Loading…
Loading…
2,842 results • Best match
AMRUT2.0 -Perumbavoor-WB Rejuvenation-AIRATTUCHIRA POND -RENOVATION OF AIRATTUCHIRA POND(SIDE PROTECTION AND CLEANING ETC. The Airachira pond in Perumbavoor Municipal area is proposed to be rejuvenated by desilting, weed removal, side protection work
GENERAL Desilting MONSOON PREPAREDNESS Desiltation of Blangachal Arappathode for a length of 300m in Manappattuchal in Eriyad Panchayath and 450 m south of British bridge in Edavilangu panchayath in Kodungallur Taluk General Civil Work
The items included in this estimate are clearing jungle, felling trees,demolishing cement concrete, earthwork excavation for foundation, desilting canal, CC 148 for levelling course, CC 124 for side wall, reinforcement for side wall.
clearing Jungle earth work
Ring bund ,Bailing out ,Earth work excavation
Clearing Jungle, Earthwork Excavation ,Supplying and fixing Information Board etc.
Side protection works of thodu
side protection work of Kundoor thodu tributory of Thoombathodu
The items of the estimate are Clearing jungle, Earthwork for side lowering,foundation and desilting, Concrete CC 148 for foundation levelling course, Concrete CC 124 for foundation and superstructure of side wall, filling with contractor own ea
This work includes clearing grass and jungle on the canal and canal bunds and desilting of canal system by using hydraulic excavtor. The estimate has been prepared based on DSOR 2021 with cost index of 144.45. The
Silt work,clearing jungle,Earth work
Work includes cleaning of Kinavallur branch canal for 2023-24 second crop and 2024 first cropMankara, Pathirippala, palappuram branch canals and Minor Distributorys and Field canals
The items included in this estimate are Clearing grass, Bailing out water, demolishing cement condemolishing stone rubble masonry, Earth work excavation for desilting, lining CC 1 3 6 for Bed and side lining, sluic chamber, parapet wall near
NIPDesilting works to Poovar East Branch channel at ch 0m to 8700m, Side protection work Olathanni Branch channel near ch1350m and Reformation works near ch3850m and reformation works to Sabarimuttom field channel a
cutting branches
Urgent rectification of Kakkodi branch canal
Cleaning of Vallikkode I branch canal for second, first crops and as and when required
The cleaning of canals and desilting is inevitable to enable smooth water distribution and conveyance of through the RBC main canals to the paddy fields during this year 2025-26 and this work needs to be executed prior to water distribution
The cleaning of canals and desilting is inevitable to enable smooth water distribution andconveyance of water through the RBC main canals to the paddy fields during this year2024- 25 and this work needs to be executed prior to water distribu
The cleaning of canals and desilting is inevitable to enable smooth water distribution and conveyance of water through the RBC canals to the paddy fields during this year 2025- 26 and this work needs to be executed prior to water distribution.
This work includes clearing grass and jungle on the canal and canal bunds and desilting of canal system by using hydraulic excavator , man mazdoor for cleaning at under tunnel, since the canal runs through kavilpad town area the silt ex
The cleaning of canals and desilting is inevitable to enable smooth water distribution andconveyance of water through the RBC main canals to the paddy fields during this year2024- 25 and this work needs to be executed prior to water distribution
The cleaning of canals and desilting is inevitable to enable smooth water distribution andconveyance of water through the RBC main canals to the paddy fields during this year2024- 25 and this work needs to be executed prior to water distribution
The cleaning of canals and desilting is inevitable to enable smooth water distribution and conveyance ofr through the RBC main canals to the paddy fields during this year 2025-26 and this work needs to be executed prior to water distribution
The cleaning of canals and desilting is inevitable to enable smooth water distribution andconveyance of water through the RBC main canals to the paddy fields during this year2024- 25 and this work needs to be executed prior to water distributio
The cleaning of canals and desilting is inevitable to enable smooth water distribution andconveyance of water through the RBC main canals to the paddy fields during this year2024- 25 and this work needs to be executed prior to water distribution
Earth work, Clearing Jungle,Engaging Hydraulic Excavator
Earth work , Clearing jungle, Engaging Hydraulic Excavator
The provisions included in the estimate are 1 C l e a r i n g g r a s s 2 C l e a r i n g j u n g l e 3 Earthwork excavation for desilting canal bed.
The provisions included in the estimate are 1 . C l e a r i n g g r a s s , 2 . C l e a r i n g j u n g l e , 3.Earthwork excavation for desilting canal bed
This work includes clearing grass and jungle on the canal and canal bunds and desilting of canal system by using hitachi. The estimate has been prepared based on DSOR 2021 with cost index of 144.45. The amount of estimate comes to 970000
This work includes clearing grass and jungle on the canal and canal bunds and desilting of canal system by using hydraulic excavator and man mazdoor. The estimate has been prepared based on DSOR 2021 with cost index of 144.45 The amount of
This work includes clearing grass and jungle on the canal and canal bunds and desilting of canal system by using hitachi. The estimate has been prepared based on DSOR 2021 with cost index of 144.45. The amount of estimate comes to 10.50lakhs
removing silt grass jungles using Man Mazdoor and Hydraulic excavator for the free flow of water during the distribution of the second crop 2022 and the first crop 2023 under Mundur Canal Section
Desiltation.
G E N E R A L - P R E M O N S O O N W O R K - Desilting of Maruthorvatom Valiya Thodu in Ward no.20 of Thanneermukkom Panchayth of Cherthala LAC -Near Maruthorvattam Bridge towards North- General Civil Work
Refer tender document
RECTIFICATION WORK OF LEAKAGE OF PIPE LINES AND OVERHAULING OF MOTOR PUMP SET-General Mechanical Work
Cleaning of RB Main canal between Ch 29/000 and 32/000 km for second crop, first crop and as and when required
Clearing Grass Earth Work Exacavation
PLAN WORK
The items of the estimate are Earthwork for desilting, side cutting and foundation. providing Ring bund and bailing out. CC 1 3 6,40mm . R C C 1 2 4 ,20mm nominal size,C C 1 3 6 40mm nominal sizr,R C C 1 1.5 3 20 mm nominal size