Loading…
Loading…
22,095 results • Best match
M/o completed scheme under Nazual A/c-II(NZ). Cleaning and sweeping of roads desilting of SW drain, M/o toilet blocks,removal of refuse at transit camp Gautam Colony Narela and desilting of outfall drain from Gautam Colony to main Bakner drain Narela
Desilting/removal of drain Silt from sherpur chowk RHS to tukhmirpur road outfall RHS in Ward No. 247, Sadatpur, shah (N) Zone. SH1- 60 percent of Desilting of drain in 1st Phase from 16.01.2026 to 15.06.26 SH2- 40 percent of Desilting of drain in
Desilting of Gokalpur drain from R- Block culvert to S block Brahmpuri culvert in Ward No. 226, Gautampuri, Shah (N) Zone. SH1- 60 percent of desilting of drain in Ist phase from 16.01.2026 to 15.06.2026 SH2- 40 percent of desilting of drain in 2nd p
A/R and M/O to various roads under PWD Division NWR-1 dg. 2026-27 (SH Raising of existing brick drain height connecting missing/collapsed existing brick drain, casting of drain slab i/c construction of footpath, berm etc. at various locations under S
De-silting of gokulpur drain from R-block culvert to S-block brahpuri culvert SH1- 1st, 60 percent of Desilting of drain in 1nd Phase from 16.01.2025 to 15.06.2025 SH2- 40 percent of Desilting of drain in 2nd Phase from 16.06.2025 to 15.01.2026 in
Desilting/Removal of silt from drain RHS from Sherpur Chowk to C-block Dayalpur drain in ward no. 247, Sadatpur, Shah.(N) Zone. SH1- 1st, 60 percent of Desilting of drain in 1nd Phase from 16.01.2025 to 15.06.2025 SH2- 40 percent of Desilting of drai
A/R and M/O Roads under North Roads Division, PWD, Delhi during 2025-26. (SH- Construction of Sump and Sump Room, RCC drain, culverts, drain chambers and covering of open drain on Shah Alam Bandh Road, Malik Ram Tandon Marg, Pump House Road .....
Desilting of 1. Fish market drain pump house to Gali masjid wali kailas nagar 2. . sumpwell kailash nagar, 3. scooter market drain rajgarh colony Gali no 17 to chand Mohalla dhalao 4. Raghubapura drain (a) raghubarpura Gali no-5 to lal batti chowk (b
Cleaning maintenance of berm side slopes and bank of the drain including water way from Shastri Nagar RD50700m to Bharat Nagar RD51237m on both bank of N G Drain From 01 06 2023 to 31 03 2024
Desilting of 1. Vasant Vihar Nallah from culvert on Munirika Marg to H.No.A-25 Olof Palme Marg 2. Guru Harkishan Public School Nallah in Vasant Vihar from DDA Park to Vasant Vihar 3. Indian Airlines Nallah in Vasant Vihar from H.No.38 to Poorvi Marg
Improvement Development of Nallah No.4 at back of Vishwa Hindu Parisad Mandir in Sector 6 R.K. puram and Kushth Ashram Nallah at Ring Road, at ambedkar Basti R.K. Puram by Erection of Jaal to stop Sludge and Plastic materials dropping into nallah and
Construction of RCC drain from H.No. B-21 to 52 Cusic drain to improve the drainage system in New Zafarabad by pdg.RCCItems in ward No. 235 Gorakh Park Shah. (N) Zone.
Imp. Dev. of drains Gali No.12 from H.No. A-156 to A-154, A-161 to A-160, A-163 to A-166, A-173 to A-176, A-184 to A-181, A-195 to A-191, A-227 to A-228, A-208 to A-223 and A-231 to A-232 in Wazirabad village Ward No.11.
Imp. of lane by pdg. Drainage and RMC from Janta Park to F-13 along Ramjas ground in West Patel Nagar, Ward No.85/KBZ. 23/66/XL-VIII-N/P-854
Removal of existing standing hyacinth and maintenance of N.G. drain free from hyacinth, patera, elephant grass, floating material grass or any other water plant from the bed of the drain and keep the surface of water in the drain clean
Removal of existing standing hyacinth and maintenance of N.G. drain free from hyacinth, patera, elephant grass, floating material grass or any other water plant from the bed of the drain and keep the surface of water in the drain clean
Desilting of drain in the area of ward no. 44E Bhajanpura from H.No. B-51-3 and 4, Gali No. 4 Bhajanpura to D-116, Gali No. 9 Gamri Extn. in ward no. 44E Bhajanpura in AC-66 under the jurisdiction of E.E.M II Shah North
Restoration of boundary wall in DESU colony on left bank of N G Drain
De-silting of Kasturba drain in Ward No.207 Vishwas Nagar Shah. South Zone
De-silting of Ghazipur drain in Ward No.205 I.P. Extension Shah. South Zone
Engaging of backhoe loader and tipper truck for improvement of drainage system of block No.14,16,17 and 20 nalla to main road Maharishi Balmiki Marg, From H.No.760 Block No.3 Dakshinpuri Extn. to Boundary Wall of Jahan Panah City Forest and from Bloc
Imp. Dev. of Lane by pdg. RMC, M/H, GG, etc from G-2 to Tayal Electrical, G-4 to Nalla, Batra Properties to Nalla in Gandhi Market in Ward No. 31-S in Sagarpur West.
Removal of obstructions from water ways to maintain smooth flow of water by using Amphibious excavator B w RD 29100m to RD 28080m into Supplementary Drain
Imp. Dev. of drain and lane by providing RMC from Pole No. 511-35-13-8 to Vimla Prasad Hs. Nathupura village in Ward No.7.
REPAIR AND MAINTENANCE OF INFRASTRUCTURE ASSETS IN R-IV DIVISION DURING 2023-24. Sub-Head-REPAIRING AND SERVICING OF PUMP SET AND DEISEL ENGINE AND SUPPLY OF JACKET AND OTHER ARTICLES AT KAUTILAYA MARG DRAINAGE SERVICE CENTRE.
Improvement and Development of raising of drain from Yogender Gupta to Amrender Singh in Laxmi Vihar Ward No.6 Burari.
a
a
a
Imp.dev. Of road and drain in Naniwala Bagh Mpl. Flats by providing RMC and pipe drainage system in Ward No. 18N/CLZ.
Cleaning maintenance of berm side slopes and bank of the drain including water way from PWD Bridge RD 49775m to Shastri Nagar RD50700m on both bank of N G Drain From 01 06 2023 to 31 03 2024
Unipole Cluster No.37, Madhuban Chowk to Sector-24 Nalla (Left Side Only), Rohini Zone
Repair and Maintenance of Infrastructure Assets in R-I Division during 2022-23. SH Providing and Fixing of M.S. Grating and drainage line at Hanuman Lane in NDMC area.
Maintenance of Supplementary Drain to keep it free from all kind of floating material garbage hyacinth patera wild grass obstructions I e dead animals trees from water surface of the drain to maintain free flow of water by collecting and its disposal
Maintenance of Supplementary Drain to keep it free from all kind of floating material garbage hyacinth patera wild grass obstructions I e dead animals trees from water surface of the drain to maintain free flow of water by collecting and its disposal
Cleaning of Madanpur drain below Rohtak Road Bridge by Super Sucker machine in Mundka A/C.
Construction of Guard wall Between RD 29500m to RD 29820m left side bank of Mungeshpur drain.
Surface dressing of Mungeshpur drain from RD 23413 M to 17020 M in District North- West.
Repair of damaged RCC bridge by applying shot creting at RD 50700M of N G Drain
Repair of damaged RCC bridge by applying shot creting at RD 48615 of N G Drain
Disposal of Desilted earth From RD 0m to RD 16436m of Supplementary Drain at IFC vacant land near Bhalswa sanitary land fill site
Imp. Dev. of S.W. Drain at Lok Vihar A Block, Rohit Kunj, Harsh Vihar and Pitampura Village in Ward No 68 Kohat Enclave.
Disposal of desilted earth between RD 28230m and RD 29000m to fill up ground depressions on bank authorized dumping point of Supplementary Drain
Carriage of Soil and other deposited materials from bank of Supplementary Drain between RD 9400m and RD 11000m for the year 2026-27
Carriage of Soil and other deposited materials from bank of Supplementary Drain between RD 14100m and RD 16436m for the year 2026-27
T/M of SW drain system in R-III division during 2023-24. SH - Desilting of open drain area under the jurisdiction of Sub Division-III (R-III).
A/R and M/O drain and bunds during the year 2020-21.Repair of bridges at different location on B.C. Drain from RD 400m to RD 8200m.
Construction of RCC drain under Sub Division M-2112 during 2022-23. (SH - Remodeling of drain B-Block Vivek vihar Near DDA Market and Vivek Vihar Pump House).
Desilting of Escape drain No.1 by deploying suitable, machine between RD 980m to RD 2975m and maintenance of drain for the period of Nine months after desilting.
Construction of road with RCC drain from Mungeshpur drain to Nangloi Najafgarh road in Jai Vihar Unauthorized Colony (Regn No. 586) in Vikaspuri AC-31 in Distt. West