Loading…
Loading…
42,239 results • Best match
Facility Management Services - LumpSum Based - As per SCC and Scope of Work; Preliminary Up - keeping and Routine maintenance of Electrical Hydro-mechanical Equipment and structures at Dam site Radial gates Intake gates De-silting Chamber Surge Shaft..
Desilting of sewerage manhole by mechanical method using desilting machinery required to de-silting work including dispose-off de-silted silt out side the city etc on Ward No. 17 Hisar Town.
Desilting of sewerage manhole by mechanical method using desilting machinery required to de-silting work including dispose-off de-silted silt out side the city etc on Ward No. 16 Hisar Town.
Improving Drainage capacity/Silt clearance of Harnad Drain from km. 42.060 km. 47.000
Improving Drainage capacity/Silt clearance of Harnad Drain from km. 47.050 km. 51.800
Silt Clearance work of Jasrana Naveen Nahar From Km 20.250 to Km 25.320
Silt Clearance work of Jasrana Naveen Nahar From Km 10.220 to Km 15.200
Silt Clearance Work For Jasrana Naveen Nahar From Km 0.000 to Km 3.700
Silt Clearance work for Jasrana Naveen Nahar From Km 13.100 to Km 18.400
Silt Clearance work for Jasrana Naveen Nahar from Km 18.700 to Km 25.000
Improving Drainage capacity/Silt clearance of Harnad Drain from km. 51.850 km. 58.000
Silt Clearance work of Jasrana Naveen Nahar From Km 15.230 to Km 20.200
Silt Clearance work of Jasrana Naveen Nahar From Km 5.050 to Km 10.200
Silt Clearance work for Jasrana Naveen Nahar From Km 8.300 to Km 12.800
Silt Clearance work of Jasrana Naveen Nahar From Km 0.000 to Km 5.000
Silt clearance work for Jasrana Naveen Nahar From Km 4.100 to Km 8.000
GENERAL-Dredging -Dredging and silt removal work on Vaduthala-Chittoor-Marine Drive backwaters to improve backwater traffic and prevent waterlogging in the city in Ernakulam District-General Civil Work
Scraping/Silt clearance of Firozabad Dy. From km. 0.000 to km. 33.500
Cleaning/De-silting of Sewer lines Using Bucket Machine Acharyapuri, Ganga Vihar and Sector-12A, Sector-12A Pocket-C and Sheetla Colony block A and B in Ward No.26 ( New Ward) under Zone-IV B, MCG. (Recall)
De-silting of P.T Sewer at Main Road GTB Nagar, Kotkapura by Super Sucker Machine (Provided by ULB) as per rate list attached and CCTV Camera including disposel of silt upto 05 km at Kotkapura Town Distt. Faridkot
Slope protection work at L and R bank, bed lining at u/s and d/s of CD at RD 36.016 km, de-silting and re-sectioning in between RD 35.800 km to RD 36.500 km of GMC
Cleaning/De-silting of Sewer lines Using Bucket Machine Acharyapuri, Ganga Vihar and Sector-12A, Sector-12A Pocket-C and Sheetla Colony block A and B in Ward No.26 ( New Ward) under Zone-IV B, MCG. (Recall)
Comprehensive maintenance of street lighting on PWD roads under West Electrical Division dg. 2025-26. (SH- De-silting and cleaning of sumps at Bhera Enclave Underpass and Punjabi Bagh Underpass under West Elect. Division, New Delhi). (SHORT NOTICE)
Cement Concrete Channeling from RD.3.140Km to RD.3.225Km, RD.3.000Km to RD.3.345Km, RD.3.450Km to RD.3.510Km, RD.3.600Km to RD.3.660Km, De-silting and Jungle clearance from RD.0.00Km to RD.5.820Km of Kunchanpalli Minor
Providing CC channeling from RD 0.350 km to RD 0.580 km, strengthening to bank in between RD 0.750 km to RD 1.500 km of MV-54 Sub-Minor-I, de-silting and jungle clearance of MV-54 Minor
De-silting / Cleaning of Nallah by manually or Mechanical means with safety Equipments from Lajpat Chowk to Moti Mahal Corner in Sec-16 and Sai Mandir to HEWO Appartment Chowk in Sector-16 A Ward No 31 Faridabad.
Operation and Maintenance of sewerage system including De-silting, attending day to day complaints replacement of manhole covers and frames, manhole slabs, O and M sewerage disposal , any type of machinery i.e super sucker machine jetting machine buc
De- silting of nallah at 2K/42BP to Hardware Chowk (outer road nallah) and Masjid to 3 no. Pulia, 3 no. Pulia towards 17 no. chungi on Dabua -Pali Road nallah in Ward No.12 (New Ward), Faridabad.
Removal of slips slides surcharge De-silting of Culverts Restoration of damaged berms clearance of drains and cloud burst at various spots , clearance of deposited mulba from choked culverts etc. Buffliaz side Km 0 000 to 43 600.
A/R and M/O Drains and Bunds during the Year 2022-2023. Providing and laying of RCC Pipe NP-3 class and de-silting of water Body bearing Kh. No. 896 at village Jaffarpur in Najafgarh Block.
Slope protection work at L and R bank, bed lining at u/s and d/s of CD at RD 32.608 km, de-silting and re-sectioning in between RD 33.200 km to RD 34.000 km of GMC
Pre-monsoon de-silting and annual maintenance of SW drains by bucket cleaning method in Hakeempet kunta, Jhanda galli, Sana Hotel main road, Patel Galli etc., under Nanal Nagar-69, Div-13, (KZ), GHMC for the year 2020
Pre-monsoon de-silting and annual Maintenance of nala at Virasath Nagar Colony outlet and Nadeem Colony culvert & Shah Hatim tank outlets in Tolichowki-68, Div-13, (KZ), GHMC for the year 2020 (Reserved for SCs) (1st Recall)
Rough Cost Estimate for Cleaning/De-Silting of Nallahs by Mechanical Mean from Latadhari Mandir to Main road near Shamshan Ghat in Village Ankhir and Lakhmi Chand House to Tejpal House in Village Anangpur, Ward No.18, Faridabad
De-silting of drain from Gali No. 17 Ajeet Nagar-to Drain NO.1 (2) slip road shastri park to GT Road Pump house and removal of silt to SLF in W.no 213 AC-61 Sh. S Zone
Repair and renovation of fall at RD 2.205 km, providing CC channeling from RD 1.650 km to RD 1.890 km, de-silting and jungle clearance from RD 1.400 km to RD 2.895 km of Chitrangaplli Sub-Minor-I
Rough Cost estimate for cleaning /de-silting of nallahs from Mulla hotel to hanuman mandir, Neelam to B.K chowk, fruit garden to SBI Bank, B.K chowk to shivaji park and Ajronda chungi to railway line in ward 14
Pre Monsoon De-silting and Annual Maintenance (for the year 2021)of Storm water drain / Nala (by Manual with Labour) at Various places in Ward No.5 Mallapur of Kapra Circle-1, GHMC. (Reserved for ST & ST Societies)
( invited under Earmarked works - ST- Contractor of class V& Above are only eligble to participate ) O&M DE-Silting of Naleshwar Matu Canal from Ch. 0.00 Km to Ch. 9.210 Km in Navipet (M) Nizamabad Dist 1st call
NEERU - CHETTU- Estimate of Jungle Clearence , De Silting and Strengthening of Canal Bank from KM 0.000 to KM 1.000 of 4 th Branch Canal of SSG Canal under Neeru Chettu Programme ,Palugodu(V), Dakkili (M),SPSR Nellore(Dt)
Providing CC channeling from RD 0.00 km to RD 0.047 km, in between RD 0.300 km to RD 0.400 km and RD 0.930 km to RD 1.000 km, de-silting and jungle clearance of Tamasa S/M-I
De-silting of drain from H. No. D-129, Gali no. 10 Gamri extn. to C-44/245 Pappad wali pulia in ward no. 230 Bhajanpura in AC-66 under the juridiction of EE (M-II) Shah.N. Zone
Restoration , De-silting, and Providing Grill Cover, Fenching to the Open Well at Ramamoorthy Puthur, Allikuttai Bus Stop, Sengalanai Road Near Burial ground, Modern Builders Colony, Sundaraganapthy StDiv-9, 10,11, 35, 36, 37, 38,42, 44 of Zone-III
NEERU - CHETTU- Estimate of Jungle Clearence , De Silting and Strengthening of Canal Bank from KM 0.000 to KM 1.000 of 4 th Branch Canal of SSG Canal under Neeru Chettu Programme ,Palugodu(V), Dakkili (M),SPSR Nellore(Dt)
Renovation and Construction of fall at RD 1.890 km, CC channeling within RD 1.520 km and RD 2.070 km and de-silting and re-sectioning from RD 0.100 km to RD 1.320 km of Kenduguda S/M-I
SILT CLEARANCE OF JARARI DY. FROM KM. 0.00 TO 16.800
Silt Clearance from Km. 0.00 to 24.800 on Nuh Dy.
Jungle/ Silt clearance of D2 of RD 0-5200 M
Silt Clearance from Km. 0.00 to 12.900 on Maho Dy.
SILT CLEARANCE OF PACHAWAR DY. FROM KM. 0.00 TO 20.800