Loading…
Loading…
17,537 results • Best match
Covering of open drains with SFRC frames and slab in in indira colony new Ramesh Nagar at various locations in ward no.14, MC Karnal. (Recall)
Re-construction of Street with Cement Concrete, type-I, and type-II drains in Taal Mohalla and near Banso Gate, Ward no. 15, M.C. Karnal (Recall)
Lifting of Dung, Cleaning of drains and cleaning of all streets area in dariy complex of Raipur, Kail and Aurangabad at Municipal Corporation Limit Yamunanagar-Jagadhri.
PAVEMENT OF IPB STREET WITH DRAINS AND TOE WALLS (H/O RAJPAL TO H/O AMAR SINGH) AT VILLAGE GOTHRA BLOCK LOHARU (SCHEME - VAGY) Re Tender
Estimate for covering of open drains with SFRC frames and slabs, main road Sadar Bazar, and the surrounding area in ward no. 14, M.C. Karnal (Recall)
Providing and Laying 80mm Thick IPB M-40 Garde and Construction of Drains Plot of Balwan to H/o Ramesh in Ward No-11, MC Nissing.
Repair and Restoration of Streets, Drains,Culverts and Potholes by IPBs at various locations in ward no 21 mc Panipat(Rural) for L and C Society
To closer of temporary relief drain in village Khan Mohammad which was excavated to drain out the flood water during the recent flooding incident in July 2023
Providing and Laying NP-2 pipe for drainage of waste water adjoining Govt. High School Shadipur in ward no. 12 (Recall)
Drain out the water from waterlogged area through Solar based Tub well
Extension of Khabra Drain from RD 4100 to 0
CONST. OF DRAIN OPPOSITE MARUTI SHOWROOM AT VILLAGE BHALSI
Ditch drain parallel of Barwala Branch 107000 to 113000
Excavation of kachacha drain fron STP behind Surya vihar to the Railway culvert along Gurugram Rwari track for disposal of ariny water in laxman vihar, Surya vihar, laxman vihar, Sector-07 and near around the area) ward no.10, Zone-I, MCG.
Cleaning of Old pipe lines, nallah, manholes and Gully Chambers of various size at various locations of Ram Nagar, Ward No. 19, M.C. Karnal. (For Rainy season-2025) (Only for L/c societies )
Hiring of 1 No. JCB and 1 No. hydraulic trolley of nallah from vir bazzar to basantpur village and shani mandir to avtar singh bhadana kothi in panchsheel enclave Ward No.25 Faridabad.
Cleaning of storm water pipe line, Gully Chambers and nallah of various size at various locations of Ram Nagar, Ward No.19, M.C. Karnal (For Rainy season-2025) (Only for L/c societies )
Const of Boundary Wall around Nallah area in Sec 12A Panchkula complete in all respect and all other works contingent thereto including mtc. and defect liability period of three years free of cost
De silting of Nallahs and lifting of silt in MC Sadhaura area by JCB Machine including cost of manpower tractor trolleys including all taxes and other material Length of Nallah 11.04 Km approx
Construction of Nali Garhi Kotaha Construction of B/wall of kabristan Vill Garhi Kotaha Const of Street 2nos in village Kakrali and Tharwa
Construction of street and nali from H/O of Subhash to H/O Neerja Ram ( Barmi Devi ) in madhuban colony ward 5 (RECALL)
Jandli Khurd Estimate For Const Of Waste Water Nalla(1.5 x 1.5) at Village Jandli Khurd Block Bhuna ( Fatehabad) From (A) H/o Fakkar S/o Bhadu To H/o Tara Balmiki and Fatehabad Road (B) Sc Colony (RE-TENDER)
Cleaning desilting of Master storm drain Sec 4 A 6 Dharuhera Cleaning of drain from Biwadi road to Subhash Chowk and near Rajpura disposal drain by 400 HP super sucker machine
Repair of approach slab and parapet wall of bridge at RD 4900 of Ambala Drain, repair of bridge at RD 8983 of Ambala Drain, RD 1.500, RD 0.500 of Ghel Drain
Estimate for Internal Clearance of Ludana Link Drain from RD 0 to 13000
Estimate for Internal Clearance of Sink Bahadurpur Drain from RD 61270 to 82270
Estimate for jungle clearance from internal section of Kawali Link drain, Rohat Drain before monsoon 2026 (RD 0 to Tail).
Estimate for the Const of Nala from Ho Sohan Lal So Dharambir Jogi to Ho Baldev at Village Manchuri Block Nilokheri Dist Karnal Ward No 4
Construction of RCC Nala from Polytechnic Chowk to Poultry Chowk and along with Haryana Dairy and Veterinary Hospital in Ward No. 05 and 07, M.C. Nilokheri.
C.C. Drain Cover (Grating) in NVM/NGM at Sampla., Distt. Rohtak.
As per the tender document.
Const. of Drain gate of Virat Nagar to PWD B and R Drain Near Jandli Bridge Ward No. 14.
Providing regulator and Constructing Sump at outfall of Dighal Link Drain into Dhandlan Link Drain at RD 23400-L
Estimate for desilting Hodi of Sampal Drain from RD 0 to 8600 outfalling at RD 11500/R sampal Drain.
CONSTRUCTION OF PANJOKHRA GHAGGAR LINK DRAIN FROM 0 TO 11.250 Km OUTFALLING IN AMBALA DRAIN AT RD 7225 FT.
Retender of Providing Regulation gate in Jassia Link Drain outfall point at RD-99000 L at Drain no. 8
Internal Clearance of Seria Gochhi Link Drain from RD 0 to 14750 and regrading of Seria Gochhi Link Drain.
I/C of New gujrani Drain from RD 0-9714 and 1-R Gujrani drain from RD 0-8000
Construction Drain Type-I,Drain Type-II ,Culvert And Other Minor Repair Work Various Places in Ward no.6
Cleaning and repair of Storm Water Brick Drain/ pipe Drain in Ward No. 23 Zone-I under MC Gurugram.
Dismantling of drain slab and upgrade drain with brick work in indra awas colony narsinghpur ward no 24 gurugram.
Providing and Laying 80mmThick Interlocking Paver Block in various Streets and Drain in Drain in Village Badholi MCF Faridabad.
Internal Clearance of Ismailabad Drain from RD 4400 to 20200 and RCC Open Drain from RD 6950 to 17230
Providing and fixing perforated precast drain cover on open drain in front of Type-1A houses in MDU,Rohtak
Detailed Project Report for Providing Strom Water Drainage System, Construction of RCC Open Storm Water Drains in Palwal Town, Under PHED Division No. 3 Palwal Distt. Palwal.
const of side drain at vill Madana Khurd
CONST OF DRAIN SCHOOL TO FIRNI VILLAGE KASSAR
INLET FOR PROTECTION AT CHAUTANG NALLAH
Internal clearance and Deweeding of Internal section of various link Drain Nahri Link Drain No. 1 from RD 00 to 8000, Nahri Link Drain No. 2 from RD 00 to 7000, Halalpur Link Drain from RD 00 to 10000 and Jhinjholi Link Drain from RD 00 to 10000 befo