This estimate includes 1. clearing grass 2. earthwork excavation 3. demolishing damaged lining 4. DR pitching 5. CC 1 3 6, 20mm for lining sides and bed 6. 9mm plastering.
The provisions included in this estimate are demolishing RCC and CC works, dismantling tile work, site clearing, earth work excavation for foundation, stone rubble for foundation and basement, RCC work
Proposed Plan for Construction of Division Office Building including Enternal Electric & Assesaries Fitting Work, Construction of Vehicle Shed in divisional office and Demolishing Structure Work at Old division Office Dhamtari.
Auction
Partially load bearing 254 mm thick brick wall in superstructure stiffened with brick pillar and RCC roof slab
SPECIAL REPAIR WORK-REPLACEMENT OF OLD AND UNSERVICEABLE LT PANELS ALONG WITH DEMOLITION OF HVAC, BOILER AND MANIFOLD BUILDING AT ESIC HOSPITAL SEC 15 ROHINI, DELHI
Repair and Annual maintenance of Kanjhawla BPS, JE store and demolition of abandoned OHT at Kanjhawla office complex in Mundka AC-08 under AEE(M)-08.
Improvement of area after disposal of Construction and Demolition waste, Building Rubbish, and unserviceable materials etc from the Area between old Wazirabad to Nigam Bodh Ghat.
Appointment of Independent Engineer for Collection Transportation Processing and Appointment of Independent Engineer for Collection Transportation Processing and Disposal of Construction and Demolition Waste in Mumbai
Demolition abandoned UGR Parladpur Village and repairing of boundary wall of abandoned UGR Parladpur Village ward No. 29 in AC-07 Bawana under EE (C)-10.
The estimate includes demolition of existing solid block parapet wall on expansion joints, providing a concrete beading and new aluminium sheet over the expansion joints etc
Demolition and Re-Construction of Storm Water Side Drain at Siva Shakthi Nagar 3rd Street and Dr.Jayalaitha Nagar 5th Street in Dn.006, U- 02, ZONE1.
DEMOLITION AND RECONSTRUCTION OF STORM WATER SIDE DRAIN AT DR. AMBEDKAR NAGAR 8TH STREET AND TKP NAGAR 1ST CROSS STREET DIVISION -06, UNIT-02, ZONE-01.
PURCHASE OF STORES AGAINST CERTAIN ITEMS OF CA NO CEAFU-10/18-19 PROVN/DEMOLITION/ADDN/ALTN TO DEFICIENT LIVING-IN-ACCN AT AF STATION PATHANKOT
ARCHITECTURAL AND STRUCTURAL DESIGN AND ITS DRAWINGS FOR DEMOLITION OF OVER HEAD TANK AND RECONSTRUCTION OF TANK NEAR SRE ALONGWITH ALLIED WORK SERVICES AT AFS AMBALA
Demolition of Dilapidated 96 TNGRHS (12-A type, 36 -B type, 36-C type and 12 -D type) flats at Collector Bungalow Compound in Salem District .
For Demolition and Reconstruction/ New Construction of missing Links Storm Water Drain in various locations of Zone 4,5,6,8,9,10 and 13 (43 Packages) under World Bank Fund
DEMOLITION OF DILAPIDATED AND INOPERATIVE ELEVATED SERVICE RESERVOIR AT GANGULY BAGAN, OPPOSITE 87/50, RAJA S. C. MULLICK ROAD, KOLKATA - 700047, WARD NO. 100, BOROUGH - X.
Road Widening road rising providing BM BC Irish drain Demolition culverts Construction culvert and cross drainage providing side protection LS fo purambokku Survey shifting utilities etc
Demolition of defunct pumping trolleys and Sump Wells at C-Block, Budh Nagar and Krishi Kunj in Inderpuri under EE(West)-II AC-39 Rajender Nagar.
LOADING SHIFTING AND UNLOADING OF UNSERVICEABLE IRON SCRAPS COLLECTED DURING DEMOLITION OF OLD ESR OF RANIKUTHI BPS WD 98 FOR DEPOSITION TO CONDEMN STORE OF KMC
Demolition of existing School of Nursing Building within the compound of Medical College and Hospital, Kolkata for construction of proposed G6 storied patient care service Building
Disposal of CandD wastes from demolition activities etc. on DDA land under area jurisdiction of SMD-4 /SZ/DDA at MCD approved CandD waste management plant.
Demolition and Restoration of Damaged Boundary Wall including Restoration of Footpath at RD 11730m and RD 12418m of Supplementary Drain under the jurisdiction of CD-XVI
Dismantling, Demolition and Disposal rubbish and Debris with all scrap materials including its raft foundation at Rasikpur Children Park within Ward no 2 under Burdwan Municipality
1)Demolition of existing concrete floor. 2) Excavation for footing. 3) Soling works. 4) Centering and Shuttering works. 5) PCC and RCC works. 6) Earth filling.
Demolition of ELSR beside Excel hospital at Bandha Basti in ward 192-Temple Alwal, Circle,Alwal Circle-2,Malkajgiri Zone,GHMC. (1st Recall) (Item No.2)
Engage of JCB,Hydraullic compressor machine and tractor for demolition of buildings for road widening works from chaman to dayara in Medak Municipality under 15thFCG/MGF
Supply and delivery of 100mm dia 65mm dia GI B Class pipes and Bosch Demolition hammer of GSH 11E for water supply dept of Vuyyuru Municipality.
Demolition and Reconstruction of Storm Water Side Drain at Siva Shakthi Nagar 4th Street and Jayalalitha nagar 4th street in Dn 6, U 2, Z 1.
Hiring of Consultancy Services - Percentage based - Technology Consultants, Management Consultants; Building and Construction, Business Process Engineering Reengineering, Consultancy Service for Soil Investigation for Demolition and Reconstruction ..
Construction of 400 Bedded boys Hostel at JIPMER Campus, Puducherry. Sub Head I (CIVIL): Building Portion including internal water supply lines, Sanitary Installation, drainage, demolition of existing quarters & other development works. Sub Head ... drainage, demolition fo ...
and removing dead damaged lime concrete, Demolishing R.C.C , Dismantling of wood work , relaying lime concrete flooring , applying anti termite treatments , Re-erection of dismantled wood works , re-fixing wooden boarding etc
Providing worn out the dead mud plaster/ mud, Demolishing Tallu (Twigs), support with poles and scantling, Dismantling of wooden round poles, laying of wooden round poles, lying of twigs/ talloo etc.
The work involves demolishing, dismantling the existing facilities, cutting / excavation, filling, leveling and providing walkway, seating, kerb stone, fountain etc supplying and filling garden soil landscaping and planting, developing and maintenanc
Construction of balance compound wall, Drainage construction,providing structural roofing with cement board and shingles, fixing toughened glass with frames, brick demolishing, plastering including all design work and Wall Painting work.
Dismantling and demolishing works solid block masonry RCC work for lintel plastering works Truss work for roofing and roof covering with GS corrugated sheet Floor finishing with vitrified floor tiles painting
Aluminium works for doors windows partitions Polyester powder coated aluminium shutter Particle board Providing glazing Solid block masonry Plastering Painting RCC Steel reinforcement Centering shuttering Ceramic tile work Demolishing brick laterate
Demolishing stone rubble Picking collecting metal Earth work excavation Filling quarry muck PCC 1 3 6 Centering shuttering work RCC Steel reinforcement Filling earth Spreading 40 mm metal Structural steel work
Earth work in excavation PCC Centering and shuttering RCC Structural steel work Lifting loading and proper placing of precast RCC slabs Filling available excavated earth Demolishing stone rubble masonry Plastering etc
The provisions included are dismantling and demolishing works, works of aluminium doors and windows, partition works, works of storage racks, flooring, painting, sanitary and water supply works, supplying office furniture etc.
This Estimate proposed demolishing of existing AC sheet roofing ,dismanling ceiling and Providing and laying 0.5mm thick profile iron GI sheet , repair of existing windows and renewing 4mm thick window glass .
Clearing grass Demolishing CC Earth work in excavation CC 1 4 8 Centering and shuttering CC 1 3 6 CC 1 2 4 9mm Plastering Filling with contractors own earth etc
Providing worn out the dead mud plaster/ mud, Demolishing Tallu (Twigs), support with poles and scantling, Dismantling of wooden round poles, laying of wooden round poles, lying of twigs/ talloo etc.
demolishing brick work rubble dismantling door earthwork earth filling Centering and shuttering PCC RCC Steelreinforcement brickwork plastering work MS grill UPVC door and windows and ventilator works Plumbing works flooring Painting
This work consists of inverted T beam and slab for foundation, solid block work for walls, RCC roof slab, electrification, plumbing, furniture ,Computer networking and demolishing of existing village office building.
dismantling and re roofing of the the M.P tiles, and Absetos sheet, demolishing the old tile work in toilet and veranda and reflooring,false ceiling ,Aluminium work ,Ready made septic tank
The estimate is prepared for compound wall after demolishing and to reconstruct with RCC retaining wall for a length of 85 m length and balance portion with RR masonry retaining wall