Loading…
Loading…
17,540 results • Best match
I/C of kahni Link Drain from RD-0 to 19000, I/C of kahni Sub Link Drain No. 1 from RD 0 to 10500 and I/C of kahni Sub Link Drain No-2 from RD 0 to 65000.
I/C of Kahni link Drain from RD 0 to 19000, I/C of Kahni Sub link Drain No. 1 from RD 0 to 10500 and I/C of Kahni Sub link Drain No. 2 from RD 0 to 6500
I/C of Kahni Link Drain from RD-0 to 19000, I/C of Kahni Sub Link Drain No - 1 from RD-0 to 10500 and I/C of Kahni Sub Link Drain No - 2 from RD- 0 to 6500.
Construction of RCC Nala from Bharti Sweets Shop to Gandhi Juice Corner Shop and Construction of Street from H/o Harikisan to H/o Shamsunder in Ward No. 14, M.C. Nilokheri.
Imp. Dev. of Road by providing RMC and Drainage System from P. No. 308/1 to Old Rohtak Road near Relaxo Gali and adjoining lanes in Shehzadabagh in Ward No. -71/CSPZ Kishanganj
CONST OF IPB STREET WITH DRAIN
CONST OF IPB STREET WITH DRAIN
CONST OF IPB STREET WITH DRAIN
CONST OF IPB STREET WITH DRAIN
CONST OF IPB STREET WITH DRAIN
CONST OF IPB STREET WITH DRAIN
Replacement Construction of syphon at RD 4670 of Shera Link Drain crossing Madlauda Minor and replacement of bridge at RD 2750 on Shera Link Drain
Brick Side Lining of Ludana Link Drain from RD 0 to 9000 outfall in Padana Drain at RD 52000-R alongwith Jind-Gohana National Highway
I/C, J/C and S/C of Rajana link Drain from RD-0 to 5500 and Rajana Sub Drain from RD 0 to 2500
Construction of Majra-siwana link drain (underground RCC Pipe) from RD 0 to 12800 outfalling into Ditch drain along Loharu Feeder at RD 32953-R
REPAIR MAINT OF SEWAGE LINE, MANHOLES, AREA DRAIN, CULVERTS, DRAIN COVER ETC IN C 2 SECTOR OF AGE BR I UNDER GE (SOUTH) AMBALA CANTT
Construction Matanhail Pipe Line Link Drain (Through underground HDPE Pipe line ) from RD 0 to 12100 and outfalling at RD 5500 Matanhail pipe link drain
Construction of V.R. Bridge at RD. 9678 of North Possar Drain and Re-Construction of Broken culvert at RD. 4300 of North Possar Drain South.
Retender Laying 900MM Dia RCC Pipe NP3 in Ismaila 11B Drain to prevent Garbage in Abadi area and Chocking of Drain from RD4300 to RD5600
Construction of R.C.C Box Type Drain and Drain Type-II From Munda Majra Road to Bachhajivi Dairy Chita Mandir Road Ward no 11, Yamunanagar.(Recall)
Increasing capacity of Sarai-Aurangabad KASSAR Link Drain from RD 0 to 34052 out falling into KCB Drain at RD 8103/L including pucca structure.
CONST FO IPB ROAD AND DRAIN REPAIR WORK IN WARD NO 10 TO15CONST FO IPB ROAD AND DRAIN REPAIR WORK IN WARD NO 10 TO15
CA NO CWE/CHM-01/2021-22 REPAIR/REPLACMENT OF DRAIN AND DRAIN COVER, PERIMETER FENCING, PARKING GARRAGE UNDER AGE B/R-I AT CHANDIMANDIR
Jungle clearance and I C removing obstructions of Rajana Link Drain from RD 0 to 10000 and Rajana Sub Drain from RD 0 to 2500
Regarding laying of cable along with the Drain no. 01 from Kutani Road drain puliya and Sanoli road to Chotu ram chowk MC, Panipat. Recall
Construction of various street and drain in Dharampura colony, Kahran Street, Lakadharan Street, and drain in Gomti gali ward no 02 MC Yamunanagar-Jagadhri Recall
Auto Drain valve to Knorr Part No. KP0800902. Firm's offer-Make/Brand:-"Auto Drain valve as per KBI Part No. KP0800902" and Make/Brand:-"Self"
Const of street and drain with paver block form Gyani kriyana to jitender rana in ward no 13
Construction of RCC drain from narela road to workshop of manjit tempo in ward no 14 MC Kundli
Const. of street and Drain with paver block from Kharanger chopal to h/o ramesh in ward 4
Const. of street and drain with paver block from Main Bazar to Shop of Kashmiri in ward 9
Construction of HL Bridge in Panchkula (Extn.). (Shifting of utility services i.e, SWD line, Manhole, road gullies and construction of road and Rising of Manhole and Existing Nallah/SWD Line complete in all respect and entire satisfaction of Engineer
Estimate for De-silting of Strom Water line 1600mm dia from 17 No. Chungi to Dabua Pali road Disposal and De-silting / cleaning of Nallah from Shiv mandir NH.3 Pullya to Disposal in ward no. 10 NIT Faridabad.
Rough cost Estimate for Providing and Laying 1200mm dia RCC Pipe line NP-3 from starting Point upto existing RCC new Nallha for Gounchhi Disposal along with additional RCC slab on existing Nallah in ward No. 05, NIT Faridabad.
Internal clearance and removal of slush from RD 0 to 29770 of Safidon Drain
Repair of Petch Work (Harpath) of Interlocking Paver Blocks, C.C. Pavement and Slab on Drains in Various Place of M.C. Nilokheri.
Constructing underground RCC NP2 pipeline drain for dewatering of flood of village Shakarpura out falling RD 2000 to 0 into Rangoi Nallah at RD 5.95 Km left side
Construction of IPB Street with Drain from Balaji Mandir to H/o Manphool s/o Tarachand
Repair of Side drain on various Link and approaches RHS in Gharaunda Constituency in Karnal District.
CONST. OF SLAB ON DRAIN(KOOL) FROM H/O JASBEER TO MAIN FIRNI AT VILLAGE MAMLI
Const. of Road and Drain/Storm waterline from PHC Hospital to Panchmukhi Mandir W. No. 10
Const. of Drain from S.C. Chaupal to Joginder, culvert at Block Ballabgarh Distt. Faridabad (P. Samiti)
Const. of Gali and Nali from H/o of Amita Chawala to H/o of Pardeep Chhokar Ward No. 14 M.C Panipat (Rural) under D-Plan FY2023-24
I/C of New Baliyana Link Drain from RD 6000 to 17800, Estimate for I/C of Garhi Bohar Link Drain from RD 8800 to 11000, Estimate for I/C of Garhi Bohar Sub Link Drain from RD 0 to 5000, Estimate for I/C of Kheri Sadh Link Drain from RD 0 to 19400 for
I/C of RithalKiloiMundhak link drain from RD 0 to 26000, I/C of Mundhak Sub Link Drain from RD 0 to 2200, I/C of Rithal Narwal Sub Link Drain No - 1 from RD 0 to 2860, I/C of Rithak Narwal Sub Link Drain No - 2 from RD 0 to 1100 and I/C of Rithal Pum
Pav of Street with drain at village Laxmanpura Block Tosham
Reconstruction of V.R bridge at RD 5400 of Sehrala Drain.
I/C of Pakasma Drain from RD 35400 to 58500.
Providing Ramp at V.R Bridge Rd 4650 MC/PH Drain.
Replacement of V.R. Bridge at RD 94991 of Nuh Drain.