Loading…
Loading…
7,167 results • Best match
As per BoQ
As per tender documents
As per tender documents
SH C O RCC civil work in building Aluminium work demolition in wall half brickn masonery roof work in prock wood work in EE office and porch etc
Improvement development of road from Deepak house to Maruti workshop by pdg. Demolition cc,, b/agg, M/H, G.T, RMC etc. in Mahipalpur in C-50- S /NGZ.
Improvement development of road from Deepak Attri to Vijay Pal house by pdg. demolition cc, brick agg MH, G.T, RMC etc. in Mahipalpur in C-50- S/NGZ.
Construction of 60 seater JSC after demolition of JSC Code no. 52CJ0845 at JJ Basti Dora Tambu Camp near Tughlakabad Railway Station in Mohan Cooperative, Tughlakabad (AC-52)
Improvement development of road from Sukhpal house to Monu house, by pdg. demolition cc,, b/agg M/H, G.T, RMC etc. in Mahipalpur in C-50- S /NGZ.
Demolition of existing Malaria Clinic with waiting shed within the compound of STM, Medical College and Hospital, Kolkata for construction of proposed G2 storied Building for OPD area
SH- Laying, jointing testing of G.I Pipes of 65mm dia with butt welding at RD 0 to 600 repair, demolition of CC Path with CC 1 2 4
Construction of 60 seater JSC after demolition of 40 seater JSC Code no. 52CJ0869 at JJ Basti Gola Kuan Near Okhla Industrial Area Phase-I, Tehkhand (AC-52).
Demolition and C/O New Manhole Chambers at Divya Jyoti School Near SP residence and Akadash Rudra Temple and Path at Purani Mandi and Sanyardhi of Mandi Town
Improvement development of Culverts, Drains and Chowks by pdg. demolition cc, b/agg B/w, plaster, RMC, steel work etc. in Kapashera Village in C-49- S/NGZ.
Demolition and reconstruction of damaged room along with boundary wall and allied civil works for proposed store room in Scheme No. SIH-I at Christopher Road (2nd Call)
Demolition of Structure D Mart and Compound wall of Sir Elly Kaddori School affecting in the RL of reconstruction of Hancock bridge, Shivdas chapsi marg in E Ward.
Improvement development of road and Drain from Rajesh Sharma to Tula Ram by pdg. demolition cc, b agg BW, plaster, RMC etc. in Kapashera in C-132 NGZ.
MFR Kit, Explosion-Proof Beacon Duo Light for Fire Fighters, Heavy Duty MultiPurpose Demolition and Utility Bar, FireFighter Tool Kit, Fire Proximity Suit, Electric Vehicle EV Fire Blanket
Temporary Provision (Hire) of vehicle mounted DG Sets, cable, flood lights, men powers etc as emergency standby power supply during cyclone/demolition encroachment etc with in NKDA area.
Improvement development of road from Shri Khatu Shyam Mandir to Gaurav House by pdg. demolition cc, BA, MH, RMC etc. in Mahipalpur village in ward no.133 NGZ
Improvement development of road from Gopal Sadan to Bablu Bihari house by pdg. demolition cc, brick agg MH, G.T, RMC etc. in Mahipalpur in C-50- S /NGZ.
DEMOLITION AND RECONSTRUCTION OF STORM WATER DRAIN AND SILT CATCH PIT AT MGR NAGAR 1ST STREET CHAINAGE 0 M TO 220M IN DIVISION-20, UNIT-05, ZONE-02
Improvement development of road from Sanatan Dharm mandir to Lucky house by pdg. demolition cc, brick agg MH, G.T, RMC etc. in Mahipalpur in C-50-S/NGZ.
Tidal bund across pulikkeezhu river at Mahadevikadu
Dismantling and demolishing the existing multistorey structures/buildings at Taimoor Nagar Extension (unauthorised colony), Delhi, including disposal and transportation of debris to the approved MCD C and D waste dumping ground. (Specialized Work)
Boring with hydraulic powering rigs, earth work excavation, pcc, quarry muck filling RCC cenrering shuttering steel reinforcement fixing foundation bolt plastering structural steel work filling driving teak wood pile RR masonry demolishing CC
Tender for execution of work with material under M.C. and E.W. (Con. of Anc. Mon.) S.R. to Demolishing of new structure and conservation of ancient structure at Alamgir Gate Gwalior, Distt. Gwalior (M.P.)
Dismantling/Demolishing PCC,RCC,Brick work,Rubble work,DigestorFoundation concrete chipping,Earth work excavation,refilling,RR,Brick and Solid block masonry,PCC,RCC in various prop,Centering andshuttering,plastering work, Vitrified,Ceramic tiling
Demolishing brick work, CC.Earth work.Shoring and soling.Shuttering work and steel work for RCC.RCC and PCC work.Brick masonry with common burnt clay brick, plastering.Vitrified,Anti skid tiling.Roofing with GI sections and PVC sheet.RR work
The scope of the work includes demolishing the existing cement concrete floor, water proofing,supplying and stacking stone aggregate,providing and laying cement concrete 1 2 4 , providing and laying ceramic floor tiles,
Earth work excavation Demolishing laterate work Laterate masonry Cement Concrete Plastering Steel tubular post for fencing Chain link fencing Surface dressing Supplying stacking 6mm 40mm metal spreading 6mm 40mm metal laying tarpaulin sheet
The items proposed are dismantling tiled roofing, wood work in frames, dismantling doors and windows, demolishing brickwork, old plaster, earthwork in excavation, PCC 1 4 8,RCC 11.53 including centering and shuttering an
Excavation,DRfoundation, RR basement,RCC,solid block walll,sheet roofing, GSB, WMM,BMand BC, demolishing of interlock and relaying the same, concrete drain,bailing out, Engaging scavenger and coolie for cleaning the drain
The provision in the estimate include site providing and fixing partitions wall Melamine polishing Staff table made with 19mm thick marine plywood Painting with synthetic enamel paint providing flush door shutters Demolishing brickworK
scrapping, plastering repair, prime coat, wall painting with plastic emulsion paint, dismantling tile works, demolishing cement concrete providing and laying ceramic glazed wall and floor tiles, vitrified floor tiles, PVC pipes and fittings,
Construction of multi-purpose hall after demolishing the existing hall at M. C. Primary School, Sector-6, R. K. Puram in ward no. 65S Sub Head Provision of Electrical Installations and Air Conditioners
clearing grass, removal of unserviceable earth, providing man mazdoor for clearing obstructions during water distribution providing greese and lubrication oil for shutters, Earth work for bed concrete,Demolishing of existing concrete lining etc
Clearing jungle, Earth work in excavation, Demolishing stone rubble masonry manually / by mechanical means, Solid block masonry, Providing and laying in position cement concrete of specified grade , RING BUND Type-I, RCC etc.
Construction includes Dismantling Roof Tile, Demolishing Wall, Dismantling doors and window ,Earth work, RCC Columns ,Beams and Slabs, Solid block masonry, Ceiling, Plastering, Painting, Tiling, Dadoing, PVC Door frame and Shutter, Aluminium Frame,
The work includes demolishing brickwork dismantling tileworkdemolishing cement concrete solid block masonry CC plastering scrapping prime coat painting floor tiles and wall tiles PVC pipes water supply and sanitary fittings water storage tank
Earth work excavation Driving down teak wood piles Filling quarry muck PCC RCC Steel reinforcement Centering Shuttering FPS Brick work Plastering Open timbering including strutting shoring Painting Filling dept earth Demolishing cement concrete
demolishing cc1 3 6and 1 4 8,Earth work excavation,PCC 1 4 8 40mm,centring and shuttering,Pcc 1 3 6 20mm,Pcc 1 1,5 3 20mm,Steel reinforcement,plastering,Earth filling
Demolishing of old existing footpath, Replace with new Kota Stone flooring in place of existing footpath and Concertina coil fencing work in boundary wall at site of Bhadbhada waste wear campus under Bhopal
The provisions included in the estimate are cleaning, demolishing cement concrete, plumbing work, tile work, aluminium work, water tank cleaning etc. The period of second half RC work for the year 2025-26
Construction of Residential Complex of 333 quarters (120 nos. Type-II (G plus15), 184 nos. Type-III (G plus15), 24 nos. Type-IV plus 5 nos. Type-V (G plus12), Multipurpose hall (G plus1), Substation building & Enquiry office (Civil & Electrical) (G ... , Demolishing of ...
Extraordinary Repair of IBB Roads under IBBR- 56,57,62,64,67,68,69,70,75 and Link Roads(Total Length - 200.05 Km), Culvert Repair 236 Nos, Bridge painting 10 Nos. in the State of West Bengal and Assam along Indo-Bangladesh Border IBB. SH- Earth work, ... and Demolishing work, ...
Various Repair works at Income Tax Colony Indore (M.P.) (1) Repair and Renovation work in Yoga Hall with providing stainless steel wire mesh in windows at Income Tax Colony Indore (M.P.) (2) Demolishing Old brick work drain and fixing of paver block at back side of Type-III and Type-IV block at Income Tax Colony, Indore. (3) Repair and Laying RCC on 1 Nos. badminton court and laying synthetic flooring for 2 nos. badminton court on existing badminton court at Income Tax Colony, Indore (M.P.)
As per NIT
Improvement development of road and Drain from Ashok Pandit to Netaji Ram Singh by pdg. demolition cc, b agg Bw, plaster, RMC etc. in Kapashera in C-132 NGZ.
Construction of Officer club and 2 Nos Type V Quarters including Demolition and Dismantling of existing Club and Quarters, site development and infrastructural works at BSPS Surangani (Chamba) HP
Imp. dev. Of road and drain Rakesh Sehrawat House to Bijender house by pdg. demolition CC, surface dressing, B.Agg. B.W, Plaster, RMC etc. in 50-S Mahipalpur Najafgarh Zone.