Loading…
Loading…
7,257 live4,027 closing this weekmost from Directorate of Local Bodies UP and Directorate Urban Administration and Development
7,257 results • Best match
Construction work of CC road and RCC drain in Ward No. 13 under Nagar Palika Parishad Suar, from the corner of Jawahar School to Abdul Majeed house.
Construction of RCC drain from Rajesh Gupta plot to the gate of the New Vegetable Market Navin Sabzi Mandi in Ward No. 12 Veer Abdul Hamid Nagar.
Construction of a drain and slab in Mohalla Pathanpura 01 and Ward 02, along Hamirpur Road from Hind Angels School towards Sai Mandir (on the left side).
Construction of C.C Drain Mohalla Shekhan ward No 10 H/o Mujeeb to H/o Naim and H/o Zameer to H/o Bolar Length 245 Mt
Providing parapet wall for protection of muck of spoil bank along right side of drain of NHC at various RDs under Nangal Dam Sub Division, BBMB Nangal
Development Of Lane/Drain from House Of Ali Mohd Khan To House Of Fayaz Ahmad Sofi and Others with Iron Mesh Phase 3rd at Kantbagh Kralpora C
Laying of 180 mm dia UPVC main line damaged during treeh cutting to drain out of flood water of Krishnapur PWSS under RCFA Division-I PHE Dte.
Improvemet work of road and drain from House No343 Manoj Kumar To house No.519 Vinod Kumar Tiwari in Awas Vikash Sector 3C Ward 41 Under Zone02
CONSTRUCTION CONCRETE DRAIN WITH SOAK PIT FROM NADUNI GORE TO GHOSH PUKUR AT KALAIJHUTI UNDER ERAL GP OUT OF THE FUND 15TH CFC 2025-26 (ID-112152524)
Construction work of road and drain from Mukesh Singhs house Arazi No. to Ajays house Arazi No. near Jakhai Baba Temple under Zone 06 Ward 27 Nankari.
Construction of CC road and drain near H/o Shri Ghanshiyam to H/o Shri Be-Dil and adjoining lane, in ward no-12,Lawar,Distt-Meerut.
Footpath and drain improvement work from Arvind Singhs house number 105 to Devendra and Company Traders in New Civil Lines under Zone 06 Ward 52 Geeta Nagar.
Const. of Drain / Passage and P/F Ladi at G-Ward No. 1, Near Sai Mandir, Near Municipal School, Municipal Colony, Santosh Nagar, Malad (E) (2nd Call)
CONSTRUCTION OF CC ROAD AND DRAIN WORK AT WARD 02 GAJENDRA FOJI HOUSE TO RAGHVENDRA SHARMA HOUSE TOWARDS SHRI RAJESH FOJI HOUSE MUNICIPAL COUNCIL AMBAH DIST MORENA
RRD Saleti to Bhindla road Km. 0/0 to 2/820 (SH C/o U-shape drain from RD 2/612 to 2/648)Under PDNA.2023
Renovation of U/G drain and P.C.C. Road work from Shiv Mandir Gali Kalu Paswan ji house to tun tun Singh ji house in ward no-04.
Construction of RCC drain and CC road from Ward No. 60, Mohammed Ajmeri Gate, Akashvani Road, from Dr. Ghulam Sabir house via Qasim to Haji Sahajad house.
GENERALFDR 2025 26 Reconstruction of culvert and connected drain at ch1300 of old NH Construction of box culvert at ch 1300 at CherthalaGeneral Civil Work Re tende
Const. of Drain / Passage and P/F Ladi at Shree Saraswati Chawl Committee and Siddhivinayak Chawl Committee, Maharani Saibai Nagar, Appapada, Jadhav Compound, Malad (E) (2nd Call)
Construction work of PCC road and RCC drain from Maruti Dharm Kanta on Lalapur Road to near by Maha Dalit Basti under the Nagar Panchayat Kudra area.
Construction of RCC Drain and PCC road from child jail to kana sah shop and Different location and links road in ward no. 29 under DMC Dhanbad
Construction Of Pcc Road and Rcc Drain Rahmat Nager zamij shab house to and bhulo je House imran shab house and Thohide shab in Ward No-34
Construction of CC road from Shop No. 159A to M.No.-C/222 and CC road and drain from M.No.-156 to A.K. Dhal in Ward-88, Turabnagar.
Construction of CC road and drain on the service road from HQ B-41 to B-37 via B-46 in Ward-69, Lohia Nagar B-Block.
Improvement work of road from Siddheshwar Balaji Temple to the house of Shivam Chauhan (Street No. 07) in Ward 02 Siddharth Bihar by interlocking tiles and drain.
Road construction work through interlocking tiles and drain from Sunita house to Javed Hair Cutting and in the subsidiary lane in Ward 35 Akbarpur Bahrampur Buddha Vihar.
Construction of road with drain and interlocking tiles from Munna Lal to Ashok, Harveer to Gaurav and Sonu General Store to Dayanand house in Ward 58 Shivpuri.
Construction of RCC drain from D-147 to D-180 (up to the cut in front of Golden Public School) in Ward 55, Pratap Vihar Sector 11.
Improvement work of drain and CC from Janak Mishra to Bhupendra Gupta and from Bhupendra Gupta to Mahak General Store in Buddha Vihar in Ward-72 Vaishali.
In Ward-42 Bamheta, work of drain and interlocking tiles from Balu house to Baleshwar house via Ravi Goswami house, from Neetu house to Manoj Yadav house.
Ward 05 Gagan Vihar Gali No. 18 B Block Construction work of drain and CC in the damaged lane from Gyan Singh Tomar house to Indra house.
Repair work by drain and CC in the damaged lane from Rekha Jha house to Tara Padint house in B-block of Ward-34 Shahid Nagar I.
Repair work of drain and CC in the damaged lane from temple to SBI Bank and from Dhama Niwas to Theke in Kailash Park, Ward 38, Arthala.
In ward 34 Shaheed Nagar I, from Ilyas Kabadi to Mohd. Naeem and from Nazir to Naseem, repair work of damaged lane by laying drain and C.C.
Repair work by drain and CC in the damaged street from Pawan Chauhan house and Virendra house to Janardan house in Ward-44 Sanjay Colony Balaji Vihar.
Construction of interlocking tiles and repair of drain on the side track from Shri Sharma Hotel to Tyre Market via Taj Chicken on Patel Marg, Ward-19.
In Ward-34 Shaheednagar I, repair work of damaged lane from Ajju Tent House to Naresh and from Councillor office to school by constructing drain and CC.
Ward-59, Old City Chowpla Temple Pakka Mori, Mahadev Pooja Ghar and Kansal Brothers Nishant Dairy Center and Balaji Jewel near CC road and drain construction work.
Construction of CC road and drain from Satyaprakash house to Mahesh Sharma house and from Sanjay Tyagi to Mukhtiyare near PNB Bank in Ward-50, Noor Nagar.
Construction work of drain and CC in the damaged lane of Ayesha Masjid and damaged lane of Movie Palace Lane No. 02 in Ward 82 Jawahar Park.
Construction of CC Road and Drain from the House of Banti Kushwah to the House of Ramratan in Ward No. 12. Under Municipal Council Mau distt. Bhind
Construction work involving interlocking paving, an RCC drain, and a cover from Mamta Anganwadi house to Anurag Mishra house, and from Sagar Yadav house to Mukesh house.
Construction work involving interlocking tiles, a CC road, and an RCC drain with a cover, extending from Baburam Nishad house to Shivnarayan house and Daya Prajapati house.
Construction of Concrete Covered Drain with soak pit from House of Sajahan Molla towards Masjit at Sansad 18,15TH Tied. Activity ID - 109179767. AAP No. 40 (2025-26)
SPL REPAIR TO DRAIN AND BOUNDARY WALL AT SALARIA ENCLAVE, DWARKA AND PROVN OF ENTRY GATE SHED AT SALARIA OFFICER ENCLAVE UNDER GE (WEST) DELHI CANTT-10
Improvement of side patri by interlocking tiles and Drain from Triyambhakeshwar Mandir to H/O Anshul Yadav At Y-block Kidwai Nagar in ward-66 Under Zone02
Improvement work of side track and drain by interlocking from M.No. 485 to KDA Road via Saraswati E.K. in Defenece colony Harijindra Nagar Ward 28 Under Zone02
Construction of a drain with interlocking on the Bhairupura road from Bhairupura Bairwa Basti to Dahada in Pipalda Kalan Panchayat, Pipalda village, under the MLA Fund Scheme.
Development works including construction of Asphalt Roads (18m, 12m, 9m & 7.5 m wide), RCC Drains, Culverts, Sinking of Borewell with pump installation and HDPE rising main, construction of 10 LL OHT & 5 LL Sump with Pump House, Layout Electricficaton, Compound wall, and Footpath for Dr. Qamar-ul-Islam Residential Project ( 50-50 sharing porject ) at Hagaraga Village in Kalaburagi Taluku & District.
DESILTATION OF U/G DRAINAGE SYSTEM AT SUCHETA NAGAR AND OTHER AREAS IN WARD NO.-105.