Loading…
Loading…
1,348 results • Best match
PREPARATION OF DPR WITH SURVEY , DRAWING AND DESIGN FOR BRIDGES BEING UNDER TAKEN UNDER PMGSY-III FUND WITHIN VARIOUS BLOCKS IN THE DISTRICT OF UTTAR DINAJPUR.
Preparation of DPR for Ghatal, Pingla and Sabong Block under PMGSY III Batch II of 2023 2024 in the jurisdiction of WBSRDA, Paschim Medinipur Division II
Preparation of DPR after investigation for Dakshin Rangalibazna, Uttar Rangalibazna, Ballalguri and Garochira Bandapani Piped Water Supply Scheme under Madarihat-Birpara Block, Alipurduar Division, PHE Dte
Preparation of DPR for Kharagpur -I, Kharagpur-II, Keshiary Blocks under PMGSY-III 2023-24 (Batch-II) in the jurisdiction of WBSRDA, Paschim Medinipur Division-I.
Preparation of DPR for roads in different Blocks under WBSRDA, Murshidabad Division.
Selection of Consultants for drawing up a Detailed Project Report (DPR) and Project Management Consultancy (PMC) for the Restoration and Revamping of existing Firefighting System at NCSM premises, Bidhan Nagar, Kolkata
Selection of Consultants for Preparation of Feasibility Report for development of ICP Haldibari
Preparation of DPR for roads under PMGSY III, 2023-24, Batch - II
Preparation and submission of Detailed Project Report (DPR), drawing, design, BOQ etc. in connection with the Fire Fighting System at Santoshpur Industrial Park, South 24 Parganas. (16.89 acres)
Comprehensive assessment of existing Drainage Infrastructure, Topographical Survey, and Preparation of a Detailed Project Report (DPR) for Remedial Measures to Mitigate Water Logging at Behala Industrial Park under WBSIDCL.
Preparation of DPR after investigation for Tasti Tea Garden, Dalgaon Tea Garden and Dalmoney Tea Garden Piped Water Supply Scheme under Falakata Block, Alipurduar Division, PHE Dte.
Preparation of DPR for end treatment of Grey Water in 86 villages on sides of Gobrakhal/ Gobranala connected to river Ganga in Murshidabad district from West Bengal
PREPARATION OF DPR WITH SURVEY, DRAWING AND DESIGN FOR BRIDGES BEING UNDER TAKEN UNDER PMGSY III FUND WITHIN GARHBETA III BLOCK IN THE DISTRICT OF PASCHIM MEDINIPUR
Preparation of DPR for construction of Bridge Halda alongwith Topographical survey, Hydrographical Survey and Geotechnical Investigation within Debra block under jurisdiction of WBSRDA Paschim Medinipur Division I
EOI for the preparation of DPR for construction of new Bridge under Rural Connectivity under the jurisdiction of WBSRDA, Jalpaiguri Division in the Jalpaiguri District (2ND CALL)
Consultancy Service for preparation of DPR, for construction of Walk-in Aviary with Skywalk at Deer Park, Dowhill Satellite Zoo under Padmaja Naidu Himalayan Zoological Park, Darjeeling.
Preparation and submission of Detailed Project Report (DPR), drawing, design, BOQ etc. in connection with the Fire Fighting System at Kalyani Industrial Park, Phase-I,Dist Nadia(35.00 acres)
Preparation and submission of Detailed Project Report (DPR), drawing, design, BOQ etc. in connection with the Fire Fighting System at Dabgram Industrial Park, Phase-I Dist. Derjeeling.(24.50 acres)
Providing Consultancy Services for preparation of Detailed Project Report D.P.R for the 4 Nos. of works of Jhargram District as mentioned in Annexure-I
Consultancy Services for preparation of Detailed Project Report D.P.R for the 7 Nos. of works approx. Length 43.19 KM of Jhargram District as mentioned in Annexure-I
Online Notice Inviting Quotation for Supply of different type Furniture from Godrej or similar make in proposed District Office in Darjeeling District under WBKVIB for Preparation of DPR during the year 2025 26
Engagement of Consultancy Services for Feasibility Study Detailed Master Planning Urban Designing Engineering And Preparation of Detailed Project Report DPR for Integrated Re Development of NEW JALPAIGURI and ALIPURDUAR JN Railway Stations of N F Railway and SINGRAULI Station of E C Railway
Providing Consultancy Services for preparation of Detailed Project Report D.P.R for the 2 Nos. of works of Paschim Medinipur District as mentioned in Annexure-I.
Consultancy Services to carry out the feasibility study and preparation of detailed project report for construction of culverts and Fencing between B.P. No. 219/40-R to 213/6-S (28.305 Km) at Malda District of West Bengal along Indo-Bangladesh Border ... the feasibility study and ... of detailed project report for ...
Preparation and submission of Detailed Project Report (DPR), drawing, design, BOQ etc. in connection with the Fire Fighting System at- Siliguri Industrial Park, Dist. Derjeeling. (21.57 acres) 3rd Call.
PREPARATION OF DPR WITH SURVEY, DRAWING AND DESIGN FOR BRIDGES BEING UNDER TAKEN UNDER PMGSY III FUND WITHIN PINGLA AND GHATAL BLOCKS IN THE DISTRICT OF PASCHIM MEDINIPUR
E.O.I. invited for engagement of consultancy service for Preparation of DPR for construction of cottage complex alongwith other ancillary works at Permanent Picnic Spot, New Digha under DSDA
Preparation of DPR for Keshpur Block under PMGSY-III 2023-24 (Batch-II) in the jurisdiction of WBSRDA, Paschim Medinipur Division-I. N-03 2023-24 SL04_2nd Call
Preparation of DPR for the work construction of four storied residential building accommodating 8nos families at 9th Mile Bus and Car Park near Novelty Cinema hall Kalimpong GTA
Preparation of DPR for Rural Road schemes within various blocks in the district of Purba Bardhaman towards inclusion of the scheme under PMGSY-III 2023-24 (Batch-II).
Consultancy services for carrying out feasibility study and preparation of Detailed Project Report and Pre-construction activities for alternate highway of existing highway (NH-110) from Siliguri to Darjeeling in the state of West Bengal
Consultancy Service for preparation of DPR for comprehensive Firefighting System at North Bengal Dental College AND Hospital Building, Sushrutanagar in the district of Darjeeling
Feasibility study for Grey Water Management in 97 big villages along Ganga River in West Bengal
Preparation of a Detailed project report for the work of Construction of Circular Road of Intermediate lane Carraigeway from Lebong Bazar to 3rd Mile Peshok Road via Rangeroon Tea Estate in the district of Darjeeling Hill road.
Providing Consultancy Services for preparation of Detailed Project Report for the 2 Nos. of works approx. Length 13.50 KM of Jhargram District as mentioned in Annexure-I.
Preparation of DPR of Roads under PMGSY for Jangipur Division in Murshidabad District.
Open tender for Conducting feasibility study Investigation, Detailed Survey with Total Station/DCPS, marking of approval alignment, Soil investigation, Preparation of GAD and submission of DPR for Construction of ROB/RUB under Asansol Division.
Consultancy Services for Preparation of Detailed Project Report for proposed Widening and Strengthening work of Chapra-Hridoypur road from 0.00 Kmp to 12.570 Km under Nadia Division, P.W.D. in the district of Nadia under CRIF Scheme
Providing Consultancy Services for preparation of Detailed Project Report D.P.R for the 3 Nos. of works approx. Length 28.4 KM of Birbhum District as mentioned in Annexure-I
Providing Consultancy Services for preparation of Detailed Project Report for the 2 Nos. of works approx. Length 16.20 KM of Paschim Medinipur District as mentioned in Annexure-I
Providing Consultancy Services for preparation of Detailed Project Report D.P.R for the 6 Nos. of works approx. Length 32.33 KM of Jhargram District as mentioned in Annexure-I
Providing Consultancy Services for preparation of Detailed Project Report D.P.R for the 5 Nos. of works approx. Length 36 KM) of Bankura District as mentioned in Annexure-I
Selection of consultant for preparation of Detailed Project Report of fish Aquarium of Zoological Garden, Alipore.
Preparation of DPR for Construction of Bridge on Un-bridge Gap over PMGSY Road namely Bhuri to Masjidpur Road within Galsi-II Block, Pkg No. WB-22-BRI-08
NOTICE INVITING PRE-QUALIFICATION - CUM - TENDER (TWO COVER SYSTEM) FOR PREPARATION OF DPR THROUGH OUTSOURCING FOR INFRASTRUCTUARAL DEVELOPMENT OF SCHOOLS UNDER RIDF-XXXI IN 23 EDUCATIONAL DISTRICTS (EXCEPT KOLKATA)
Route Survey and Preparation of DPR for Augmentation of Churulia Piped Water Supply Scheme. Augmentation of Churulia Piped water supply scheme including providing FHTC Block Jmuria, District-Paschim Bardhaman.
Preparation of DPR for Construction of Bridge on Un-bridge Gap over PMGSY Road namely Khatundi to Chitahati Road within Ketugram-II Block, Pkg No. WB-22-BRI-09
Route Survey and Preparation of DPR for Augmentation of Kajora Piped Water Supply Scheme. Augmentation of Kajora Piped Water Supply Scheme including Providing FHTC Block Andal District- Paschim Bardhaman.
E.O.I. invited for engagement of consultancy service for Preparation of DPR for development of Water-Park at the southern side of BSNL Telephone Exchange Complex, New Digha under DSDA
Preparation of DPR for Garbeta I, Garbeta II and Garbeta III Block under PMGSY III Batch II of 2023 2024 in the jurisdiction of WBSRDA, Paschim Medinipur Division II