Loading…
Loading…
2,393 results • Best match
Construction of Irrigation Field Channel-I, at Bagneja, Mouza- Bagneja, J.L. No.-287, on Plot No-51,52,63. G.P- Narrah, Block- Bankura-II ,Bnakura .under Narrah-Bikna Micro Watershed Committee PMKSY-2.0-BNK-02/2021-2022)
Excavation of WHS-I, at Mouza-Uparbanda, J.L. no.-261, on Plot No-547. G.P-Narrah, Block- Bankura-II ,Bnakura .under Narrah-Bikna Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
Excavation of WHS-I, at Mouza-Sirsara, J.L. no.-284, on Plot No-128, G.P- Kostia, Block- Bankura-II ,Bnakura .under Kostia Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
Excavation of WHS-I, at Mouza-Uparbanda, J.L. no.-261, on Plot No-481. G.P-Narrah, Block- Bankura-II ,Bnakura .under Narrah-Bikna Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
Excavation of WHS-III, at Mouza-Chhirabosta, J.L. no.-304, on Plot No-368. G.P- Kostia, Block- Bankura-II ,Bnakura .under Kostia Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
Excavation of WHS-II, at Mouza-Chhirabosta, J.L. no.-304, on Plot No-112. G.P- Kostia, Block- Bankura-II ,Bnakura .under Kostia Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
Construction of Irrigation Field Channel-I, at Kostia, Mouza- Kostia, J.L. No.-308, on Plot No-1153,1133,1113. G.P- Kostia, Block- Bankura-II ,Bnakura .under Kostia Micro Watershed Committee PMKSY-2.0-BNK-02/2021-2022)
Construction Massonary of Dug Well-I at Chiraboasta, Mouza- Chirabosta, J.L. no.-304, on Plot No-1228, G.P- Kostia,Block- Bankura-II ,Bnakura .under Kostia Micro Watershed Committee PMKSY-2.0-BNK-02/2021-2022) NRM-2024-25
Excavation of WHS-II, at Mouza-Sirsara, J.L. no.-284, on Plot No-16,17,18,142. G.P- Kostia, Block- Bankura-II ,Bnakura .under Kostia Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
Excavation of WHS-I, at Mouza-Chhirabosta, J.L. no.-304, on Plot No-04. G.P- Kostia, Block- Bankura-II ,Bnakura .under Kostia Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
Construction of Irrigation Field Channel-II, at Bagneja, Mouza- Bagneja, J.L. No.-287, on Plot No-117,118,338. G.P- Narrah, Block- Bankura-II ,Bnakura .under Narrah-Bikna Micro Watershed Committee PMKSY-2.0-BNK-02/2021-2022)
Excavation of WHS-I, at Mouza-Mukundapur, J.L. no.-306, on Plot No-1096,1099,1120. G.P- Kostia, Block- Bankura-II ,Bnakura .under Kostia Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
Construction of Irrigation Field Channel-II, at Kolaberia, Mouza- Kolaberia, J.L. No.-313, on Plot No-1511. G.P- Kostia, Block- Bankura-II ,Bnakura .under Kostia Micro Watershed Committee PMKSY-2.0-BNK-02/2021-2022)
Excavation of WHS-II, at Mouza-Mukundapur, J.L. no.-306, on Plot No-1039. G.P- Kostia, Block- Bankura-II ,Bnakura .under Kostia Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
Excavation of WHS-I, at Mouza-Bagneja, J.L. no.-287, on Plot No-282. G.P-Narrah, Block- Bankura-II ,Bnakura .under Narrah-Bikna Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
Excavation of WHS-I, at Mouza-Maithagopinathpur, J.L. no.-315, on Plot No-445,446. G.P- Kostia, Block- Bankura-II ,Bnakura .under Kostia Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
Excavation of WHS-II, at Mouza-Bagneja, J.L. no.-287, on Plot No-28. G.P-Narrah, Block- Bankura-II ,Bnakura .under Narrah-Bikna Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
As per Tender document
As per bid document
Protection work along left bank of river Ganga at Parlalpur from 13.320 KM to 13.495 KM DS of Farakka Barrage for a length of 175 Mtr. in G.P Pardeonapur Sovapur, Block-Kaliachak III, P.S Baishnabnagar, Dist. Malda.
Maintenance of wearing course of deck slab from Ch 450 m to 92175 cm as and when required under Teesta Barrage Division in Block Mal Rajganj P S Mal NJP Dist Jalpaiguri for the year 2023 24
Protection work along left bank of river Ganga from Manikchak Ferry Ghat towards upstream (Ch.-29.500 km to Ch.30.600 km upstream of Farakka Barrage) (length 1150 M) at Narayanpur within Block and P.S.-Manikchak, Dist.-Malda
Providing Still photography Videography services at different stages during progress of work making documentaries for Gajoldoba Barrage to Kranti Odlabari Connector at Baganbari More from 0.00 Kmp to 6.850 Km except from 4.200 Km to 4.650 k
Maintenance of wearing course of deck slab from ch 0 m to Ch 450 m as and when required under Teesta Barrage Division in Block Mal Rajganj PS Mal NJP Dist Jalpaiguri for the year 2023 24
Preboro irrigation maintenance work by Oiling greasing replacing of damaged parts bearings nutbolts etc of 50 nos regulator gates at different locations of DNMC including Duak Barrage its head regulator gates under TBP at Block Chopra islampur
Supply, delivery and fitting of 440Volt, 3phase, 1440 RPM ,550 watt heavy duty Tubular Man cooler fan with allied works at Intake (Raw water) pumping station near Durgapur Barrage Block Borjora, Dist Bankura under BMD PHE Dte.
Operation, and Guarding of pumping machineries and Sub-Station Equipments at Intake (Raw water) pumping station near Durgapur Barrage Block Borjora, Dist Bankura under Bankura I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme
Maintenance of Gate of Cross Regulators at 11.06 km 20 km 22.72 km of TJMC and HR gates during the year 2025-26 for optimal water management in Kharif Rabi Boro Irrigation area under Teesta Barrage Project.
Operation, and Guarding of pumping machineries and Sub-Station Equitments at Intake (Raw water) pumping station near Durgapur Barrage Block Barjora, Dist- Bankura under Bankura -I ,II and Barjora Block Surface Water Based Piped Water Supply Scheme
Operation of 20 KVA Departmental and 15 KVA Hiring 3 ph, 415 V, DG set at R.B.H.R. and Silabati Barrage gates during watering , illumination of site during load sheding and as when required as per direction of..
Emergent repair and maintenance of Mahananda Main Canal in between 11.60 km and 12.10 km including mending of slips, raincuts etc in P.S.- Phansidewa, Dist.- Darjeeling under Mahananda Barrage Division during the monsoon period of 2024-25
Mending of damages of Apron and Toe wall of river side and country side respectively of Left Afflux Bundh of Teesta Barrage from Ch 5400 m to Ch 7000 m in GP Oodlabari PO Manabari Dist Jalpaiguri
M/R to removal of jungle and deposited earth from canal bed in between chainage 1203.00 and chainage 1230.00 of DBMC under Brahmani Barrage Section of Rampurhat (I) Sub-Division within M.N.C.D during the year 2026-27
Preparation of flower bed by cutting, dressing and leveling the earth including necessary manures, plants and cutting of jungles at Durgapur Section No. I office near Durgapur Barrage for the period from November 2025 to February 2026
Emergent repair and maintenance of Mahananda Main Canal in between 3.00 km to 5.500 km including mending of slips, raincuts etc in P.S.- Phansidewa, Dist.- Darjeeling under Mahananda Barrage Division during the monsoon period of 2024-25
Bank protection work along right bank of river Ganga for a length of 1000.00 M from Ch 18400M to Ch 19400M of ds of Farakka Barrage at Vill Sikdarpur and Loharpur Block and PS Samserganj Dist Murshidabad
Operation and maintenance of regulator s gates for Kharif Irrigation for the year of 2026-27 of the Sali Barrage gates head Regulator gates of L.B.M.C. and R.B.M.C. of Sali Diversion Section under Damodar Headworks Sub-Division .
Karala Bridge at Ch. 4.49 km on Paramunda More to Gajoldoba Barrage Road Repair of Expansion Joint Beam AND other minor repair work under Jalpaiguri Highway Division in the district of Jalpaiguri during the year 2026-2027
Repair maintenance painting of Sluice gates Draw shutter flap shutter on the bank of River Dima and Kaljani at Alipurduar Town Protection emabankment Dist Alipurduar under the jurisdiction of Teesta Barrage Electrical Division for FY 2026 27
Supplying Unarmed Security Guards (Unskilled) of the premises of Md Bazar Irrigation Sub-Division (4nos), Md Bazar and Deucha Barrage (3Nos) ,Deucha for a period of one year under Md Bazar Irrigation Sub-Division during 2026-27.
Construction of C.C. road from Fadilpur dam to Mathpara at Sanmatinagar village under Sanmatinagar G.P in Raghunathganj-II Block, Murshidabad. .(Pathashree-III-2023-24)
MR to left bank main canal Nityanandapur Dam from Ch. 0.00 to Ch.265.00 under P.S and Block Gangajalghati, Dist.Bankura of Asansol Irrigation Division
Blockage cleaning of submerged 400 mm dia. Raw water pipe line inside Maithan Dam of Kalyaneswari Water Works under RCFA -1 Water Supply Scheme.
CONSTRUCTION OF DRAIN FROM THE HOUSE OF PULAK DAM TO HOUSE OF BHUMIDHAN SARKAR AT WARD NO- 02 , PART NO-284 UNDER DINHATA MUNICIPALITY
MR to Dam LBMC and RBMC to maintain spontaneous flow of water through the canals in CW Turga irrigation scheme under Purulia Irrigation Division
Construction of Concrete road from Bholakar Dam to Panchoboti Asram Under Gukulpur G.P within Patashpur-I in the District of Purba Medinipur.(SSM-158)
Construction of Concrete Covered Drain from Rabindra Nath Dam House to PWD Road at Rautara G.P. under Habra-I Block ( Total length - 80.00 M. )
Cutting and clearing jungles of Maliarajore Dam embankment in connection with Kharif Irrigation 2025 under P.S. Block Gangajalghati, Dist. Bankura of Asansol Irrigation Division
Construction of concrete pavement at Dam Pukur Math area within Booth No- 192 in ward no-15 under APAS scheme within Uttarpara Kotrung Municipality
Blockage cleaning of submerged 400 mm dia. Raw water pipe line inside Maithan Dam of Kalyaneswari Water Works under RCFA -1 Water Supply Scheme.