Loading…
Loading…
4,749 results • Best match
Improvement of sewerage system by De-silting through SCM at E and F Block Pandav Nagar and Janta Garden in AC-57 in East-I
De-silting of Drain in Ward 64/KPZ.
De-silting of drains in Ward 66/KPZ.
De-silting of 450 mm to 900 mm dia peripheral /Trunk sewer line by super sucker from Block 31 to Block 36 Trilokpuri in AC 55.
REPAIR AND MAINTENANCE INFRASTRUCTURE ASSETS IN R-II DIVISION DURING 2021-22. SH - DE-SILTING OF DRAINAGE LINE FROM 1 SAFDARJUNG LANE TO 15 SAFDARJUNG LANE
TECHNICAL MAINTENANCE OF SW DRAINAGE IN R-II DIVISION. SH - DE-SILTING OF DRAINAGE LINE FROM BHARTI NAGAR SIDE TO ARCH BISHOP ACROSS GOLF LINK COLONY
Repairing and renovation of SPS i/c de-silting through super sucker in Pocket F Mayur Vihar Phase-2 under EE(East)-I in AC-57
Technical Maintenance of SW Drainage system in R-II Division during 2021-22. SH - De-silting of storm water drain in back side of Bharti Nagar
M/o various schemes under NA-II (East Zone).SH-De-silting of open and covered S.W. Drains along with culverts in I.P. Extension (Extended Area).
Hiring of machinery for de-silting/removal of silt from 52 cusec drain from Loni Road to Babarpur Road falling in Ward No. 50E under the jurisdiction of EE(M-III), Shahdara North Zone
Technical and Maintenance of Storm Water Drainage System in R-IV Division during 2026-27. SH-De-silting of storm drainage lines on various roads under jurisdiction of Kautilya Marg Drainage Service Centre R-IV Division.
De-silting of fruit market drain both side from From Main seelampur road to chauhan bangar culvert SH1- 1st, 60 percent of Desilting of drain in 1nd Phase from 16.01.2025 to 15.06.2025 SH2- 40 percent of Desilting of drain in 2nd Phase from 16.06.202
De-silting of gokulpur drain from Jafrabad culvert to Road No-66 at Zero pusta point SH1- 1st, 60 percent of Desilting of drain in 1nd Phase from 16.01.2025 to 15.06.2025 SH2- 40 percent of Desilting of drain in 2nd Phase from 16.06.2025 to 15.01.202
De-silting of Rajender parsad drain from From Gokulpur drain to near chand masjid Gali no-6 jafrabad SH1- 1st, 60 percent of Desilting of drain in 1nd Phase from 16.01.2025 to 15.06.2025 SH2- 40 percent of Desilting of drain in 2nd Phase from 16.06.2
De-silting of Karawal Nagar Nalla from Sadatpur gali no-6 to mukhiya market chowk L.H.S SH1- 1st, 60 percent of Desilting of drain in 1nd Phase from 16.01.2026 to 15.06.2026 SH2- 40 percent of Desilting of drain in 2nd Phase from 16.06.2026 to 15.01.
De-silting of gokulpur drain from Brahpuri culvert to Jafrabad culvert SH1- 1st, 60 percent of Desilting of drain in 1nd Phase from 16.01.2025 to 15.06.2025 SH2- 40 percent of Desilting of drain in 2nd Phase from 16.06.2025 to 15.01.2026 in ward No-2
De-silting of Karawal Nagar Nalla from Sadatpur gali no-6 to mukhiya market chowk L.H.S SH1- 1st, 60 percent of Desilting of drain in 1nd Phase from 16.01.2025 to 15.06.2025 SH2- 40 percent of Desilting of drain in 2nd Phase from 16.06.2025 to 15.01.
De-silting of gokulpur drain from R-block culvert to S-block brahpuri culvert SH1- 1st, 60 percent of Desilting of drain in 1nd Phase from 16.01.2025 to 15.06.2025 SH2- 40 percent of Desilting of drain in 2nd Phase from 16.06.2025 to 15.01.2026 in
M/o Completed schemes under Flyover Nazul A/c-II, Project Zone during the year 2021-22.Sub Head -De-silting of S.W. Drain under Dwarka Flyover.
De-silting of 450-500 mm dia peripheral sewer line by Super Sucker from Buddha Marg to Tarang Apartment Narwana road Ward No.200 in AC-58
Improvement of sewerage system by de-silting through Bucket system driven by SCM Machine at ward no. 208 and 209 in AC-60 under EE(C)-03.
M/o Various scheme under N.A-II/EZ. SH - De-silting of covered nallah from LBS Hospital Opp. Gate No. 1 to near Petrol Pump Kalyanpuri road.
M/o various scheme under Nazul A/c-II (EZ). SH - De-silting of Open and covered S.W drain along with culverts in I.P. Extension (Extended Area).
TECHNICAL MAINTENANCE OF SW DRAIANGE SYSTEM IN R-II DIVISION DURING 2022-23.SH - DE-SILTING OF DRAINAGE LINE ALONG AB FLAT SHAHJAHAN ROAD TO PANDARA ROAD
De-silting of sewer lines by SCM in Balbir Nagar, Balbir Nagar Extn, Balbir Nagar Nalah Par and Jyoti Colony in AC-67 NE-III (Re-invited)
De-silting of sewer lines by S.C.M. in welcome Double Story sartaj mohalla / Kanti Nagar Extn. and adjoining area in ward no. 213 under EE(Civil)-04
De-silting of Sewer Lines by SCM in Shanti Mohalla and its adjoining areas in Ward No. 214, in AC-61 Gandhi Nagar, under EE(C-04)
Repair and Maintenance of Infrastructure Assets in R-IV Division during 2021-22. Sub-Head-De-silting of existing lines and constructing GT at D-I and D-II Flats under Sub- Division-III(R-IV).
De-silting of drain from slip road shastri park to GT Road Pump house and removal of silt to SLF in W.no 213 AC-61 Sh. S Zone
Hiring of 02 Nos Sewer Manhole de-silting machine mounted on three wheeler with Driver and Helper for narrow streets of Trilokpuri AC-56 under AEE M-55
De-silting katcha nalla i.e Geeta Colony drain from Raja Ram Kohli Marg to Shastri Nagar culvert in in W No.24E AC-60 Geeta Colony Sh.S Zone
Hiring of 01 No. Sewer Manhole De-silting machine mounted on three wheeler with driver and helper for narrow streets of Kondli AC-56 under EE(D)-011
A R and M O to Ancillary buildings, Tis Hazari Courts Complex, Delhi dg 2024-2025 SH Internal and External finishing, cleaning and de-silting of sewer line.
T/M of SW Drains in R-I Division during 2020-21. SH De-silting and reconstruction of Manhole along Jam Nagar House outer circle of C-Hexagon
A/R and M/O to Ancillary Buildings, Tis Hazari Courts Complex, Delhi dg 2021-2022 (SH Internal and External finishing, cleaning and de-silting of sewer line.)
De-silting of drain from slip road shastri park to GT Road Pump house and removal of silt to SLF in W.no 213 AC-61 Sh. S Zone
Technical Maintenance of SW Drainage system in R-II Division during 2021-22. SH - De-silting of drainage line from house No.23 to 1 No. Golf Link
A/R and M/O to Ancillary buildings, Tis Hazari Courts Complex, Delhi dg 2023-2024 (SH Internal and External finishing, cleaning and de-silting of sewer line.)
De silting by super sucker machine
De-silting of Pusta road Nalla from 28 ft road to Mariginal bandh road both side SH-1 1st, 60 percent of Desilting of drain in 1nd Phase from 16.01.2026 to 15.06.2026 SH2- 40 percent of Desilting of drain in 2nd Phase from 16.06.2026 to 15.01.2027 in
De-silting of Pusta road Nalla from 28 ft road to Mariginal bandh road both side SH1- 1st, 60 percent of Desilting of drain in 1nd Phase from 16.01.2025 to 15.06.2025 SH2- 40 percent of Desilting of drain in 2nd Phase from 16.06.2025 to 15.01.2026 in
De-silting of Vijay park Nalla from Red light vijay park to Gali No-16 adarsh mohalla SH1- 1st, 60 percent of Desilting of drain in 1nd Phase from 16.01.2025 to 15.06.2025 SH2- 40 percent of Desilting of drain in 2nd Phase from 16.06.2025 to 15.01.20
Hiring of sewer manhole de-silting machine mounted on three wheeler BAJAJ BS4/PIAGGO with driver AND helper in AC-56 East-I (For the financial Year 2022-23)
De-silting of 450 mm to 900 mm dia peripheral /Trunk sewer line by super sucker from New Ashok Nagar Metro Station to New Ashok Nagar in AC 55.
Improvement of sewerage system by De-silting of sewer line in command of SPS Mandawali through SCM at Railway Colony Mandawali Village in AC-57 under EE (M)-57
A/R and M/O Drains and Bunds during the Financial Year 2021-22. De-silting of Ponds Kh. No. 81/14 at village Dichaon Kalan in Najafgarh Block.
Hiring of Sewer Manhole de-silting machine mounted on three wheeler Bajaj BS4 /PIAGGO with Driver and Helper in AC-56 East-I (For the Financial Year 2021-22)
De-silting of Sewer Lines by SCM in Raghubar Pura No. 2 and its adjoining areas in Ward No. 214, in AC-61 Gandhi Nagar, under EE(C-04)
De-Silting work
De-silting work