Loading…
Loading…
1,350 results • Best match
Survey, Design Drawing DPR Preparation for NEW PWSS (KAUGACHHI ZONE-III Water Supply Scheme) in BARRACKPUR-I BLOCK under N 24 Pgs W/S Div-I, PHE Dte.
Laying of additional pipe line to be laid the scope of DPR in the command area at Khowaspur Piped Water Supply Scheme under Islampur Sub-Division P.H.E. Dte.
Preparation and Submission of DPR along with pipeline Layout Plan_Hy. Design etc. in compliance to JJM guideline for Proposed Jot Kanuramgar PWSS Block_Daspur_II under Midnapore Division PHE Dte.
Preparation of Details Project Report (DPR) incl. route survey in connection with augmentation of Buraganj Jatur Piped water supply scheme under Kharibari block Siliguri Sub Division, PHE Dte.
Hiring of Consultants - Milestone/Deliverable Based - Consultancy Services for Soil Investigation, Structural, Electrical, Mechanical, External Services, Detailed estimate, DPR and GRIHA Certification; Consultancy Services for Soil Investigation, Str..
Survey, Design Drawing DPR Preparation for NEW PWSS (KAUGACHHI ZONE-I Water Supply Scheme) in BARRACKPUR-I BLOCK under N 24 Pgs W/S Div-I, PHE Dte.
Preparation of Details Project Report (DPR) incl. route survey in connection with augmentation of Sona Chandi Piped water supply scheme under Kharibari block Siliguri Sub Division, PHE Dte.
Preparation of Details Project Report (DPR) incl. route survey in connection with augmentation of Arjun Mahal Piped water supply scheme under Kharibari block Siliguri Sub Division, PHE Dte
Laying of additional pipe line to be laid the scope of DPR in the command area at Butijhari Piped Water Supply Scheme under Islampur Sub-Division P.H.E. Dte.
Preparation of Details Project Report (DPR) incl. route survey in connection with augmentation of Uttar Ramadhan Piped water supply scheme under Kharibari block Siliguri Sub Division, PHE Dte.
INSTALLATION OF 5 NOS. SOLAR STW UNDER G I AND KARANDIGHI BLOCK UNDER PARAY SAMADHAN PROGRAMME UID NO. UDJ 027 AND UDJ 118 REF DPR 14 3 3
Preparation and Submission of DPR along with pipeline Layout Plan_Hy. Design etc. in compliance to JJM guideline for Proposed Radhakantapur PWSS Block_ Daspur_I under Midnapore Division PHE Dte.
Laying of additional pipe line to be laid the scope of DPR in the command area at Amalbari Piped Water Supply Scheme under Islampur Sub-Division P.H.E. Dte.
Survey, Design Drawing DPR Preparation for NEW PWSS (KAUGACHHI ZONE-II Water Supply Scheme) in BARRACKPUR-I BLOCK under N 24 Pgs W/S Div-I, PHE Dte.
Preparation and Submission of DPR along with pipeline Layout Plan_Hy. Design etc. in compliance to JJM guideline for Proposed Shila Rajnagar PWSS Block_Ghatal under Midnapore Division PHE Dte.
Preparation and Submission of DPR along with pipeline Layout Plan_Hy. Design etc. in compliance to JJM guideline for Proposed Borai PWSS Block_ Mohanpur under Midnapore Division PHE Dte.
Preparation and Submission of DPR along with pipeline Layout Plan_Hy. Design etc. in compliance to JJM guideline for Proposed Tatarpur PWSS Block_ Daspur_I under Midnapore Division PHE Dte.
Laying of additional pipe line to be laid the scope of DPR in the command area at Purba Chutiakhore Water Supply Scheme under Islampur Sub-Division, P.H.E. Dte.
Preparation of Details Project Report (DPR) incl. route survey in connection with augmentation of Chuchur Muchur Piped water supply scheme under Kharibari block Siliguri Sub Division, PHE Dte.
Preparation of Details Project Report (DPR) incl. route survey in connection with augmentation of Bagulahagi Bhattagachh Piped water supply scheme under Kharibari block Siliguri Sub Division, PHE Dte.
Preparation and Submission of DPR along with pipeline Layout Plan_Hy. Design etc. in compliance to JJM guideline for Proposed Maharajpur PWSS Block_ Ghatal under Midnapore Division PHE Dte.
Preparation of Augmentation DPR of Intake, Rising Main, WTP, Boosting Station of Surface Water Based Water Supply Project under North 24 Parganas Water Supply Division 1, PHE. Dte.
Preparation of Detail Project Report (DPR) for Burdwan-Katwa Road to Burdwan-Suri Road via Palitpur from Ch. 0.00 Km. to Ch. 5.15 Km.- Widening and Strengthening work.
Hiring of Consultants - Milestone/Deliverable Based - complete soil investigation, Architectural, structural, Electrical, Mechanical, Pluming, Drainage, Fire Fighting, HVAC, ELV, External Services, MEP engineering and GRIHA certification; DPR, RFP Pre..
Preparation of Details Project Report (DPR) incl. route survey in connection with augmentation of Uttar Bansgaon Kismat Piped water supply scheme under Phansidewa block Siliguri Sub Division, PHE Dte.
Preparation of Details Project Report (DPR) incl. route survey in connection with augmentation of Gangaram Tea Garden Piped water supply scheme under Phansidewa block Siliguri Sub Division, PHE Dte.
Preparation of Details Project Report (DPR) incl. route survey in connection with augmentation of Trihana Tea Garden Piped water supply scheme under Naxalbari block Siliguri Sub Division, PHE Dte.
Preparation of Details Project Report (DPR) incl. route survey in connection with augmentation of Hansqua Tea Garden Piped water supply scheme under Phansidewa block Siliguri Sub Division, PHE Dte.
Preparation and Submission of DPR along with pipeline Layout Plan_Hy. Design etc. in compliance to JJM guideline for Proposed Kuran and Kushman PWSSs Block_Ghatal under Midnapore Division PHE Dte.
Preparation and Submission of DPR along with pipeline Layout Plan_Hy. Design etc. in compliance to JJM guideline for Proposed Bandipur and Dhanyagachhi PWSS Block_Chandrakona_II under Midnapore Division PHE Dte.
Preparation and Submission of DPR along with pipeline Layout Plan_Hy. Design etc. in compliance to JJM guideline for Proposed Hrisingpur and Dhunrabila PWSS Block_Chandrakona_II under Midnapore Division PHE Dte.
Preparation and Submission of DPR along with pipeline Layout Plan_Hy. Design etc. in compliance to JJM guideline for Proposed Gohaldanga_ Pirchak_ Dwarkhola PWSS Block_Chandrakona_I under Midnapore Division PHE Dte.
Preparation and Submission of DPR along with pipeline Layout Plan_Hy. Design etc. in compliance to JJM guideline for Proposed Gopmahal urf Monaharpur PWSS Block_Ghatal under Midnapore Division PHE Dte.
Preparation and Submission of DPR along with pipeline Layout Plan_Hy. Design etc. in compliance to JJM guideline for Proposed Bar Kashimpur PWSS Block_ Daspur_I under Midnapore Division PHE Dte.
Preparation and Submission of DPR along with pipeline Layout Plan_Hy. Design etc. in compliance to JJM guideline for Proposed Dhuipara and Nilda PWSS Block_ Mohanpur under Midnapore Division PHE Dte.
Preparation of Details Project Report (DPR) incl. route survey in connection with augmentation of Ord Terai Tea Garden Piped water supply scheme under Naxalbari block Siliguri Sub Division, PHE Dte.
Preparation of Detail Project Report (DPR) for proposed strengthening work of Burdwan Kalna Road from 10.00 Kmp to 27.00 Kmp, under Burdwan Division, P.W.D in the district of Purba Bardhaman..
Preparation of Details Project Report (DPR) incl. route survey in connection with proposed Khoklong Piped water supply schemes at the uncovered mouzas under Matigara Block of Siliguri Sub Division, PHE Dte.
Preparation of Details Project Report (DPR) incl. route survey in connection with proposed Nichitpur Piped water supply schemes at the uncovered mouzas under Matigara Block of Siliguri Sub Division, PHE Dte.
CONSTRUCTION OF FILTRATION CHAMBER AND SIT CATCHER CHAMBER AT NOWPARA IMIS VILLAGE NEAR NOWPARA MOSJID FOR MANAGE GREY WATER (Additional DPR Phase-2) under Nowpara-1 GP. Under SBM(G) Fund.
Preparation and Submission of DPR along with pipeline Layout Plan_Hy. Design etc. in compliance to JJM guideline for Proposed Shrirampur and 5 nos. others PWSSs Block_Ghatal under Midnapore Division PHE Dte.
Hiring of Consultants - Milestone/Deliverable Based - Consultancy Services for Construction and development of infrastructure works at SHQ SSB Gangtok Sikkim; Architect - Data, Project Management, DPR, RFP Preparation & Bid Process Management, Enginee..
Preparation of Details Project Report (DPR) incl. route survey in connection with augmentation of Porjhar Piped water supply scheme under Rajganj block , Jalpaiguri District under Siliguri W/S Division, PHE Dte.
Hiring of Consultants - Milestone/Deliverable Based - 3D Walkthrough of the Building from Architectural & Structural Drawings; Architect -Software Solution, DPR, RFP Preparation & Bid Process Management; No; Hybrid(As specified in scope of work)
Preparation of Detail Project Report (DPR) for proposed widening and strengthening work of Uchalan- Eklakhi Road from 0.00 Kmp to 6.00 Kmp, under Burdwan Division, P.W.D in the district of Purba Bardhaman.
Preparation and submission of DPR of Purulia Ranchi Road from 17.50 Km to 57.20 Km, Strengthening Work under Purulia Sub Division within Purulia Division, PWD in the District of Purulia (2nd Call)..
Hiring of Consultants - Milestone/Deliverable Based - Management Consultants, Owners Engineering and Project Management Consultancy as per bid document; Project Management, DPR, RFP Preparation & Bid Process Management; No; Hybrid(As specified in sco..
Hiring of Consultants - Milestone/Deliverable Based - Structural Design, Soil Investigation and Estimate Abstrack & Yardstick including BoQ and Current Market Rate Analysis; DPR, RFP Preparation & Bid Process Management; No; Hybrid(As specified in sco..
Expression Of Interest (EOI) for DPR (Drawing, Design , BOQ etc) of Architectural Consultancy of Proposed Bus Terminus (Basement plus 4 storey) with allied facilities considering 4 rated Green Building concept within Purulia Municipality
DETAIL ROUTE SURVEY, DESIGN OF DISTRIBUTION NETWORK AND PREPARATION OF ESTIMATE, DRAWING AND DPR FOR PROVIDING FHTC IN ARABPUR, BETAI ZONE II, NATHNA ZONE II, ANDHERKOTA, KARIMPUR JALANGI ZONE VIII W/S SCHEME.