Loading…
Loading…
7,167 results • Best match
Demolition of Vat and Plantation in front of Bridge and Roof Gate at G.T. Road Howrah under HMC ward no-16.
PROPOSED DEMOLITION OF THE EXISTING DAMAGED URBAN PRIMARY HEALTH CENTER AT KATHIVAKKAM HIGH ROAD IN DIVISION-2,UNIT-1,ZONE-1.
Demolition and Re-Construction of Storm Water Side Drain at Siva Shakthi Nagar 1st Street in Dn.006, U-02, ZONE1.
Demolition and Re-Construction of Storm Water Side Drain at Dr.Ambedgar Nagar Mettu Street in Dn 6, U 2, Z 1.
Providing and erecting various types of fencing in CIDCO area as and when required during demolition drives conducted by CCUC (NM).
Demolition and Re-Construction of Storm Water Side Drain at Dr.Ambedgar Nagar 7th Street in Dn 6, U 2, Z 1.
Gate Pass for Furniture, Gate Pass for Div Stk, Deposit Repair Register, Issue Receipt Voucher, Store in Hand Ledger, Demolition Ledger
DEMOLITION OF TEMPORARY SHOPS CONSTRUCTED AT JATIN DAS PARK FOR REHABILITATION OF KALIGHAT REFUGE HAWKERS MARKET RELATED WITH KALIGHAT SKYWALK PROJECT.
DEMOLITION AND RECONSTRUCTION OF BOUNDARY WALL IN FRONT OF SINGLE SAILOR ACCN AT INS NETAJI SUBHAS UNDER GE (I) (CGP) KOLKATA
N.R.S. Medical College and Hospital - UNB Building - Civil work for vibration free and stability maintained demolition of overhead RCC water reservoir.
Design, Installation and Commissioning of Construction and Demolition Waste Processing plant including Operation and Maintenance for a period of 10 years
Demolition of damaged R.C.C. Elevated Reservoir ( Capacity 136400 Ltr ) at HARIHARPARA Water Supply Scheme under Berhampoore Sub Division, Murshidabad Division, P.H.E.Dte
ENGAGEMENT OF BACK HOE LOADER AND PNEUMATIC HAMMER FOR THE DEMOLITION OF UNAUTHORIZED CONSTRUCTION IN THE KMC AREA AS PER REQUIREMENT.
Annual Plan-Kalliassery Block Panchayath 2025-26 Proj.No. 112/26-Demolition of uninhabitable portion of Irinavu Kozhifarm building in Kalliassery GP
Demolition of Vat and Beautification in front of Hoogly Dock Gate at Salkia School Road within HMC area Ward no-12.
Engagement of Back-Hoe-Loader and Pneumatic Hammer for the demolition of unauthorized construction in the KMC area as per requirement.
demolition of existing drain , footpath and reconstruction of the same. Widening area to be resurfaced with 100mm thk CC interlocking tiles
DEMOLITION AND RECONSTRUCTION OF BOUNDARY WALL IN FRONT OF NEW NOM BUILDING AT INS NETAJI SUBHAS UNDER GE (I) (CGP) KOLKATA
(SH. Demolition, reconstruction of RCC slab 1st Floor JSV Sub-Division Bassi and white washing/painting of the Sub-Divisional building).
REPAIR/MAINT OF 01 X CHAIN PULLEY, 01 X DEMOLITION HAMMER AND 01 X SHOE SHINE MACHINE OF AGE (I) PAC
In compound wall proposed for Kurichi Govt.ITI Building.RR masonary is proposed for foundation and retaining portion and above this RCC belt is also proposed.Wall is proposed using precast solid blocks.Finishing works plastering and painting is als
REFER TENDER DOCUMENTS
Repair and maintenance of Infrastructure Assets in R-V division During -2025-26
As per TD
attached
Demolishing R.B work, Dismantling Cement Conglomerate, Cutting reinforcement bars, Providing and fixing ceramic glazed tile and polished granite stone flooring, providing kitchen cabinet, disposal of malba
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Reinforcement filling available earth Plastering etc
Demolishing and Construction of haudies at tube well No. 2,6,3, Khhals Nali and Boundary wall at Lampur Tube well No 2 at village on distt., North
Demolishing cement concrete PCC 1 2 4 Centering shuttering Steel work for purlin Structural steel work for trusses Providing GI sheet Providing GI sheet roofing accessories
Patch Repair providing by CC 1 2 4, brick agg, demolishing etc at various location under the jurisdiction of ward no. 105 Mahavir Enclave, West Zone.
DEmolishing ,clearing grass Erath work PCC 1 4 8, 1 3 6 ,1 2 4,centring and shuttering pcc 1 1.5 3,RCC,Plastering,Earth filling
Demolishing of 70 old damaged Handpump platforms and Construction of 70 New Handpump platforms in various villages of Block Alirajpur, Sondwa and Katthiwada of District-Alirajpur
Dismantling and demolishing work,cc work,repairs to building,wood and pvc work,finishing work,water supply,sanitary installation,floorong,aluminium and structural glazing work etc.
Demolishing stone rubble masonry earthwork excavation random rubble masonry PCC RCC centering and shuttering Steel reinforcement Laterite masonry Structural steel work plastering finishing walls with emulsion
Demolishing of Existing RCC slab Culvert and P/L of new RC slab Culvert in front of HPSEBL SDO Office Chadhiar (Deposit work SDF/2025/767)
This estimate includes demolishing the existing half wall Aluminium fabrication partition floor tile damaged PVC ceiling etc. Construction of RCC plinth belt solid concrete block masonry
Clearing jungle, demolishing cc ,Earth work exczvation,PCC 1 4 8,Centring shuttering,Pcc 1 3 6,RCC ,Plastering, PVC Weep hols,Quarry muck,Earth filling
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1 15 3 Reinforcement Centering and shuttering earth filling Plastering etc
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Reinforcement, Filling available earth Plastering etc
CONSTRUCTION OF TAX COLLECTION CENTER AT 17/B PWD ROAD BY DEMOLISHING THE EXISTING OLD PUMP HOUSE WARD 03 SCHEME ID APAS/01/113/32/0003
Demolishing cc 1 3 6and cc1 4 8,Earth work excavation, cc 1 4 8,centring and shuttering,cc1 3 6,cc1 2 4, plastering, etc
Regarding the material ejected from the construction of new Adyawat Hospital, staff quarters by demolishing Ali Akbar Hospital, Wadia Hospital and five Kandil schools At Malegaon
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering reinforcement Filling available earth Plastering etc
The provisions included in the estimate include demolishing solid block in damaged areas, dismantling plastering, solid block, 12mm plastering, scrapping and painting with emulsion and enamel.
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Reinforcement Filling available earth Plastering etc
Earth work in excavation by mechanical means Demolishing brick work manually Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually
The provisions included in the estimate are clearing jungle, demolishing rubble masonry, earthwork in excavation,RCC centering and shuttering, steel reinforcement, filling earth for road formation
Dismantling steel work, Demolishing brick work, Earth work, Brick work and Interlocking chainlink fence 50x50 mm box size 3mm galvanized steel wire (as per estimated enclosed)
proposed to rise the existing side walls of the drainage upto 15 cm height. Also provisions for demolishing existing cover slab and providing new cover slab
Demolishing of road and side drain from Jain road through K.P. Chowk up to D.K. Road (near Kanhaji Gym) in Uttam Nagar Assembly Constituency AC-32.