Loading…
Loading…
1,812 results • Best match
Engagement of Mazdoor labours for the works of cleaning of bar screen desilting and other allied works at Thanthania Drainage Pumping Station under PBPS.(Dr.)/S and D
Rejuvenation of waterbody including construction of one new ghat, partial renovation of existing ghat, desilting and soft landscaping at LayelkaPond,Regent Estate, Ward No 96, KMC (2nd Call)
DESILTING OF SURFACE DRAIN STARTING FROM 36 MIRPARA SANI KALI MANDIR TO 117/1 MIRPARA ROAD SAKTI SANGH UNDER WARD NO 34 OF BALLY MUNICIPALITY FOR 180 DAYS
DESILTING OF U.G DRAIN AT VIVEK PARK, BIDHAN PALLY DHAPAR MATH SURROUNDING, ATABAGAN- BLOCK A, B AND D, GOSTOTALA NEW SCHEME AND BOSE PARA IN WARD NO-111.
MAINTENANCE OF DRAINAGE SYSTEM BY DESILTING OF CATCH-PIT, PIT, GULLY-PIT AT TILJALA ROAD, ABHINASH CHOWDHURY LANE, MAHENDRA ROY LANE AND ITS SURROUNDINGS IN WARD NO. 59
DESILTING OF UNDER GROUND SEWER LINE AT DIFFERNT LOCATION OF SANJEEV PALLY AND BANK COLONY , UNDER PART NO 189 OF 154 - BEHALA PASCHIM A.C. IN WARD NO 128.
REPAIRING AND DESILTING OFDRAINS IN B ROAD KOLABAGAN TO RESOLVE WATER LOGGING ISSUE IN THE AREA UNDER WARD NO. 07 OF HOWRAH MUNICIPAL CORPORATION (UID no - HWH 135 )
DESILTING OF UNDER GROUND SEWER LINE AT 184 P2 L.N. MOTILAL ROADS AND SURROUNDING AREA, UNDER PART NO 184 OF 154 - BEHALA PASCHIM A.C. IN WARD NO 128.
DESILTING OF SURFACE DRAIN STARTING FROM 1 BELGACHIYA ROAD PANCHANANTALA TO 232/18/2 CHAKPARA PACHA KHAL BAZAR UNDER WARD NO 35 OF BALLY MUNICIPALITY FOR 180 DAYS
DESILTING WORK OF DRAINS AT 2,5 ETC WEST ROW, 214/2,216 ETC A.J.C BOSE ROAD,19,22 ETC BRIGHT STREET AND ITS SURROUNDINGS IN WARD 064, UNDER BR-VII
MAINTENANCE OF SEWERAGE SYSTEM ALONG WITH DESILTING AT PREMISES 36/3, 41, 32 PGM SHAH ETC. IN WARD -094, BR. -X, (SCHEME ID. - APAS/01/152/23/0003)
MAINTENANCE OF DRAINAGE SYSTEM BY DESILTING OF CATCH PIT, PIT, GULLY PIT AT BROAD STREET, BRIGHT STREET, TILJALA MASJID BARI LANE AND ITS SURROUNDINGS IN WARD NO. 65
Desilting of high drain from 33, B.L. Roy Road to 56, Fakir Bagan Lane and 57, Fakir Bagan Lane to 40, B.L. Roy Road under ward no. 15.
Desilting of high drain from 33, B.L. Roy Road to 56, Fakir Bagan Lane and 57, Fakir Bagan Lane to 40, B.L. Roy Road under ward no. 15.
Emergent Temporary Restorative works of Thokchu Relly Source, Drainage Channel Silting Chamber and Desilting Tank ,At (Block ll, Santook GP), Kalimpong. Rain -Damage 1st. and 2nd. August 2023
DESILTING OF DRAIN WITH ALLIED WORK FROM PATULI POLICE STATION TO GOLD SMITH CIRCUS GROUND GARIA SREELEATHERS PNB BUILDING LANE AND SURRONDING AREA IN WARD NO 110 BR XI
Revival of 1550 mm dia. fully choked MS suction main 1 of RWPS-I by desilting and other ancillary works from pump house wall to boundary wall under GRWW.
DESILTING OF SURFACE DRAIN STARTING FROM 12/1 NO BHUJANGA DHAR ROAD TO 7/9 NO NUTAN PARA ROAD UNDER WARD NO 29 OF BALLY MUNICIPALITY FOR 180 DAYS
DESILTING OF HIGH DRAIN STARTING FROM SHIBU CHAKRABORTY LANE TO AKSHAY DUTTA LANE VIA G T ROAD UNDER WARD NO 5 AND 7 OF BALLY MUNICIPALITY FOR 180 DAYS
DESILTING OF UNDERGROUND DRAIN STARTING FROM MOHANLAL BAHALWALA ROAD TO GHOSHES LANE VIA DHARMATALA ROAD UNDER WARD NO 10 11 9 AND 8 OF BALLY MUNICIPALITY FOR 180 DAYS
MAINTENANCE OF COVERED SURFACE DRAIN BY DESILTING FROM THE JUNCTION OF DUMAYNE AVENUE TO SUBHAS BHAVAN (BOTH SIDE) AND ITS ADJOINING AREAS ALONG C.G.R. ROAD IN WARD NO - 80.
Day to day and preventive maintenance, guarding round the clock at Rammam Intake and Forebay and cleaning of desilting basin at Rammam Intake under Rammam Hydel Project Stage- II
Desilting of high drain starting from B.B. Ghosh Lane to Bidhan Polli as know as HIT drain under ward no 9 and 11 of Bally Municipality (For 180 days)
Laying HDPE Pipeline, Desilting of Sewer Line AND yearly maintenance of Pump set along with Pump House at Sadua Para AND Nona Para Pump House under Ward No. 09.
Day to day and preventive maintenance, guarding rounding the clock at Rammam Intake and Forebay and cleaning of desilting basin at Rammam Intake under Rammam Hydel Project, Stage-II
DESILTING OF BOX DRAIN AND OPEN SURFACE DRAIN FROM J-236 ROYPARA LANE TO J-565 AJAR MOLLA BAGAN LANE AND SURROUNDING AREA IN WARD NO-133, BR-XV.
Desilting the sump pit and repairing overhauling, servecing, reinstallation, two no 15 HP non- clog type submersible pumps and some allied works in Gouribari lifting station at circular canel.
DESILTING OF DRAINAGE INCLUDING REPAIRING OF U/G SEWER LINE AT R. K. SARANI NEAR FIVE STAR CLUB, L.I.C QTR. MORE ETC. IN WARD NO.-129.(PART NO.-132)
MAINTENANCE OF UTTARAN SEWER LINE BY DESILTING AT 82 DR.SUDHIR BOSE ROAD 1E/H/2,H/3,H/4 IBRAHIM ROAD AND ITS SURROUNDING AREA IN WARD NO-77
DESILTING and MAINTENANCE OF COVERED SURFACE DRAIN ALONG NORTHERN FLANK OF S.N. CHATTERJEE LANE NEAR PR. NO. 31/N/1, 5 and 10/8 ETC. IN WARD NO. 130
Desilting the sump pit and repairing overhauling, servecing, reinstallation, two no 15 HP non- clog type submersible pumps and some allied works in Rajabazar lifting station at circular canel.
Desilting the sump pit and repairing overhauling, servicing, reinstallation, two no 15 HP non- clog type submersible pumps and some allied works in Maniktala lifting station at circular canal.
Desilting of surface drain (Civil High Drain) From G.T.Road.(Liluah Bodo Gate) via Railway Colony upto Mathwala Pumping Station, at ward no 62, Bally Sub-Office. (O and M)
MAINTENANCE OF COVERED SURFACE DRAIN BY DESILTING FROM THE JUNCTION OF DUMAYNE AVENUE TO SUBHAS BHAVAN (BOTH SIDE) AND ITS ADJOINING AREAS ALONG C.G.R ROAD IN WARD NO - 80.
DESILTING, REMOVAL OF CHOCKAGE INCLUDING CONNECTION OF MANHOLE AND CATCHPITH OF U/G SEWER LINE AT B.L.T ROAD BYE LANE, SAGAR MANNA ROAD BYE LANE ETC. IN WARD NO.-132
DESILTING OF OPEN SURFACE DRAIN NEAR 19/1,19/2 ETC. MUNSHIGANJ RD., 2/6D NITYA GHOSH ST., (ADJOINING AREA OF KALIMANDIR, FOR WATGUNGE TREATMENT PLANT, SAHEBPUKUR) IN WARD NO. 75 .
DESILTING OF SURFACE DRAIN AND OTHER ALLIED WORKS AT ATALSUR ROAD, CHRISTOPHER ROAD, SEAL LANE, NEW TANGRA ROAD AND ARUPOTA ROAD ETC AND ITS SURROUNDING AREA IN WARD NO 58
Desilting of Intake well by bailing out water slurry (sand, silt, gravels etc.) at Fulbari Intake Pumping Station of Siliguri Comprehensive Water Supply Scheme, under Northern Mechanical Division., PHE Dte
Desilting of drain thoroughly with construction of drain both side from 80 to 85 Sambhu Halder Lane and134 to 135/1, Sree Ram Dhang Road under Ward no -5,HMC
MAINTENANCE OF SEWERAGE SYSTEM ALONG WITH DESILTING AT 62/39, 62/15 AND 62/64 HARIPADA DUTTA ETC. IN WARD -94 ,BR-X. (SCHEME ID. - APAS/01/152/26/0001)
One time Cleaning of water hyacinth,jungles,weeds,etc. and Partial Desilting of Padmabil from Jhawtala Road to Kalyani Expressway in Ward no-26,27within Bhatpara Municipal area,24 pgs.(North)
Desilting of Intake well by bailing out water slurry (sand, silt, gravels etc.) at Fulbari Intake Pumping Station of Siliguri Comprehensive Water Supply Scheme, under Northern Mechanical Division., PHE Dte.
Desilting of Intake well by bailing out water slurry sand, silt, gravels etc. at Fulbari Intake Pumping Station of Siliguri Comprehensive Water Supply Scheme, under Northern Mechanical Division., PHE Dte.
DESILTING OF FOUR (4) NO. PONDS, CONSTRUCTION OF GRIT CHAMBER, CONSTRUCTION OF PATHWAY, CUTTING OF JUNGLES, CONSTRUCTION OF BOUNDARY WALL AND OTHER ALLIED CIVIL WORKS AT BAGHAJATIN SEWAGE TREATMENT PLANT.
DESILTING OF HIGH DRAIN STARTING FROM SATISH CHAKRABORTY LANE TO BIRESWAR CHATTERJEE STREET VIA PADMABABU ROAD UNDER WARD NO 6 4 3 AND 1 OF BALLY MUNICIPALITY FOR 180 DAYS
MENDING OF EXISTING DRAINAGE SYSTEM INCLUDING DESILTING NEAR PREMISES NO- 5B/1,5C/2/, 7/2 TELIPARA LANE ETC IN WARD-092, BR-X. (SCHEME ID -APAS/01/149/201/0001)
DESILTING OF HIGH DRAIN STARTING FROM B B GHOSH LANE TO BIDHAN POLLI AS KNOWN AS HIT DRAIN UNDER WARD NO 9 AND 11 OF BALLY MUNICIPALITY FOR 180 DAYS
DESILTING INCLUDING REPAIRING OF U/G SEWER IN THE UNIQUE PARK AREA NEAR PR. NO. P-2, P-315 AND 14/318 ETC. IN WARD NO. 130 (PART NO. 176)
Desilting of Intake well by bailing out water slurry (sand, silt, gravels etc.) at Fulbari Intake Pumping Station of Siliguri Comprehensive Water Supply Scheme, under Northern Mechanical Division., PHE Dte.
MAINTENANCE OF UTTARAN SEWER LINE BY DESILTING AT 17/H/2,17/H/3,17/C,18/H/2,18/H/7, M.M. MALI ROAD AND ITS SURROUNDING AREA IN WARD NO-77