Loading…
Loading…
7,321 live4,077 closing this weekmost from Directorate of Local Bodies UP and Directorate Urban Administration and Development
7,321 results • Best match
As Per BOQ
As per BOQ
As Per BOQ
Upgradation and development of concrete road and drains at Nabapally Khali Quarter , RA-450 to RA-457, RA-A.J Sporting Club to RA-221, RA-322 to RA-301, RA-295 to RA-276, RA-202 to RA-220, --- within Ward no- 35 under BMC (Fund- U.D. and M.A Fund)
SH- Formation cutting/Filling, R/Walls, CD works, P/L G.S.B., W.M.M, Tarring work (50mm thick DBM 30mm thick BC, C.C. Pavement , Side drain (U-shape , V-shape drain , Parapets and P/F road side Furniture in Km 0/000 to 10/680) under State Head (OTMNP
Installation of drain cover (grill) from the in front of sakhigopal Mondal House in ward no-12, under Bolpur Municipality.
Construction of 300mm CC drain from siva electronics to D.no; 2-20/P , in Boyapalem-2 , 5th ward , Rajampet municipality.
Construction of CC Road and drain in Mohalla Quereshi from house of Zaid near M.H.Public School to house of Alam.
Construction of CC Road and drain in Mohalla Raipur Kalan from house of Maan Singh to house of Chaman Singh.
C/o R/wall, HP culver side drain and P/L M/T between Km 0/880 to 1/300
C/o C.C. pavement, side drain and P/L MT on various RDs between Km 0/0 to 2/00
Supply,installation and commissioning of Water Separator and Automatic Drain Valves for Unit 1 of STPS-O and M, Suratgarh
APP A Renovation of Thalakkulam at Vendar Ela APP B Renovation of Madathikkulam APP C Drain at thalakkulam and madathilkulam
Restoration of Inlet Drain of Under Tunnel at Km 17.700 of Mukthyala Branch Canal Huzurnagar Village and Mandal Suryapet Dist
C/O B/wall, 900mm dia RCC hume pipe culvert and shape Drain) in km 0/440 to 1/00)
Darsi Municipality - General Funds - 26 - 27 - Construction of CC Drain from Devandla Prasad House to Rice Mill in 13th Ward
Construction of Water Drain Near Dena Bus stand Navi Nagari Nazir Bhai Home to Main Road Ta.Vadodara Dist.Vadodara (3rd Attempt)
Set of Magnetic Sealing Plug R 3/4 inch as per CLW Drawing No. 1209.01.413.021, Qty. = 01 No. and Copper 'O' ring for Oil drain plug and Oil level gauge, having dimensions of diameter = 68/60/1.5 mm thick, Qty. = 01 No. for use in gear case assembly of 3 phase locomotive. One set consists of 02 items in 02 Nos.
Construction of Station Building, EI Building, others Building, Platform, FOB, PP shelter, Dismantling of existing building & Others structures and other ancillary civil works such as drain work, retaining walls, road works etc. from Gomoh CH 300.15 to Koderma CH 393.55 in connection with 3rd & 4th multitrack project between PKA-MPO section of Dhanbad Division of ECR under Dy.CE/HZME-I
As Per BOQ
As Per BOQ
As per NIT
P/L B.C. 25mm thick in km 2/0 to 3/0, 0/0 to 1/0, 0/0 to 1/0 and 5/0 to 6/0 respectively with paver finisher (Under PDNA-2025)
Construction of Box Type VRB In Place of Damaged Pipe VRB at Ch.2650 mt. of Porda to Saiyat tank Drain.
Repairing Renovation work at Toilet and Cross Drain Work at Habra State General Hospital within ward no-08 under Habra Municipality.
Strengthening of Bank on Gontheru Major drain and Construction of Ramps in Rayakuduru village limits of Veeravasaram Mandal in W.G. District
Demolition and Re-Construction Of Strom Water Drain Top Slab at Soosaipuram (Road crossing) in Division-110, Unit-24, Zone-09
Construction of Balance RCC Drain at Entrance & North side of Hindu Maha Prasthanam Burial Ground in 29th ward of Sattenapalle Municipality
CONSTRUCTION OF RCC DRAIN FROM JAIHIND GALI TO MANOBODH BARETH HOME TO MURLI AGRAWAL HOME TO JOHAL PALACE AT W.N. 17
C/O 2.00 mtr. Span slab culvert, B/wall, R/wall, V-shape Drain in km 0/00 to 0/900).
Providing and laying 900mm dia RCC hume pipe culvert and V-shape drain in between km 0/00 to 0/850.
MAINT OF SURFACE DRAIN AT DIFF PLACES AT R BLOCK B P TOWNSHIP AND SURROUNDINGS IN WARD NO 110 BR XI
Construction of CC Drain and RCC Culverts with Gratings at Kovalakuntla vari street in 56th division, Circle-1 area (9th call)
As Per BOQ
An estimate has been prepared for the restoration of the damaged sections. Water Bound Macadam (WMM) is proposed for the severely affected portions.
Construction of CC Road & Both sides CC Drain Door No.125 Bonela Simhachalam house to Doo No.140 Akula Simhachalam in Godagal Veedhi and construction of CC Road & Drain gembali ramesh house door No. 100 to door No.112 pondoon ramulamm in godagala veedhi in ward No.10 of Parvathipuram Municipality
Construction of roads and Drains from H. No. 103 to H.No. 131 Gali no 4 Guru Ram Dass Nagar , H.No. L-4/11 to H.No. L-9, L-19 to L-11 in L Block ,H.No. 19 to H.No. 24 Krishan Kunj Colony by providing RMC in Laxmi Nagar ward 203 Shahdara South Zone AC
Construction of 450mm CC Drain IN GOVINDAPPA STREET from d.no 16/144 To 16/122-1 in 10th ward in madanapalle municipality
Providing GI Sheets for existing side drain supports Near DSA Stadium in ward no.34 of Narasaraopet Municipality. Short tender - 1st call.
Construction of 300mm section new CC Drain at water logging ares in Govinda Nagar (West side), Chapuram-2 in Srikakulam Municipal Corporation
Construction of 300mm section new CC Drain at water logging ares in Govinda Nagar (East side), Chapuram-2 in Srikakulam Municipal Corporation
Construction of CC Drain from D.No.6-374/I-1-C to D.No.6-374/M3 in RS Road-01, Rajampet Municipality
Construction of CC Drain from D.No.8/146-T-to D.No.8/146-D at Gollapalli in 12th Ward Secretariat Rajampet Municipality
Construction of RCC Drain From Dinesh Sharma House to Sarar Via Nemichand Vishwakarma House at Ward No. 04,Fingeshwar,Dist-Gariyaband(C.G.)