Loading…
Loading…
6,231 results • Best match
Strengthening the rod from Vaigai dam road to Rengasamudram AD colony (Via) S.S.puram Km 0/0-2/3 in Andipatty Block
Providing Borewell with Power Pump at Ammapet Openwell near, Akkarayapalayam Openwell near and Gomuki Dam Openwell near in Vadakkanandal Town Panchayat
Can be seen in the tender documents
maintenance of dam rahabiliatation and improvement project office and allied works at 3 1/2 of months from the date of utilization
Supply, Erection and testing of Generator protection and relay panel and Transformer metering and relay panel for rectification and restoration of fire accident affected Unit 1 at Bhavani Barrage Power House 2, Umaipalayam in Erode GC
Special repairs to common toilet in Second and third floor and other works at Dam safety building in PWD Campus Chepauk Chennai 05
Maintenance of Dam Rehabilitation and Improvement Project circle office and allied works at Madurai 4 1/2 months from the date of utilization.
Strengthening of BT road at ward no.01 Mariyamman Kovil Street and ward no.15 Kadalakattupudur to Upparu dam road in Rudravathi Town Panchayat.
REHABILITATION OF A CHECKDAM
Design,Manufacture, Fabrication, Supply, Erection, Testing and Commissioning of three sets of new stop log gate (each consisting 6 parts of M.S plates and other steel structures) at BKB 1, BKB 2 and BKB 3 in Erode Generation Circle
Re-Construction of Arulmigu Meenakshi Sokkanathar and Gnanathandayuthapani Swamy Thirukoil, Mettur taluk, Salem District.
Mill Plant Maintenance - Attending minor breakdown daily and routine operation maintenance works in pulverizing system for the period of six months
Attending general cleaning and daily maintenance works in Compressor House and Monitoring Attending Patch welding works in fly bottom ash conveying lines reconditioning of wornout bends spool pieces dismantling the wornout expansion joints Bellow j
MTPS II O AHS FOPH Preventive maintenance and daily maintenance works in Fuel Oil Pump House for the period of 180 Days
supply of single phase plug point accessories - 15 items
Supply of MS Flat ISF 50 X 8 having Length of Not Less than 5.0 Mtrs - 375 MT
Construction of Pump room and supply Delivery and Fixing in position of motor pipe line From Check dam to GLR at No.10 padi at pandalur
15th Finance Untied IInd Installament- 2022-23 Construction of Storm Water Drain with RCC Culvert at 1st Ward Maruthanathi Dam Kudiyuruppu Outer in Ayyampalayam Town Panchayat
Providing Junction Improvement at km 0 6 1 2 of Ambasamudram Papanasam Upper Dam Road including CD Works at km 0 10 1 2 TNV 58
Construction of Retaining wall along the filling side of the road in front of 4F type quarters (Block No-12) leading to Emerald Dam Inspection Gallery
Construction of Retaining wall along the cutting side of the road in front of 4F type quarters (Block No.12) leading to Emerald Dam Inspection Gallery
Construction of RCC retaining wall in the slipped portion at river bed side at Chainage 350m from store junction to Kodayar Dam II at Kodayar Lower Camp
Reconstruction of Damaged Sluices
KUGC works - Reconstruction of flood damaged protection wall on the downstream right flank of Pegumbahallah dam (Kundah PH- 2) for a length of 24m (CH-5 to 29m)
Providing CC Road at Ward No.2 Senthampalayam Kulathu Street, Ward No.14 Minnavettuvampalayam 3rd Street, Ward No.5 Goundampalayam vasantham nagar, Ward No.8 Road dam street
Providing paver block at Narayana group plantation link road, Chittar Dam to Alancholai (via) Ponkinkalai road, Kumpavilagam Assembly of God church road, Kuzhathadi Vilagam road in Kadayal Town Panchayat
EXTENSION OF HDPE PIPELINE AT VADAKKANANDAL MARIYAMMAN KOIL OHT TO KK NAGAR, JOTHI NAGAR AND VIJAYAM NAGAR AND CONSTRUCTION OF COMPOUND WALL AT GOMUKHI DAM OPENWELL IN VADAKKANANDAL TOWN PANCHAYAT
Extension of Pipeline from MGR Nagar NH fly over to Nattan Kottai, Sunnalampatti, Old Bazzar St and Maintenance of Booster Room Head Works at Pampar Dam in Uthangarai Town Panchayat
Flood Damage Rectification Works Construction of PCC Retaining wall and formation of side drain along the cutting side of road leading to Drainage gallery of Emerald Dam near Emerald camp
MTPS I TM Unit III Carrying out Bullet cleaning by specially designed Phosphor Bronze Bullet shot of LHS and RHS of condenser tubes in condenser during AOH of 2026 27
MTPS I CA CWS II Unit III De watering complete cleaning and sludge removal cleaning with bleaching powder replacement of corroded/eroded walkway platform Overhauling of Traction drive flocculator drive gearbox and allied works
MTPS I Civil Circle Improvement work Laying of interlocking paver Blocks at U type quarters in Thermal Nagar 2 and 3
MTPS I - Civil Circle Up keeping of the residential quarters in Thermal Nagar- 1 to 10 by Periodical cleaning of main drains running in the residential quarters area and sweeping the roads around residential buildings, terrace floor in residential
MTPS I BM Unit III Boiler pressure parts AOH 2024 Rectification Replacement of defective tubes in LTSH Coils and Economizer hanger at boiler IInd pass area
MTPS I BM Unit II Boiler pressure parts AOH 2022 Rectification replacement of defective boiler tubes in Economizer Coils Left side at Boiler IInd pass area and Radiography testing of welded joints
MTPS I BM Unit I AOH 2023 24 Flue Gas duct A and B sides Patch up works and other repair works between APH out let to ESP inlet
MTPS I Mill Plant Unit III Removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4.5 mtr and 18 mtr level Renewal of eroded worn out Expansion Joint 3A 3B 3F Welding of eroded and worn out portion of hot air duc
MTPS I BM Unit III AOH 2022 23 Complete overhaul of APH A Side and other related works
MTPS 1 Mill Plant Unit III Attending the break down Preventive maintenance works such as overhauling of journal and spring assemblies replacement of mechanical face seal assy etc
MTPS I M I CA CWS I Replacement of existing eroded sun shield roof and its MS structures over the inner and outer rings of Clarifier II by erecting new one
MTPS I BM Unit I Boiler Statutory Inspection 2022 23 Overhaul of ESP AB and CD pass Internals and related works
MTPS I BM Unit IV Boiler Pressure parts AOH 2022 Maintenance of Burners and replacement of worn out fasteners at cover plates
MTPS I BM Unit II Boiler Pressure parts AOH 2021 Servicing of various size actuators and allied works
MTPS I Mill Plant AC Plant Unit IV Annual overhaul Air Washer System Epoxy painting of the blowers 4A and 4B discharge duct and the spray system Screen plate renewal Spray nozzles cleaning Flushing the spray system pipe line
MTPS I BM Unit III Annual overhauling 2022 23 Overhaul of ESP AB pass Internals and related works
MTPS I BM Unit II Rotating parts COH 2024 25 Removal and renewal of insulation in FG ducts Air Ducts and Air Pre Heaters
MTPS I CA CWS II Overhauling of flow control valve complete assembly renewal of its worn out components in cooling Tower III of stage II during annual overhaul 2023 24
MTPS I CA RWS Overhauling Of Jockey Pump No 2 at Fire Water pump house
MTPS I - Civil Circle Rectifying the damaged rolling shutter by electrically operated to the shed No.08 and providing color coated sheet in between the shed No.10 and 11 of central store at MTPS I
MTPS I BM Unit IV AOH 2024 25 Renewal Reconditioning of various Saw tooth expansion joints in FG ducts and Air ducts and other related works etc in both A and B sides