Loading…
Loading…
7,167 results • Best match
Concrete Pavement Road Work includes demolishing cement concrete stone rubble masonry earth work excavation filling with quarry muck PCC steel reinforcement RCC cement plaster centering and shuttering
Sub Head - Reconstruction of tilted boundary wall after demolishing it and raising of existing drain at vacant land (allotted for parking) opposite to cremation ground, Tilak Vihar
Demolishing and re construction of existing storm water drain and boundary wall in the upstream of inlet at RD 2683m along the land boundary of Supplementary Drain
Sub Head Construction of New 138 seater JSC at the place of 30yrs JSC after demolishing it at Indira Camp no. 2, Keshopur, Vikas Puri. (AC-29)
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Reinforcement weep holes Plastering filling earth etc
Demolishing of existing toilet,Earth work leveling and DR retaining wall PCC RCCM25, RCC Solid block work,cement plastering, Water proofing coarse, Wood work, vitrified tile flooring
jungle clearing, demolishing brick work and old plastering, dismantling doors and windows, providing brickwork and plastering, provision for electrical, water supply and sanitary arrangements, colour washing etc
Sub Head- Reconstruction of tilted boundary wall after demolishing it and raising of existing drain at vacant land (allotted for parking) opposite to cremation ground, Tilak Vihar
CONSTRUCTION ONE OFFICE ROOM, ONE STORE ROOM AND RAISING OF BOUNDARY WALL IN CTT (AFTER DEMOLISHING) HARIJAN BASTI KAKROLA VILLAGE IN WARD NO 35-S KAKROLA NGZ
Flooring Wall tiling common roomToilets renovation Female rooms Aluminium Windows Fixing etc Provisions are included in the estimate for demolishing tile concrete Solid block masonry Plstering etc
Demolishing existing dilapidated double storied 20 seater conventional JSC and reconstruction of JSC at J-Block Murga Market, Ashok Vihar Wazirpur, AC-17 JSC Code No.17CJ0413
Demolishing of 80 old damaged Handpump platforms and Construction of 80 New Handpump platforms in various villages of Block Jobat, udaigarh and c.s.a. nagar of District-Alirajpur.
SH. Dismantling demolishing of GCI roof, Brick work, tile works, galvalume sheet roofing, water supply and sanitary installation etc. along with Mechanical and Electrification works (2nd Call)
Dismantling old plaster, Demolishing brick work, R.C.C work, Plastering work, Removing dry distemper, Finishing and painting work, Aluminium Work, venetian blind work, Disposal of Building Rubbish etc.
Patch Repair providing by CC 1 2 4, brick agg, demolishing etc at various location under the jurisdiction of ward no. 104 Janak Puri South, West Zone.
Converting works includes Demolishing works Solid Block Masonry V board paneling Painting Aluminium Work Tiling Gate supplying sanitary items ACP Work Plumbing Electrical works and Purchase items
Sale with disposal of different building materials after demolition of existing Pasteur Institute building within the compound of 2, Convent Lane, Kolkata 15
DEMOLITION OF EXISTING CHENNAI PRIMARY SCHOOL AND CHENNAI HIGH SCHOOL BUILDINGS AT MAHALAIMMAN KOIL SCHOOL STREET IN DIVISION - 04, UNIT-01, ZONE- 01
Supply of equipment, manpower, transport, disposal of malba and other related arrangement on hire to DDA for demolition programwhenever required in HCC-2.
Demolition work for two nos. vacant dilapidated building, One 4 storied Block G and one 2 storied Block H in HIT Scheme II
Repair and construction of boundary wall and store tin shed, demolition of water tank in Red Cross Compound at Bahadurgarh in Jhajjar district.
Demolition of Old Gate and Construction of New Gate with Guard Room for Municipal Office Building in Ward No 7 under Burdwan Municipality
Demolition of ACP cladding and toughen glass with construction of outer wall and aluminium windows in Income Tax Office at Bittan Market, Bhopal
Demolition of old 19 seater JSC (30 yrs.) and Construction of 42 seater new JSC at D-Block, New Seemapuri (Part-1) (63CJ1113).
Urgent demolition, repairing and restoration work of north side balconies including painting at New Law College Hostel, 14, Bidhan Sarani, Kolkata -700 006.
Providing equipments and manpower on hire charges for demolition program/removal of encroachment/removal of malba and other allied work of East Zone
Providing and supplying various types of machinery, vehicles and labour force for demolition work in CIDCO notified area and NAINA in Navi Mumbai.
Engagement of a Professional Photographer and Videographer for Comprehensive Documentation of the Demolition of Unauthorized Constructions under the Jurisdiction of Bidhannagar Municipal Corporation.
DEMOLITION AND RECONSTRUCTION OF STORM WATER DRAIN AT MGR NAGAR 1ST STREET CHAINAGE 160M TO 190M IN DIVISION-20, UNIT-05, ZONE-02
DEMOLITION AND RECONSTRUCTION OF STORM WATER DRAIN AT MGR NAGAR 1ST STREET CHAINAGE 130M TO 160M IN DIVISION-20, UNIT-05, ZONE-02
DEMOLITION AND RECONSTRUCTION OF STORM WATER DRAIN AT MGR NAGAR 1ST STREET CHAINAGE 190M TO 220M IN DIVISION-20, UNIT-05, ZONE-02
(SH Demolition of old Pump House and C/O New Pump House at LWSS Beh Kolian under JSV Section Sai) Under PDNA (9225)
(SH Demolition of old Pump House and C/O new pump house at LWSS Abharni old under JSV Section Sai) Under PDNA (9214).
Civil works
Semi permanent structural building of 254 mm thick brick wall in superstructure stiffened with brick pillar and GS sheet roofing slab
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering reinforcement filling available earth weep hole Plastering etc
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Reinforcement PVC weep hole earth filling Plastering etc
This work consists of concrete columns for foundation, solid block work for walls, RCC roof slab, electrification, plumbing, furniture ,Computer networking and demolishing of existing village office building.
SH- C/O 1.00 MLD sewerage Treatment plant based on SBR Technology and C/O Retaining wall , Demolishing of existing desiliting tank and Constructing it at another place
This work consists of concrete columns for foundation, solid block work for walls, RCC roof slab, electrification, plumbing, furniture ,Computer networking and demolishing of existing village office building.
Clearing Jungle,Demolishing CC,Earth Work Excavation,PCC 1 4 8,centring and Shuttering,PCC 1 3 6,PCC 1 2 4,Re inforcement,Plastering,PVC WEEP HOLES
Dismantling tile flooring Vitrified and ceramic tiling Demolishing CC Plastering Providing CC 1 2 4 European water closet towel rod health faucet long body tap soap dish mirror
Clearing Jungle ,Demolishing CC,Earth work Excavasion, PCC 1 4 8,Centring,PVC WEEP HOLES,PCC 1 3 6,PCC 1 2 4,Plastering,Earth Filling 5 schemes
Clearing jungle,Demolishing cc,Earth work,PCC 1 4 8,centring and shuttering,PCC 1 3 6,PCC 1 2 4,Steel re inforcement,plastering,PVC WEEP HOLES
Dismantling GI and CI pipes, tile work, demolishing cement concrete, providing cement concrete water proofing treatment, ceramic glazed wall and floor tiles, CI manhole cover, solid block masonry
Construction of Cultural centre and Self employed Entrepreneurs hall( Demolishing existing old building, Civil works, Plumbing works and Electrical works), Construction of Culvert, Retaining wall of stream, etc.
This work consists of concrete columns for foundation, solid block work for walls, RCC roof slab, electrification, plumbing, furniture ,Computer networking and demolishing of existing village office building.
demolishing rcc earthwork excavation laterite masonry plastering cement concrete supplying and fixing steel pipes frames sectioning supplying 6mm and 40 mm metal spreading 6mm and 40mm steel work
Construction Work of 11 nos Additional Class Room and other works at Ground Floor after demolishing old Class Room at Gayeshpur Netaji Vidyamandir ( H.S) , under Kalyani Block, Nadia
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering reinforcement Plastering Interlocking Tiles for approach road etc