Loading…
Loading…
7,321 live4,080 closing this weekmost from Directorate of Local Bodies UP and Directorate Urban Administration and Development
7,321 results • Best match
Cutting and Removing of unwanted shrubs singles from compound premises along with clearing of drains, garbage from Bhatbandh I Colony under Purulia Irrigation Division at Block PS PO Dist Purulia for the year 2026 27
Construction of Outdoor Sports facilities comprising of Synthetic Acrylic Basketball Courts (02 Nos), Synthetic Acylic Pickle Ball Courts (02 Nos), Synthetic Acrylic Volleyball Court (01 Nos) and Volleyball Courts (soil filled) (02 Nos), including ... walls, drainage arrangements, ...
Laying of CC road from Madina Dairy Milk to H No 11-1-1204/1/86 (Ameen Bhai ki Mandi), Beside Habeeb Nagar Nala, New Afzal Sagar under Mallepally Division- 147, Masabtank Circle-34, GZ, GHMC.
Work of constructing RCC drain and culvert at Kailsa Bypass Road from Kankar Sarai turn passing near Hindustan Medical through the HP Petrol Pump, towards the CNDS drain.
C/O U-Shape drain , Repair of V-shape drain, P/F Grating at various R.Ds on Shiv Mandir to Shakti Vihar Road under Parimahal Section.) (Excluding GST
Remodelling of existing damaged section drain by Constructing Box drain from H No 11-3-558 to Sheethal cafe under Mallepally Division- 147, Masabtank Circle-34, GZ, GHMC.
Construcion of Cover Slab at Keela Veethi Drain in Lalgudi Municipality
Providing C.C. Lining to Latwadi Kansadi Ex Dharoda Drain With Structure.
Construction of RR step gallery, Kerb, Drain, Fencing and Electrification Works
CONSTRUCTION OF CULVERT & DRAIN WORK NEAR NIRMAL LODGE AT W.N. 18
FC, Soil Aggregate, WBM-III, PMC, CDs, Gabion Wall, Drain etc
Construction of Water Drain at Ranipura Village Ta.Savli Dist.Vadodara (2nd Attempt)
Facility Management Services - LumpSum Based - Industrial; Housekeeping, Up-keeping and cleaning work of various Buildings Roads Drains including clearance of jungle grass etc of Power Plant at DVC KTPS; Consumables to be provided by service provider..
Dr.NTTPS-Attending various civil maintenance miscellaneous works including drains and main security gate, water Treatment plant & 220 KV switch yard during the period from 01.10.2026 or from the actual date of commencement of work to 31.03.2027.
Providing Underground Drainage facilities in Sai Priya Colony Road No.1 internal distribution lines in Ward No.3 in Peerzadiguda Municipal Corporation. (Reserved for SC community Individuals and Societies) (recall)
PROVISION OF STORM RAIN WATER DRAIN WITH SOTAGE TANK COLLECTING TANK FOR RAIN WATER HARVESTING NEAR PRE-PRIMARY SCHOOL OFFRS FARM QTRS STATION MESS MT AREA OF MH WELLINGTON AND PROVISION OF BED HEAD PANEL WITH OXYGEN PIPE LINE FOR NICU AND MI ROOM OF
Construction of a CC road and drain in Ward No. 5, Vishwanath Puram from the house of Manoj Kumar Fauji to the houses of Rohit and Deshdeepak Mishra from the house of Dharmendra Maurya to BenHur Road and from the house of Rajendra towards
Construction of RCC covered Drain from KM 167.000 to KM 170.400 and Reconstruction of Existing Culverts at Km 167.400, Km 168.400, Km 168.600, Km 169.000, Km 169.400, Km 169.600 and Km 170.400 on NH-30 at Keshkal City Portion in the State of C.G.
Ward No 06 Construction of RCC covered drain on both sides of the road in front of District Magistrate s residence, passing through NIC School, in front of the slum and up to the intersection of Pappu Yadav s house ahead of the slum.
Construction of an RCC drain and PCC road (raising of level) in Ward No. 10 of Bettiah Municipal Corporation, spanning from Ghanshyam Tiwari's house to Anjin Kumar's house, and from Ritesh Kumar's house via Raju Prasad's house to the house of Tiwari Ji (Advocate).
Construction of a drain, slabs, and a PCC road in Ward No. 15 of Bettiah Municipal Corporation, spanning the area from Shambhu Halwai?s workshop, past the homes of Amit Ji and Premnath Ji and the Mahavir Mandir, up to Sohrab Ji?s meat shop.
Construction of RCC Drain from Ansarul Shop to Navi Haider,Vimal kumar sharma to Anil Ravidas,Mumtaz to Kashi Tiwari via Fhul kumari,Raju TV mistri to Manoj Vishwakarma via Lalu shukla,Durga gope to Kashi Tiwari, Imambada to Durga Yadav and in diffe
Estimate of Survey & Investigation work for proposed checkdam on Local Drain,Tributories and big river (Men River) near Various Villages of Nasavadi Taluka, Ta: Nasavadi, & Dist. ChhotaUdepur under The jurisdiction of irrigation project sub division-48, Jambughoda, Dt : panchmahal. (PKG-1) jambughoda, dist: panchmahal.
A/R and M/O to GPRA under Phagli Section, Shimla during 2026-27. SH: Provision of retaining wall and drain with grating at Type-II Blocks (C-19, B-7 & C-11) and Type-IV Block A-1 under Phagli Section, Shimla (H.P.)
Construction of P bund near house of Ab Rahim Wani Lane and Culvert near house of Mukhtar Ahmad Dar Tashooq Ahmad Dar and Drain near Mohd Amin Mir and Stair steps near main road to house of latief parry Lane near house of Mushtaq
Construction of CC Drain in W-27 Cross Roads behind of Sri Annapurneshwari Mart, Construction of CC Road infront Holy Crescent School, Laying of UGD Pipeline infront of Vivekanandanagara ITI College and Laying of UGD pipeline in PSV Nagara in the limits of CMC Ramanagara.
Twin Tower Heatless Air Dryer with final filter to RDSO Spec.No. MP.0.01.00.06 (Rev- 06) March 2021 or latest for WAG-9/WAP-7/WAP-5. Electric locomotives with Heater fitted in purge valves and drain valve temperature range 15 to 55 degree Celsius.
In Ward 21 Bhowapur village, construction work of drain and CC road from Vinod Panni Wale to Bintu Pal and from Sheeshpal to Ramveer Pal and from Bhram to Bijendra and from Padam Singh to Pankaj Pal and in front of the primary school.
In Ward-13, Ghukna, construction work of drain and interlocking tiles from Rajkumar house via Narendra Chauhan house to Mrs. Rajni house and in Komal Wali Gali and Ganga Prasad Devi Chaat Wali Gali to Puran house and from Baburam via Sanjay house to
Ward-33, on Bajaria main road, behind the police post, from National Press to Supreme Hotel, in Chakki Wali Gali, from Sardarji house to Sanjay Sharma house, construction of interlocking tiles and drain and work of tiles on the side track in front of
Work of construction of interlocking tiles and drain in Jagdish Wali Gali, Lalit Tomar Wali Gali, H/43 to H/44/4 Wali Gali and in the street from Jaihind Kumar (H/288) to Hemsingh (H/293) in Ward-39, Nehru Nagar Third H Block.
In Ward 58 Chahabai, from D.L. Ranas house to Manoramas house, from Ram Babu Saxenas house to Prem Sainis house, from Sanjus house to Ashok Saxenas house via Anil Sinhas house to Bhagwan Dass house and in the link streets, road and drain construction
Construction work in Ward No. 08 comprising earthwork, brick soling, PCC paving, and the construction of an RCC drain and slab, extending from the area behind the houses of Shri Sharda Rajbhar and Shri Vishal Maddheshiya up to the entrance of Shri Kapildev Chaubey's house.
as per schedule of item
Instant Curing Bituminous Ready Cold Mix, Coarse Sand, Stone Aggregate 20mm or 10mm, Brick Tile, Common burnt clay FPS non modular bricks, 100 mm thick Precast RCC Slab for drain 900X600mm, 100 mm thick Precast RCC Slab for drain 1000X300mm, 100 mm ... for drain 1000X500mm, ... for drain 1200X300mm, ... for drain 1200X500mm, ... for drain 1500X300mm, ... for drain 1800X300mm, ... for drain 2200X300mm, ...
AMC to different quarters of Suri irrigation colony for various repairing works including wood work water supply pipeline and cleaning of campus drains in suri irrigation colony under Tilpara Barrage Sub-Division of Mayurakshi Head Quaters Division
Development and upgradation of cover drains from Polley house to Bhagaban Mudi Shop, Madhab Patra to High Mass, Shantinagar pump house to seram lab, ---- within Ward No.36 Under Bidhannagar Municipal Corporation. (Fund- U.D. and M.A Fund)
Constructionof new Municpal Park in the existing open space near RTC Depo by ProvidingCompound wall, Greenary, Walking Track, Water Supply, Electricity,Sitting Benches internal Drains etc., in Puttaparthi Municipality Under Untied Grant of 2024-25 (2nd Installment).
Laying of RCC pipe drainage and SWG piped drainage and laying of CC road from H.No.2-10-1719/1 (Opp) to 2-10-1724, 2-10-1719/1 to 2-10-1724 (Opp) and 2-10-1738 to Kanakadhara Residency and H.No.2-10-1743 (Opp) to SRR residency at chaitanyapuri colony in Div No.22 (Old 57) of MCK Est. cost of Rs. 17.40 Lakhs under MGF
Repairing of 700 mm dia defective sluice valve with actuator of 250kW drainage pump motor set (Position - 2) delivery line at PS-II, AA-II at New Town under NTK Project.
Construction of connecting CC Drain from D.No.140 jalumuru Appalaswamy house to Alajangi Balamma house 900mm drain Godgala Veedhi back side to chinamadiga veedhi back side & construction of CC Road and Drain from tompala bisamma house to door No.23-51 gunta swarna in 10th ward of Parvathipuram Municipality
CONSTRUCTION OF CULVERT and DRAIN WALL WARD NO.20 IN LALGUDI MUNICIPALITY
Construction of CC Drain from Door No.168 to Door No.138
Construction of A type (two sections) school building (G 2), 4 Nos. Type-II Qtrs. (G 1), 4 Nos. Type-III Qtrs, (G 1), 01 No. Type-V Qtr., canteen, electrical substation, pump room, underground sump, boundary walls along with gates and guard room ... installation, drainage , ...
Construction of A type (two sections) school building (G 2), 4 Nos. Type-II Qtrs. (G 1), 4 Nos. Type-III Qtrs. (G 1), 01 No. Type-V Qtr., canteen, electrical substation, pump room, underground sump, boundary walls along with gates and guard room ... installation, drainage , ...
Operation And Maintenance Of Under Ground Drainage Scheme In All Respect That Is All The Components Executed Under This Tender Mainly Pumping Machinery, Pumping Station ,Pumping Main, Including Establishment Charges And All Materials On Repairing Of Pipe Line And Other Civil Works And Pumping Machinery As Per The Detailed Specification And Obligatory Requirements For Twelve (12) Months Including Disposing Of Sewage And Satisfactory Maintaining The Record For Same (Excluding Power Cost) Maintenance For All Pumping Station In Projects. (Fourth Call)
Custom Bid for Services - 200157169 Removal of Deep ash deposit by Long Reach Boom & Arm Excavator from overflow lagoon area of St#2, Bakuli Nallah and PH-4, PH-5 Catchment area of ash dyke of NTPC Limited, Talcher- Kaniha Similar Category Operation and Maintenance Power House/Power Plant
Provision of Pathway along Platform no. 1, 2, 3, 4, 5, 6, 7 & 8 at DDU and station Drain at DDU station and PT. DEEN DAYAL UPADHA JUNCTION-Improvement of parking area (East side of main station building) behind the SBI at DDU under ADEN/HQ/DDU.