pressure parts COH 2024 Water Washing of Boiler Ist and IInd pass area Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and allied works
MTPS I TM Unit I Annual Overhauling and gasket renewing of Valves in Feed Water Main Condensate and Extraction Steam lines in unit I during Annual Overhauling 2024 25
MTPS I BM Unit III AOH 2023 24 Flue Gas duct A B sides Patch up works and other repair works between APH out let to ESP inlet