Loading…
Loading…
7,289 live4,043 closing this weekmost from Directorate of Local Bodies UP and Directorate Urban Administration and Development
7,289 results • Best match
Repair work by drain and CC in the damaged lane from Rekha Jha house to Tara Padint house in B-block of Ward-34 Shahid Nagar I.
Repair work of drain and CC in the damaged lane from temple to SBI Bank and from Dhama Niwas to Theke in Kailash Park, Ward 38, Arthala.
In ward 34 Shaheed Nagar I, from Ilyas Kabadi to Mohd. Naeem and from Nazir to Naseem, repair work of damaged lane by laying drain and C.C.
Repair work by drain and CC in the damaged street from Pawan Chauhan house and Virendra house to Janardan house in Ward-44 Sanjay Colony Balaji Vihar.
Construction of interlocking tiles and repair of drain on the side track from Shri Sharma Hotel to Tyre Market via Taj Chicken on Patel Marg, Ward-19.
In Ward-34 Shaheednagar I, repair work of damaged lane from Ajju Tent House to Naresh and from Councillor office to school by constructing drain and CC.
Ward-59, Old City Chowpla Temple Pakka Mori, Mahadev Pooja Ghar and Kansal Brothers Nishant Dairy Center and Balaji Jewel near CC road and drain construction work.
Construction of CC road and drain from Satyaprakash house to Mahesh Sharma house and from Sanjay Tyagi to Mukhtiyare near PNB Bank in Ward-50, Noor Nagar.
Construction work of drain and CC in the damaged lane of Ayesha Masjid and damaged lane of Movie Palace Lane No. 02 in Ward 82 Jawahar Park.
Construction of CC Road and Drain from the House of Banti Kushwah to the House of Ramratan in Ward No. 12. Under Municipal Council Mau distt. Bhind
Construction work involving interlocking paving, an RCC drain, and a cover from Mamta Anganwadi house to Anurag Mishra house, and from Sagar Yadav house to Mukesh house.
Construction work involving interlocking tiles, a CC road, and an RCC drain with a cover, extending from Baburam Nishad house to Shivnarayan house and Daya Prajapati house.
Construction of Concrete Covered Drain with soak pit from House of Sajahan Molla towards Masjit at Sansad 18,15TH Tied. Activity ID - 109179767. AAP No. 40 (2025-26)
SPL REPAIR TO DRAIN AND BOUNDARY WALL AT SALARIA ENCLAVE, DWARKA AND PROVN OF ENTRY GATE SHED AT SALARIA OFFICER ENCLAVE UNDER GE (WEST) DELHI CANTT-10
Improvement of side patri by interlocking tiles and Drain from Triyambhakeshwar Mandir to H/O Anshul Yadav At Y-block Kidwai Nagar in ward-66 Under Zone02
Improvement work of side track and drain by interlocking from M.No. 485 to KDA Road via Saraswati E.K. in Defenece colony Harijindra Nagar Ward 28 Under Zone02
Construction of a drain with interlocking on the Bhairupura road from Bhairupura Bairwa Basti to Dahada in Pipalda Kalan Panchayat, Pipalda village, under the MLA Fund Scheme.
Development works including construction of Asphalt Roads (18m, 12m, 9m & 7.5 m wide), RCC Drains, Culverts, Sinking of Borewell with pump installation and HDPE rising main, construction of 10 LL OHT & 5 LL Sump with Pump House, Layout Electricficaton, Compound wall, and Footpath for Dr. Qamar-ul-Islam Residential Project ( 50-50 sharing porject ) at Hagaraga Village in Kalaburagi Taluku & District.
DESILTATION OF U/G DRAINAGE SYSTEM AT SUCHETA NAGAR AND OTHER AREAS IN WARD NO.-105.
Special repair work for Construction of Drainage Line at E.S.I.S. Hospital and staff quarters at Solapur.
Construction of Drainage Pipe Crossing Syphon at km. 1.920 of Nanakpur Minor of M.G.C Stage-II.
REPAIR IMPROVEMENT OF COMPOUND WALL, GATES, DRAINAGE AND FENCING IN DOMESTIC AREA AT AF STN SIRSA
WARD NO. 08 MOHALLA SHASHTRI NAGAR PAL NAGLA ME CHEDA SHAKYA KE KHET SE RADHESHYAM KE MAKAN TAK NALA NIRMAN KARYA
Construction of RCC Nala from Pump House Jhopdi Para samudayik bhawan to syphon at Ward No. 16 Pump House (DMF Fund)
Construction of Slab Drain at Ch. 2/200 & at 2/900 & Construction of Protection Wall between Ch. 10/600 to 11/0 and Bet. Ch. 11/0 to 11/250 on Thada - Bharada - Vasadva-Dudapur Road, Tal. Dhrangadhra, Dist. Surendranagar & Construction of Slab Drain at Ch. 12/00 to 12/50 on Malvan - Vavdi - Isadra Road Tal. Dhrangadhra, Dist. Surendranagar
Road and drain construction work within Ward No. 28 of Bettiah Municipal Corporation, spanning from Lucky Srivastava's house to Deepak Sharma's house in Badhai Tola; drain construction from Manoj Ram's house to Mahanth Ram's house in Harijan Tola; and road construction from the temple to Mantu Tiwari's house, as well as from Guddu Tiwari's land to Neta Mani Mishra's house, in Gayatri Colony.
REPAIR REPLACEMENT OF DRAIN, PATH, HARDSTANDING, FENCING AND BOUNDRY WALL IN OTM ACCN, MD ACCN AND CENTRAL AMENITIES AT ITARANA MIL CANTT UNDER AGE B R I ALWAR
WARD NO 24 OMVEER KE MAKAAN TAK OMKAAR KE PLOT TAK NALI EVAM C.C. DWARA SADAK NIRMAAN KARYA
Mohammad Hasan Ke Ghar Se Kale Khan Baba Ke Majar Tak Nali Nirman Ka Karya. (Mohalla Jahani Thok)
ward 26 anand nagar murari lal pachori ke bhavan se chorasiya ke bhavan tak cc road nali nirman
WARD 1 RAKESH ARYA KE GHAR SE RAMDEV ARYA KE GHAR TAK INTERLOCKING AND BHUMIGATI NALI NIRMAN KARYA
sarvjanik cc interlocking road mukhya road may nali nirman mukhy sadak se pintu ke ghar ki taraf tesganiv
Ward no.-09 me Sukhadi ke ghar se Ramadhar va pool se nale tak r.c.c. nali ka nirman
Construction of drains and CC roads in Ward No. 02 (Ramnagar) from Yadram Singh house to Amar Singh Bhagat Ji house.
Maintenance of water supply, sewage systems and de-silting of storm water drains at HWP(T) for the year 2026-27.
Jeypore-Malkangiri New BG Railway Line: Design & Construction of New BG Railway line from Km 69.60 to Km 125.18 involving Earthwork in Formation , Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridge, Road Under Bridge (RUBs), Road Over Bridge (ROB's), Protection Works, P.Way Track Works with Contractor's own materials(except New/SH Rails) construction of Platforms, Station Buildings, Service Buildings, SP/SSP buildings and Residential Buildings, Water Supply, indoor and outdoor electrification, Provision of 1x25 KV Conventional type OHE, Provision of 2 Nos. TSS, 1 No SP, Construction of new Sub-stations, Electrification of station building, Circulating areas, FOBs, PFs, Quarters, Goomties, Modification/Conversion to Underground for overhaed electrical HT/LT power line crossings etc. on EPC Basis in Rayagada Division of East Coast Railway.
Construction of Lane and Drain, land filling, material filling and blacktopping of Road from shop of Fauji Bodh raj upto H/O Sartaj Singh at Village Shiv Nagar
Construction of CC drain from Puladasu Aravindh (H) to Cheruluri Subba Rao (H) to Ketha saheb House in Chagallu (V) of Chagallu Mandal. Est. Cost: Rs. 30.00 Lakhs
Central zone 1 Division 18 -Proj No.1066/27 DIV-18 BHAVANA NAGAR ROAD JANAYUGAM NAGAR ROAD -POST OFFICE ROAD BHAVANA NAGAR DAIVAPPURA ROAD RETARRING RECONCRETING DRAIN MAINTENANCE
Additional Arrangement through Engagement of an Agency for Street Sweeping, Drain Cleaning and Bush Uprooting Services in Zone-V for the Period from October, 2026 to April, 2027.
S0 959-27-SZ DIV-3 RENNOVATION OF BYPASS RSP OFFICE KERA NAGAR ROADAND MUKKAD CONVENT PALAMMOOD SUB ROAD KOZHIVAYAL KALLUPURATH ROAD RENNOVATION DRAIN MAINTENANCE INPALAMOOD MUKKAD ROAD
REPAIRS TO BOUNDARY WALL, HARD STANDING, STORM DRAIN, KERB STONE, PARKING SHEET AND OTHER MISC WORKS IN AOR OF AGE B/R (WEST) UNDER GE (WEST) COLABA MUMBAI
Construction of a CC road and drain from the house of Devesh Kumar Sharma to the house of Lakshmi Devi in Shivnagar Ektanagar (Ward Nos. 1 and 4).
Construction of RCC drain with slab in Mango Ward no-15 Kalika Nagar Road-4B from House of Pandey to house of Sunil Ray and Diff. cross road.
Improvement work of drain and road from house no. 85 of Sunil Kumar to house no. 101 of Ramesh Balmiki under Zone-6 Ward-27 Nankari. Mohalla Nankari
Reconstruction of cement concrete street drain and sewer line near Bharat Sweets of gali no-03/14 of Ward o. 14, M.C. Karnal.(Only for L/C societies)
Construction of R.C.C Drain with slab in in Mango ward no. 28 From Asgar Ali House to House of Md. Kalimullah and Md. Shamshuddin and different cross Road.
Construction of RCC Drain With Slab in Mango Ward No-36 Gour Basti From Babita Gope House To Anand Vihar Society near Peeple Tree And Different Cross Road.