Loading…
Loading…
2,393 results • Best match
Palliative restoration work on LB of river Ganga for a length of 400 M from Ch 7200 M to Ch 7600 M of ds of Farakka Barrage at Vill Porapara and Meghnathmandalpara Block and PS Farakka Dist Murshidabad
MR to Guarding watching Silabati Barrage, Silabati Section Office and Ch. 234.00 C/R at Ramchandrapur from March-2025 to February-2026 of K.C. Sub-division No-V under K.C Division No- II, Khatra during F.Y.2025-26.
Emergent Repair and maintenance of Mahananda Main Canal in between 7.40 km and 11.30 km including mending of slips and rain cuts in P.S.- Phansidewa, Dist.- Darjeeling under Mahananda Barrage Division during the monsoon period of 2024-25
Supply of Unarmed Security Guards of the Premises of Sainthia Irrigation Sub-Division Office, Sainthia, Labpur Mini Barrage, Labpur and Ahamedpur Section Office, Ahamedpur for a period of one year under Mayurakshi Head Quarter Division during 2020-21
Replacement of slab seal expansion joints by new strip seal expansion joints along with repair of Durgapur Barrage road, footpath and railing in order to reduce dead load on the bridge, in PS and Block Barjora, Dist- Bankura.
Miscellaneous works related to Transformers and other allied works at Intake(Raw Water) pumping station near Durgapur barrage ,block Borjora under Bankura -I , Bankura -II and Borjora Block surface based w/s scheme(BRGF-I) under Bankura Mechanical
Supplying of Mozdoor for operation of Head Regulator and Cross Regulator gate and watching and guarding of canal bank at different chainage of different canals during Rabi Irrigation under Bhairab Banki Barrage Section under Kangsabati Canals Sub-Div
Beliatore-Sonamukhi-Patrasayar-Rasulpur Road - Urgent repair work from 1.00Kmp to 4.50Km from 16.00Kmp to 19.00Kmp, from 26.50Km to 28.00Kmp and from 41.50Km to 44.876Km due to extra traffic movement in connection with Durgapur Barrage repair work un
Emergent patch repairing of NH-2 to Durgapur Barrage road from 1.00 to 2.00 kmp and 4.80 kmp to 5.5 kmp in stretches under Durgapur Highway Sub-Division of Asansol Highway Division, P.W.(Roads) Directorate FY 23-24
Emergent Palliative Protection Work to the Right Bank of River Damodar from 550.00M to 620.00M downstream of Durgapur Barrage to protect the adjacent Park at Mouza Pratappur in P.S Block Barjora Dist. Bankura under Damodar Head Works Division.
Restoration work on right bank of river Ganga for a length of 550.00 m from Ch 14955 m to Ch 15505 m of downstream of Farakka Barrage under DMA in Ward no 17 and 16 under Dhulian Municipality
Supply of Unarmed Security Guards of the Premises of Sainthia Sub Division Office Sainthia Labpur Mini Barrage Labpur Labpur Section office Labpur and Ahamedpur Section Office Ahamedpur for a period of one year under Mayurakshi Head Qtrs Divn
Supply , delivery and fiting fixing of 400 amp and 300amp Power Contactor with other works at Intake (Raw water) pumping station near Durgapur Barrage under Barjora , Bankura I and II Block water supply scheme under Bankura Mechanical Division
Patch repairing work of NH-2 to Durgapur Barrage road from 1.00 to 2.50kmp. and 3.50kmp. to 5.00kmp. in stretches of Durgapur Highway Sub-Division under Asansol Highway Division, P.W. (Roads) Directorate, in the district of Paschim Bardwan
AMC for sweeping, cleaning petty repairing works of Main office building , Rest Shed including petty maintence of colony road along with up keepment of Suri Irigation Colony campus under Tilpara Barrage Sub Division of Mayurakshi H.Q Division durin
AMC to different quarters of Suri irrigation colony for various repairing works including wood work water supply pipeline and cleaning of campus drains in suri irrigation colony under Tilpara Barrage Sub-Division of H.Q.Division during the year 202
M/R to operation of regulator gates and structures including canal bank monitoring in connection with Kharif Irrigation-2026 for the period July26 to October26 of Brahmani Barrage (I) Section under Rampurhat (I) Sub-Division in Block- Rampurhat-
Repairing , overhauling of 375 HP V.T Pump Motor set Pump no.4, at Intake (Raw water) pumping station near Durgapur Barrage Block Borjora , Dist Bankura under Bankura I,II and Barjora Block under Bankura Mechanical Division ,PHE Dte.
Urgent flood mitigation to reduce vulnerability of structure by filling stone boulder sausage crate at downstream bay no1 and bay 2 of Midnapur Anicut due to rainfall and high discharge from 18.09.25 to 26.09.25 at Mouza Srirampur,P,S-Kotwali,
Construction of Dug Well-I at Churamonipur, Mouza- Churamonipur, J.L. No.-290, on Plot No-423 G.P- Narrah,Block- Bankura-II ,Bnakura
Execution of The Scheme Fruit Plantation with Fencing at Uaparbanda, JL No-291, Plot No-186, G.P- Narrah, Bankura-II, Bankura
Construction Massonary of Dug Well-II, at Chiraboasta, Mouza- Chirabosta, J.L. no.-304, on Plot No-285,286, G.P- Kostia,Block- Bankura-II ,Bnakura
Execution of The Scheme Social Forest (SONAJHURI-I) with Fencing at Uparbanda, JL No-291, Plot No-730/801, G.P- Narrah,Bankura-II, Bankura
Excavation of WHS-I, at Mouza-Bagnaja, J.L. no.-287, on Plot No-185 G.P- Narrah, Block- Bankura-II ,Bnakura
Construction Massonary of Dug Well-V at Mukundpur Mouza- Mukundpur, J.L. no.-306, on Plot No-681,1172/3157, G.P- Kostia,Block- Bankura-II ,Bnakura
Construction of Dug Well-I, at Uparbanda, Mouza- Uparbanda J.L. No.-291, on Plot No-479/798,730/802. G.P- Narrah, Block- Bankura-II ,Bnakura
Construction of Dug Well-II at Churamonipur, Mouza- Churamonipur, J.L. No.-290, on Plot No-285. G.P- Narrah,Block- Bankura-II ,Bnakura
Excavation of WHS-I, at Mouza-Churamonipur, J.L. no.-290, on Plot No-452 G.P- Narrah, Block- Bankura-II ,Bnakura
Excavation of WHS-I, at Mouza-Telegara, J.L. no.-286, on Plot No-194 G.P- Narrah, Block- Bankura-II ,Bnakura
Execution of The Scheme Mix Fruit Plantation-I with Fencing at Churamonipur, JL No-290, Plot No-285, G.P- Narrah, Bankura-II, Bankura.
AS PER NIT
Construction of Dug Well-I, at Uparbanda, Mouza- Uparbanda J.L. No.-291, on Plot No-260,304. G.P- Narrah, Block- Bankura-II ,Bnakura
Excavation of WHS-I at Dhunara, Mouza- Dhunara, J.L. No.-303, on Plot No-262. G.P- Narrah, Block- Bankura-II ,Bnakura
Construction Massonary of Dug Well-I at Mukundpur Mouza- Mukundpur, J.L. no.-306, on Plot No-994, G.P- Kostia,Block- Bankura-II ,Bnakura
CONSTRUCTION OF SARBANI CHECKDAM AT MOUZA SARBANI JL NO 26 BLOCK GOPIBALLAVPUR I LAT 22.18573 LONG 86.76668 OF JHARGRAM DISTRICT UNDER KCAD DIVISION UNDER JALATIRTHA PHASE VIII PROGRAMME FOR THE YEAR 2022 23
CONSTRUCTION OF TITIALI CHECKDAM AT MOUZA TITIALI JL NO 883 BLOCK BINPUR I LAT 22.51578 LONG 87.06225 OF JHARGRAM DISTRICT UNDER KCAD DIVISION UNDER JALATIRTHA PHASE VIII PROGRAMME FOR THE YEAR 2022 23
EExcavation of WHS-I, at Mouza-Kodalia, J.L. no.-312, on Plot No-2005, G.P- Kostia, Block- Bankura-II ,Bnakura
CONSTRUCTION OF SHYAMCHARANDANGA CHECKDAM AT MOUZA SHYAMCHARANDANGA JL NO 617 BLOCK BINPUR I LAT 22.6736 LONG 87.0228 OF JHARGRAM DISTRICT UNDER KCAD DIVISION UNDER JALATIRTHA PHASE VIII PROGRAMME FOR THE YEAR 2022 23
Construction of Irrigation Field Channel-II, at Dhunara, Mouza- Dhunara, J.L. No.-303, on Plot No-338,340. G.P- Narrah, Block- Bankura-II ,Bnakura
Excavation of WHS-I, at Mouza-Uparbanda, J.L. no.-291, on Plot No-504 G.P- Narrah, Block- Bankura-II ,Bnakura
Construction Massonary of Dug Well-IV at Mukundpur Mouza- Mukundpur, J.L. no.-306, on Plot No-953, G.P- Kostia,Block- Bankura-II ,Bnakura
Construction of Irrigation Field Channel-I, at Dhunara, Mouza- Dhunara, J.L. No.-303, on Plot No-314,315. G.P- Narrah, Block- Bankura-II ,Bnakura
Execution of The Scheme (Mango Plantation-I) with Fencing at Kolaberia, JL No-313, Plot No-1511, G.P-Kostia,Bankura-II, Bankura
Construction Massonary of Dug Well-III at Mukundpur Mouza- Mukundpur, J.L. no.-306, on Plot No-962, G.P- Kostia,Block- Bankura-II ,Bnakura
Excavation of WHS-II, at Dhunara, Mouza- Dhunara, J.L. No.-303, on Plot No-231,232. G.P- Narrah, Block- Bankura-II ,Bnakura
Execution of The Scheme Social Forest (SONAJHURI-I) with Fencing at Kalaberia, JL No-331, Plot No-1921, G.P- Kostia,Bankura-II, Bankura
Execution of The Scheme Mix Fruit Plantation-II with Fencing at Uaparbanda, JL No-291, Plot No-479, G.P- Narrah, Bankura-II, Bankura
Execution of The Scheme Mix Fruit Plantation-III with Fencing at Uaparbanda, JL No-291, Plot No-479,491, G.P- Narrah, Bankura-II, Bankura
Excavation of WHS-I, at Mouza-Chirabosta, J.L. no.-304, on Plot No-144 G.P- Kostia, Block- Bankura-II ,Bnakura
Execution of The Scheme Mix Fruit Plantation-II with Fencing at Uaparbanda, JL No-291, Plot No-730, G.P- Narrah, Bankura-II, Bankura