Loading…
Loading…
7,321 live4,079 closing this weekmost from Directorate of Local Bodies UP and Directorate Urban Administration and Development
7,321 results • Best match
Provision of Pathway along Platform no. 1, 2, 3, 4, 5, 6, 7 & 8 at DDU and station Drain at DDU station and PT. DEEN DAYAL UPADHA JUNCTION-Improvement of parking area (East side of main station building) behind the SBI at DDU under ADEN/HQ/DDU.
Supply of set of provision of Drain Cock Protection Cover as per RDSO letter no. MC, LHB, Brake Dt. 06.03.2025 Make SONA BLW PRECISION FORGINGS LIMITED drg no. 1J112040009 & 1J12040010. As per annexure-A. Scope of work as per attached document of M/s Escorts Kubota
Laying of UGD Pipeline, Construction of New Machinehole Chambers in W-10, Construction of CC Drain and Deck Culvert in W-08, W-09 and W-10 and Laying of Paver Blocks in W-14 Sri Bannimahakali Devi Temple Road in the limits of CMC Ramanagara.
Construction of a road and drain from Balistar Raut's house to Shashi Singh's house in Lane No. 02, Teacher Colony (within Ward No. 20 of Bettiah Municipal Corporation), and construction of a PCC road from the main gate of the Missionaries of Charity to Vikas Ji's house.
C O link road from Una bridge to upper Arniala via Bazigar Mohalla Tehsil and Distt.Una (SH Providing and laying interlocking paver blocks at RD.2.275 to 2.445 and 2.640 to 2.760 both Side birm and U-shape drain at RD 2.275 to 2.375(Under OFC deposit
Construction of RCC Drain in (A)Bangali pada near chamda godam from kishor jha house to main road and shajhan house to main road (B) In tanti pada howrah motor road from santossh saw house to janak saw water plant via umesh kirana store and from
Construction of CC road from Balaji Enclave GT Road to Plot No. 522 and from Plot-11 to the wall of IME College and construction of interlocking tiles road and drain from Sanjay Paan Wale to Balaji and from Vikrant house to Shyamraj In Ward-60.
In Ward 02 Siddharth Bihar, street no. 04 Singh Saheb Wali Gali, from Joginder house to street no. 01 B Block, street no. 07 A/B Block Dr. Kamal Wali Gali, from Sanjay Pudiir house to Ankit house, road improvement work by interlocking tiles and drain
Construction of interlocking tiles and drain in City Zone Ward-11, E Block from M.No. E-563 to M.No. E-571 and from M.No. E-564 to M.No. E-556 and from M.No. E-550 to M.No. E-555 and from Risipal house to Satpal house.
In Ward-39, Rakesh Marg Gali No. 03, construction of interlocking tiles and drain in Vishal Chowmein Wali Gali and Vishok Ji Wali Gali and road improvement work by Dans from house no. K/213 to Vishal Kirana Store (street in front of Baleshwar Nagar h
In Ward-94 Kaila Bhatta, work of construction of CC road and drain from Abid house to Asif house in street no. 14 adjacent to A.P.G. Road Mukhtar Hotel and from Nadeem house to Ehsan Qureshi house in Kallu Kasai Wali Gali and from opposite Muslim Fun
DOOR TO DOOR COLLECTION, SEGREGATION OF MUNICIPAL SOLID WASTE (MSW) FROM EACH RESIDENTIAL AND COMMERCIAL ESTABLISHMENTS, DRAIN CLEANING & TRANSPORTATION TO THE TRANSFER STATIONS/PROCESSING SITE INCULDING MANUAL ROAD SWEEPING etc. IN MUNICIPAL CORPORATION, Bhagalpur FOR FOUR (4) YEARS FROM WARD No. 1 TO Ward No. 51.
Ward No.-04 Construction of C.C Interlocking road and U- type both side RCC drain from Musahid Choudhary House via Aslam House to Mohd. Irfan House and Link road- (01) from Rahesh Tail wale to Hafij Afsar Ali House and Link road- (02) At Asraf Theke
construction of CC drain in behind the pond in Seoni Pranmoti area, 1. From Govind Yadav to Maniram house 2. From Naresh Dolly to Manoj house 3. From Santosh Vishwakarma to Ramsing Gurjar 4. From Sanjay Ambare to Rajesh Malviya house at ward no. 16 C
Construction of Connecting CC Drain from D.No.9-5-74, Sweeper Veedhi to D.No.81-1-141 (Back Side) 900mm drain of Sweeper veedhi in Ward No.9 of Parvathipuram municipality
2026-Eng04-34-106 Construction of CC Drain and laying of cover slabs to existing CC Drain Behind SKML Glass House at Bhupeshnagar in ward no 34 of South zone GVMC
Towards earth work in excavation by manual means in foundation trenches or drains, supplying and filling in plinth with sand under floors, brick work, hiring charges of hydraulic machine, stone work, steel work welded, etc. as mentioned in BoQ.
Construction of CC Drain from Sumit Gupta House to Pradhan Nagar High Drain at Sukantanagar under Upper Bagdogra GP under Naxalbari Development Block, FY - 25-26, Fund 15th FC (Tied), ID - 114242310
Providing side wall with surface drain at kamaraj nagar in kilkundah town panchayat
construction of interceptor drain 300kld Stp,10nos leach pit each pit having 10kld
Construction of 400kld Stp,38nos leach pit each having 10kld ,Interception of drain
Construction of interception drain 700,500,400kld stp leach pit 10 nos each have 10kld
Construction of interception drain,700,400kld Stp 16 nos leach pit each capacity 10kld
Reconstruction of damaged drain Ward No 7 Kandiyappadevar street in Kottur Town Panchayat.
Repairing and extension of drainage line near semi-permanent jetty No 2 on the left bank of River Muriganga at Harwood point of Mouza Kalinagar under Kakdwip Irrigation Division i.c.w. G.S. Mela-2027
Improvement Development of lane and drainage system by pdg. RMC, brick work, precast RCC slab etc, Gali No. 18 to WZ-418 to WZ-411 in Santgarh Ward No. 102 Khyala West Zone.
Rectification of leakage of sewage overflows on 1400mm dia K and S Sewer trunk main from Manholes (MH-80) near Ashok nagar bridge on Hussain sagar nala near Indira Park under 339 MLD Amberpet STP SD-I, PD-I, Amberpet
Consultancy Services for DPR Preparation for OTI of Budhar-Umaria (NH-43), Ponda Nala-Shahdol Bypass and Chilman Chowk-Dindori-Mandla Road (NH-543), and Dindori-Mandla Road NH-45 Junction and NH-543 Junction Dindori-Kabirchabutra Road (NH-45)
Laying of UGD and CC road at H.no.30-70(Pushmakanvar) to open nala via M swami(H.no:30-778/A/11 Santosh Nagar in Jawahar Nagar ward no-03 in Keesara Circle 1, Malkajgiri Zone,MMC(Item no.18)
Utility Shifting of HT/LT Line from NH-14(Gopipura) to Dadiya upto Hariyana Border Via Ulahedi-Chandpur-bheekhavas-jasai-Bijwad Chohan-Plawa-Gadli-Dadiya with drain km 9/400 to 16/400 or 20/00 to 28/00 Km in Mundawar due to road widening and Upgradat
Restoration of rain damages on link road from main road to Ashok Kumar House etc House Ward No 4 G.P Dhar in Km 0/0 to 0/600 (SH Construction of Cement concrete pavement, Edge wall V Shape drain between RD 0/060 to 0/600 Under NDRF
In Ward-95 Kaila Bhatta, construction of CC road and drain from Dilshad house to Raja house and from Jhabu house to Razia Sultan house and from Naeem house to Mammy house, from Gali No. 02 Indrajeet house to Ijju house and from Nisar house to Sammu h
In Ward-43 Kadkad village, construction work of drain and CC road from Golu Rawal to Gopi Rawal and the road parallel to Krishna Devi and from Bablu Store to Jitendra Jatav house and from Gopi Rawal to Veer Singh Rawal and from Rahul to Chaman Devi a
Providing RCC Road for the Station and Colony premises, Construction of RCC drain for disposal of rainwater from colony premises (Ashrayanagara Slum Side) and Carrying out improvements to the damaged and deteriorated sanitary main line(Major work store side)including allied works at 220kV Station premises, SRS, Peenya, Bengaluru
NIRMAN KARYA
Earthwork in formation, Construction of Major Minor Bridges, retaining wall, Drains, Supply of ballast, P. Way Materials Track linking works, Construction of building and allied works from Ch 9/190 Km TakeOff to Ch 15/342 Km DE in connection
Engaging of Backhoe Loader (JCB) in all Wards (1 to 12) of Yellareddy Municipality for Cleaning and Desilting of Open Drains (Nalas), Removal of obstruction and Bushes, Debris and Other sanitation related works in Yellareddy Municipality under 15th Finance Commission Grants
Design, Construction and Commissioning of PEB Sheds, Structures, Buildings, Water supply arrangement, Drainage, Sewerage, Fire Fighting works, Road works, Track works, Traversers, Shower testing arrangements, Static and OH water tanks, tubewells, Parking facilities, boundary wall/fencing, EOT cranes, Supply Installation and commissioning of Machinery and Plant, Electric substations, and Power supply arrangements, General Electrical works, associated telecom & IT works etc. i.e. including all Civil, Electrical, Mechanical, IT & Telecom works in connection with construction of new Workshop at Rail Coach Factory (RCF), Kapurthala, Punjab (India) on EPC mode.
Facility Management Services - LumpSum Based - Household and public premises of the Vilages; Door-to-Door collection and disposal of garbage, Clening and saintisation public premises, Clening and saintisation Drainage Systems of the Vilages; Consuma..
Laying of Underground Drainage Trunk line from Durgamma temple kaman to IICT colony and other Lanes in Ward No: 4 in Peerzadiguda Municipal Corporation. (Reserved for Weddara / Sagara / Uppara community Individuals and Societies)(recall)
Facility Management Services - LumpSum Based - Household and public premises of the Vilages; Door-to-Door collection and disposal of garbage, Clening and saintisation public premises, Clening and saintisation Drainage Systems of the Vilages; Consumab..
Strengthening of Bank on Revenue drain of Vadlavanipalem Village of Palakol Mandal W.G. District
Construction of CC Road and drain at ward 14 Hanuman Mandir.to Govt.School. (II call
Providing and laying Interlock Tile at RD 0 of Bishan link Drain Pump House.
C/O Underground drain and interlocking tiles on the internal footpath of Niti Village.
C/O Underground drain and interlocking tiles on the internal footpaths of Gamshali Village.