Loading…
Loading…
3,799 results • Best match
Premonsoon and Post Monsoon desilting of Hussain Sagar Surplus Nala from St.No.9 to Chikkadpally Bridge for the Year 2021 in Himayathnagar Ward 79, Circle 16, SBZ, GHMC (Reserved for SC LCCS)
Annual maintenance - Desilting work by Manual Means in Open Nalas,Open Drains and Under Slab portion in Ahmednagar - 74, Circle-12, KZ, GHMC for the year 2022. (item No.1) (10th Recall)
Annual Desilting (Mechanical ) of Open Nalas/SW drains at Various places in Rajendranagar Division for the year 2022 in Ward No.60,Rajendranagar in Rajendranagar Circle, GHMC. (Rs. 8.60 Lakhs) (Re call)
Pre-monsoon Desilting and annual Maintenance of storm water drains by bucket cleaning method at sadath nagar,ahmed colony,company bagh,Baghdad colony under golconda corporator division-67,Div-13,KZ, GHMC
Annual desilting of storm water drains and katcha nalas by manual means in Ward No-131 for the calendar year of 2019-20 in Quthbullapur Circle, GHMC (Completion Period 12 Months) (Recall)
Pre-monsoon Desilting and annual Maintenance of storm water drains by bucket cleaning method heera khana,afsar khan under golconda corporator division-67,Div-13,KZ, GHMC(Reserved for STs) (1st Recall)
Annual Desilting and Annual maintenance of Storm water drains by bucket cleaning machine at Various locations of Langer House Corporator Divn.66 (Reach-I), Cir-13, KZ, GHMC for the year 2024
Desilting of Sewer lines and manholes using Bucket Cleaning Method at Phase-6 and Phase-7, KPHB colony under KPHB Section, Sub Division No-III, O and M Division No IX, Kukatpally.
DMFT-Sangareddy District- Execution of work under District Minenal Foundation Committee funds- Desilting of Existing Field Channel to Right Flank Canal of Nallavagu Project at Sulthanabad Village of Sirgapur Mandal -Sangareddy District
Annual Maintenance (desilting) of SW drain pipe line and catchpits in block 15 of Ward.No.50-Begumbazar Division in Div.14,Cir.14,KZ,GHMC for the year 2024. (Rs. 12.40 Lakhs)
Pre Monsoon and Annual Desilting of Nala from post office to Talha Masjid E Raba of 34-Talab Chanchalam in Santosh Nagar Circle-7, South Zone, GHMC. Rs. 3.70 Lakhs (2nd Recall)
Desilting of Major Nala from Saikrishna Colony Kaman to Royal Enfield Service Centre, Saraswathi Nagar in Ward No.10-Uppal in Division No.2, Uppal, GHMC for the year 2022. (3rd Recall)
Premonsoon desilting annual maintenance of SW drains & Box drains at Enginebowli Charchaman bye lanes Madina Colony bye lanes Bibi Ka chasma Pardagate in Falaknuma divn (RESERVED FOR ALL SC INDIVIDUALS/ PROPRIETORSHIP FIRMS)
Cleaning of all Internal roads,desilting of drains and removal of derbies of Construction waste including repairs of pot holes with CC Pavements at Auto -Nagar,Nizamabad,Nizamabad District (Under IALA funds)
Annual Desilting and Annual maintenance of S.W.Drains by Bucket Cleaning for the Year - 2022 in Bagh Amberpet Division Ward-84, Amberpet Circle-16, SBZ, GHMC (Item No.09 Rs.25.00 Lakhs) (RECALL)
Premonsoon Desilting and Annual Maintenance of SW Drain using Bucket Cleaning throughout the year 2022 in 97- Somajiguda division, Div.17, KZ, GHMC for the year 2022 (5th call) (Item No.02)
Pre-monsoon Desilting and Annual Maintenance of Minor SW drain (by Manual) for the year 2019 at Venkatagiri, Krishna Nagar, Hylam Colony in 96-Yousufguda division, Circle-19,SLPZ, GHMC (6th Recall)
Annual desilting storm water drains and katcha nalas (BY MANUAL MEANS) in Ward No. 126-Jagathgirigutta, Gajularamaram Circle-26, GHMC (Item No.1) (Completion period: 12 months) (Reserved for SC/ST/WLCCS)
Pre-monsoon Desilting of Nalas and Storm Water Drains of Hissam gunj Monda Market Nala, marredpally div in 150-Monda Market Corporator Dvn. Under Division-18A, Sec'Bad, GHMC for the Year 2019
Desilting of Major Nalas from Kailashnagar Nala to MNR school & Bhavanipuram to Shankarnagar, in Ward No. 110-Chandanagar for the year 2019 in Division no.21, Chandanagar Circle, SlpZ, GHMC (Mechanical means)
Desilting of Nala from Taranagar culvert to Shankernagar for Pre-monsoon, during monsoon, post monsoon in Ward No. 110 for the year 2018 in Division-21, Chandanagar Circle, WZ, GHMC-Re Call
Annual Maintenance for desilting of SW drain pipe line and catchpits in block 15 of Ward.No.50-Begumbazar Division in EE.Div.14,Cir.14,GHMC for the year 2020 (Rs. 7.23 Lakhs)
Manual desilting of drain from Vasudeva Bloom Field to Alliens Space Station at Radial road 30 in Tellapur, Ward No.263, Patancheru Circle-46, SLP Zone, CMC (Rs.43.50 Lakhs) (2026-27)
Annual Desilting and Annual maintenance of SW drains by bucket cleaning machine in HakeempetKunta,JhandaGully,Sana Hotel Mainroad,PatelGully,etc., under Nizam Colony-129,Div-32,GZ,GHMC for the year 2026
Jungle clearance from km 0.00 to Km 5.585 and silt removal from Km 0.60 to Km 3.00 of 19th Mangapuram Major Canal of NSLBC Main Canal in Mudigonda(M), Khammam (Dist).
Clearing of Jungle Growth, silt removal at Toe Drain and Formation of Gravel Road adjacent to the Toe Drain of the Gaddennavagu Medium Irrigation Project, Bhainsa Village and Mandal, Nirmal District
R.B.L.I.S.P. - SBBR - Silt Removal in Canal bed and Jungle Clearance of Inspection Paths of Distributaries of LL LMC of Chittem Narsi Reddy (Sangambanda Balancing Reservoir), Sangambanda (v), Makthal (M), Narayanpet district
Premonsoon Desilting and annual maintenance of storm water drains by bucket cleaning method at Md lines, Owaisi Colony, Balreddy Nagar, Akberpura and Virasath Nagar under Tolichowki corporator division-68,Div-13,KZ, GHMC
Desilting of Major Nala from High Court Colony to Kaveri Nagar Culvert in W.No.7-Chilkanagar in Uppal Circle-2, GHMC for the year 2024-25. (Reserved for SC Community Individuals and Societies)
Premonsoon desilting and annual maintenance of open nala Laxmamma Park foot bridge to Brindavan Colony via Achute Reddy lane in Adikmet Division, Division - 15, Sec-bad Zone, GHMC (5TH CALL) (Rs. 16.60 lakh)
Premonsoon desilting and annual Maintenance of nala at Virasath Nagar Colony outlet and Nadeem Colony culvert & Shah Hatim tank outlets in Tolichowki-68, Div-13, (KZ), GHMC for the year 2019 (5th Recall)
Desilting of Nalas in various places like Bachukunta, Vaishali Nagar, etc. for pre-monsoon, during monsoon and post monsoon in Ward No. 109-Hafeezpet in Division no.21, Slp Z, GHMC (Mechanical Means)
Desilting of drains Engaging of TATA HITACHI Major nala passing from Ashok Nagar at Vinayaka Nagar bridge to Sri Sai Nagar Colony in Ramachandrapuram, for the year 2019 Circle 22, Serilingampally Zone GHMC
Pre-monsoon Desilting of Nalas and Storm Water Drains in East Marredpally and West Marredpally in div 150-Monda Market Corporator Dvn. Under Division-18A, Sec'Bad, GHMC for the Year 2019 (6th call)
Annual Maintenance (desilting) of open nala by engaging Hitachi from Begum Bazar PS to Topkhana in 50-Begum Bazar under Division-14,GHMC for the year 2025 ( Item no.1) -Rs. 9.30 lakhs
Premonsoon Desilting and Annual Maintenance(by manual) of Major S.W drain for the year 2019 from Lakshmi complex to Natraj Nagar, Prem Nagar in 101- Erragadda division, Circle-19,SLPZ, GHMC (7th Recall)
Pre Monsoon and Annual Desilting of SW Drain and minor nalas by manual means in Akberbagh, Div-27, Cir-6, GHMC. ( Reserved for SC, ST, Waddera and Uppera LCCS Ltd. ) ( 4th Re Call )
Annual Maintance from Desilting of SW Drain 2024 at Sriramnaga,Ramcharan oil mill, HB colony,kattedan, and Various locations in Mailardevpally Ward No.59, in Rajendranagar Circle, GHMC. (Bucket meachine) (Rs.13.90 lakhs)
Desilting of storm water drain from Sridevi Hospital to weekly market, engaging of labours, JCB and Tractor with trolly for lifting and Dumping of MCK Est cost of Rs. 5.35 Lakhs under MGF
Desilting of Storm Water Drians where Recycler is not accessible (Manual means) in various places in Ward 107-Madhapur for the year 2019 in Division no.21, Chandanagar Circle, SlpZ, GHMC - Re Call
Pre-monsoon and Post-Monsoon Desilting of Picket Nala from SP road to STP Plant in 149-Begumpet Corporator Divn Under Circle-30,North Zone GHMC for the calendar Year 2020.(5th Recall)
Pre Monsoon and Annual Desilting of SW Drains in Siddiqui Nagar, Nasheman Nagar, Khan Nagar and Akram Nagar of 34-Talab Chanchalam in Santosh Nagar Circle-7, Charminar Zone, GHMC. Rs. 7.05 Lakhs
Pre Monsoon and Annual Desilting of main nala from Labour adda to Khan nagar via Diamond Hotel of 34-Talab Chanchalam in Santosh Nagar Circle-7, Charminar Zone, GHMC.Rs. 9.10 Lakhs (3rd Recall)
Annual Maintenance (Desilting) of Major Nalas by Machinary in 76- Mallepally Corp div, Ward No.11, Div-12, Cir-12, KZ, GHMC for the year 2019-2020.(5th Re-call)(Item No.14)
Desilting of sewer pipes line in narrow lanes road width less than 1.5 mtrs at various places of Santosh nagar, Madannapet, Yakutpura and Gowlipura sections, SD-II and IV of O&M Dn.II
Pre-monsoon & post monsoon desilting of Nalas and Storm Water Drains by manual in Bansilalpet in 147-Bansilalpet Corporator Dvn. Under Division-30(Begumpet), Sec'Bad, GHMC for the calendar year 2021.(4th Recall)
Pre-Monsoon desilting of open nala and Annual Maintenance of open / katcha nala (By Machinery) from Errakunta To Silt Chamber in Indira nagar in Nacharam ward No.6 of Kapra Circle, GHMC. (Recall)
Annual Desilting (Mechanical means) of Nalas/ SW drain for the year 2019 at Ali nagar and other places in Ward No.58-Shastripuram Division in Rajendranagar Circle-11, GHMC (Recall) (Rs. 7.50 Lakhs)
Pre-monsoon and Post-Monsoon Desilting of kukatpally nala from varun motors to prakashnagar extension (mechanical means) in 149-Begumpet Corporator Divn Under Circle-30,North Zone GHMC for the calendar Year 2020.
Annual Desilting (Manual means) of Nalas/ SW drain for the year 2019 in at Budwel, VarmaBhavathguda, Fortview Colony and Upperpally in Rajendranagar Ward No.60 in Rajendranagar Circle-11, GHMC (Rs. 6.00 Lakhs)