Loading…
Loading…
3,579 results • Best match
Neeru-Chettu - Desilting of Pillivagu branch No.5 Minor drain from Km 0.000 to 3.400 including Re-Construction of protection works of banks and existing structures on Pillivagu Minor drain branch No.5 in Bogulu Mandal of SPSR Nellore District.
Desilting and restoration of tank bund and structures of Padamara cheruvu of B.S.Puram for additional storage capacity to meet industrial water requirement of Ceramic cluster near Bhavani Sankarapuram H/o Alathur(V) in B.N.Kandriga(M) of Chittoor District(Item no.02)
Desilting and restoration of tank bund and structures of North tank of B.S.Puram for Additional storage capacity to meet industrial water requirement of Ceramic cluster near Bhavani Sankarapuram H/o Alathur (V) in B.N.Kandriga(M) of Chittoor District (Item no.03)
Desilting of Pucca Drain i) from Modern Cafe Junction to Ginger Oil Mill West Side Bhimavaram Road in 20th and 21st wards ii) From Modern Cafe Junction to Ginger Oil Mill East Side Bhimavaram Road in 14th and 17th wards.
Desilting of Veparalla MI Tank and soil conveyed to the fields of small and marginal farmers of Veparalla, Nagireddypalli, Kasipuram and Kadarampalli villages and Low Lying areas of New Colony & Regradation of vanka in Veparalla Village in Rayadurg (M), Ananthapuramu (Dist.)
Desilting and restoration of tank bund and structures of North tank of B.S.Puram for Additional storage capacity to meet industrial water requirement of Ceramic cluster near Bhavani Sankarapuram H/o Alathur (V) in B.N.Kandriga(M) of Chittoor District (Item no.03)
Desilting of Major, Medium Drains at Wahabpet, Aravinda Nagar, Tekkemitta, Magunta railway track, Lecturers Colony, Ramalingapuram udner bridge area, Muthyalapalem, Harnadhapuram, Surveypalli Kaluva katta, Harnadhapuram extension areas, Yelamavardhina, Bank Colony, Gurralamadugu Sangam, Pragathi Nagar in 13, 16 to 20 Divisions
Desilting and restoration of tank bund and structures of Padamara cheruvu of B.S.Puram for additional storage capacity to meet industrial water requirement of Ceramic cluster near Bhavani Sankarapuram H/o Alathur(V) in B.N.Kandriga(M) of Chittoor District(Item no.02)
Desilting of drain at sabapathi road from 42/477-38 to surya binding at main road,apsara circle from C-25-481 to 7/544 opp more market and opp more market from 7/544 to food nation in 9th division
Desilting of out fall drain from Rajagari center to RK good times and Edepalli Sakshti Temple Back Side,Ep No 47/23 to NEAR NALLA VINAYAKA TEMPLE, Ep No: 47/93 in 44th and 47th Division in Machilipatnam Municipal Corporation.
Desilting of Pedda calava in Divili Village and Formation of cross bund on Jagganna Calva for water dicerting to Kannalanka Calva in Kandrakota Village of Peddapuram Mandal in Kakinada District. (Taking up of mentioned works in areas of immediate need only).
O and M Category A 2020 21 Desilting the Supply Channel and Repairs to Screw gearing steel shutters, Embankment repairs Maintenance of Inspection Path on top of the Bund to the Thikkavaram tank in Chillakuru Mandal of SPSR Nellore District
Desilting of silt from existing manholes of Sewerage network, Repairs and Raising to the existing manholes in the route from Fishing harbour gate/ PS-1 pump house to Coastal battery of under EE-II division of zone-IV in GVMC.
Desilting and providing protection fence around the open well at rear side of chiller plant and other development works, repairs of temple and horticulture development around the Banyan tree under A.R & M.O year 2025-26 program at NACIN campus, Palasamudram, A.P.
Improvements to irrigation system for effective water regulation by dredging on Kaza major drain from km 15.200 to 22.400 in Elamanchili Mandal in West Godavari District.
1) O&M such as Eradication and removal of weed growth in upper pulleru canal its branches from Km.20.400 to Km.34.990 for the year 2022-23. 2) O&M such as repairs to masory of Prodduturu channel at Km.2.600 in the village limits of Prodduturu of ... growth, Desilting and ... to desilting of ... O&M Desilting of ... O&M Desilting of ...
Desilting of Drain from Dadi Reddy House to Paddy Fields drain (Behind ZPHS) and from In front of ZPHS to Paddy fields drain along DC Road and from N-26-365 to Paddy Fields drain in Patha Kadapa H.W. in 1st Division
O & M Desilting of Ravi codu Minor drain from Km 0.000 to 1.300 Polimera codu Minor drain from Km 0.00 to 1.755 in Palacoderu village and Miramia codu minor drain from Km 0.70 to 1.95 in Bhiavaram (T) limits in west Godavari District
Neeru-Chettu - Reconstruction of sluice No.1 & improvements to irrigation channel for sluices with CC walls, desilting for bund strengthening and formation of ayacut road and pipe culvert for irrigation channel crossing for Ithampadu MI tank in Dagadarthi Mandal of SPSR Nellore District
Desilting of main drains from Pedda Gandhi bomma centre to Samata Hospital (Via Potti Sri Ramulu statue and Chinna Gandhi bomma centre), Samata hospital to Nasina Cheruvu and Pakalapati Kishore hospital road in 5, 6, 9, 10 & 22 wards of Nuzvid Municipality
Desilting, Jungle clearance of Feeder Channels for stream-1 from 2.10 km to 5.30 km & stream-2 from 0.00 km to 10.20 km including 2nd order streams of Hatti Belagal MI Tank near Hatti Belagal (V) of Aluru (M) of Kurnool District
O & M Desilting of Ravi codu Minor drain from Km 0.000 to 1.300 Polimera codu Minor drain from Km 0.00 to 1.755 in Palacoderu village and Miramia codu minor drain from Km 0.70 to 1.95 in Bhiavaram (T) limits in west Godavari District
Supply and delivery of 8 Nos. new Backhoe Loader fitted with 0.26 Cum. Excavator Bucket and 1.0 Cum. and above Loader Bucket for desilting the garbage/silt, dozing and lifting from various drains and geddas in various wards of G.V.M.C. (4th Call)
Desilting of Outfall Drain South Side of Nunna Road from Pipula Road junction to ROB and North Side of Nunna Road from Pipula road junction to DP Station and Balance Bit of South Side from Fire Station Road to IRR.(Rc.E11-118082/2019)
Desilting of out fall drains to both sides of Dabakotlu Road and St.Anns American Hospital Road from Nunna Road to Excel plant road in Ajith Singh Nagar 58th and 59th Division of AE-7 Section (By manual means) for summer action plan-2026
O and M Category A 2020 21 Desilting the Supply Channel and Repairs to Screw gearing steel shutters, Embankment repairs Maintenance of Inspection Path on top of the Bund to the Papi tank of Ankulpaturu in Chillakuru Mandal of SPSR Nellore District.
O and M Category A 2020 21 Desilting the Supply Channel and Repairs to Screw gearing steel shutters, Embankment repairs Maintenance of Inspection Path on top of the Bund to the Yedala tank of Ankulpaturu in Chillakuru Mandal of SPSR Nellore District
O & M Desilting of Ravi codu Minor drain from Km 0.000 to 1.300 Polimera codu Minor drain from Km 0.00 to 1.755 in Palacoderu village and Miramia codu minor drain from Km 0.70 to 1.95 in Bhiavaram (T) limits in west Godavari District
Desilting of out fall Drain from Darsipet junction to Ambedkar Nagar Ravi Chettu Centre towards Bandar Canal Outfall Drain and Providing MS Iron Gratings on Out Fall drain at NSM School back side in Ambedkar Nagar, 14th Division.1st Call General Funds
Desilting of out fall drains to both sides of Dabakotlu Road and St.Anns American Hospital Road from Nunna Road to Excel plant road in Ajith Singh Nagar 58th and 59th Division of AE-7 Section (By manual means) for summer action plan-2026
Desilting of Drain from Dadi Reddy House to Paddy Fields drain (Behind ZPHS) and from In front of ZPHS to Paddy fields drain along DC Road and from N-26-365 to Paddy Fields drain in Patha Kadapa H.W. in 1st Division
Desilting of Outfall Drain South Side of Nunna Road from Pipula Road junction to ROB and North Side of Nunna Road from Pipula road junction to DP Station and Balance Bit of South Side from Fire Station Road to IRR.(Rc.E11-118082/2019)
Engaging of 110 HP Chain Hydraulic Excavator and Man Mazdoor for desilting of Drains & for jungle clearance, levelling of roads at SC colony near kotturu ELSR area in Penumaka of Tadepalli under AE-3 Section of Mangalagiri Tadepalli Municipal Corporation under General Funds
Desilting of drains with Shovel in various wards of Nuzvid Municipality
Desilting of Major drains in Ward No 13,14,17,21,23,24,31 of Nuzvid Municipality
O&M Desilting of Gedala codu Minor Drain in between Km 0.00 to 3.30, Vadlavani codu Minor drain in between Km 0.00 to 0.85 in Mogallu Village limits and Kasulavani calva Minor drain from Km 0.00 to 1.10 in Mamuduru village limits in W.G.Dist.
Removal of Weed growth and Desilting in bed and strengthening of banks to F,G,K & L Minors of 20 L Pakalapadu Major Under WUA No.90- Dullipalla-II and M Minor of 20 L Pakalapadu Major Under WUA No.93- Pakalapadu-III( LIS)
Desilting of distributories and repairs to the super passage at ch 15.130 km and construction of protection wall at ch 14.825 km, including jungle clearance of right main canal of Sri Tenneti Viswanatham Pedder reservoir project near Ravipalem (V) in Madugula (M) of Visakhapatnam Dist.
Restoration of Irrigation System for effective Water Regulation incuding Monitoring and Management repairs to inlet at Km 23.050 on Romperu Right arm inlet sluice and Desilting of catch drain along left bank of Romperu Right arm near Pandillapalli (V) in Vetapalem (M), Bapatla(Dt)
Desilting of CC Drains, Cutcha Drains and RCC Culverts and removing and laying of RCC Slabs over CC Drain from Balajidas Street to Seelivari Street, from Bapuji puntha road to ST Colony and from municipal office to 13th ward Shivalayam road in Tadepalligudem Municipality
Desilting of Major drains in 6, 7 & 8 wards of Nuzvid Municipality
Desilting of Ramalayam surplus channel in Dondawaka village limits in Tuni mandal
Desilting of major disposal drain at back side of mahaveer hospital to labourbeedi house at mecleans road and medium disposal drains from virat nagar to lal darga, beside Khuddus nagar mosque to Gatchu kaluva and from gems school to rami reddy canal in Div no. 41
Lifting of Water from RMC Canal to feed Peta tank, desilting of tank bed and improvements to feeder channel from RMC of Polavaram Canal to Peta tank, Atkuru (V), and lifting of water from Eluru Canal to Koneru tank in Atukuru (V), Unguturu (M) in Krishna District
Improvements to Irrigatlon system for effective water regulation by Dredging on Western Arm of West Kukkateru medium drain from km 0.000 to km 6.400 In Narasapuram & Mogalturu In West Godavarl District
Desilting of Pucca Drain i) from Hotel Usha Grand junction to Z.P.School junction along K.N. Road. In 33rd & 8th wards ii) from Sepai peta RTC Depot to Amrutha hospital on K N Road in 33rd ward iii) from Satya Hospital road (KN Road) to Monkey statue in 33rd ward.
O and M removal of weed growth, Desilting Illavaram branch, Burrathumu branch, Kothakalva, Tuvva branch, Kanagala branch, Thotapalli North and South ranches, Drain side channel and its branches of Pamidimarru branch, Dhulipudi South branch, Desammavada branch and eletipalem No.1,II,III branches of nagaram mandal in Guntur District
Desilting of outfall drain to both sides of NSC Bose Nagar main road both sides of LBS Nagar main road, KK Village to Panta Kaluva, RR Peta Railway Track Drain & RR Peta Polie Station Road in AE-13 Section. (By manual and Mechanical Means) for the year 2026
Desilting of Pucca drain 1) Ganesh nagar jn to SVR statue jn left side 2) FCI Colony 3rd street to Rao gari street on bus stand road in 33rd ward 3) From chinna anjaneya swamy temple to seeli vari veedhi at Gandhi statue in 32nd ward in Tadepalligudem Municipality
Desilting of Major drains from Mattam center to President vari street culvert in 22 ward and from Chakravarthi apartments to Busstand in 23rd ward and from Nukalamma temple to Velampeta Vinayaka temple in 25th ward and from Post office to Vigneswara theatre in 26th ward in Samalkot Municipality