Loading…
Loading…
8,623 results • Best match
One time cleaning and minor repairing of drain, ash / garbage and clearing grass at Kharkharee, Maheshpur and Jogidih under Govindpur Area
Repair and maintenance of different drain of Maithon colony under Maithon division, at DVC, Maithon
CONSTRUCTION OF CULVERT NEAR LOCAL NALA AT VILLAGE KALIMATI.
PROVISION OF SALAB WITH PEDESTRIAN PATH ALONE DRAIN FROM THE COMMUNITY TOILETS IN WARD NO. 16 TO HOUSE OF MUNESH BHUIYAN VIA HOUSE OF UPENDRA RAM
Cleaning of ash, garbage, drain and jungle cutting at C type, B type and D type bungalow at Sinidih under Govindpur Area. (21 nos. of qtrs.)
CONSTRUCTION OF R.C.C. DRAIN FROM VIJAY SAW HOUSE TO CONNECTING BIG DRAIN NEAR UPENDRA PANDEY HOUSE VIA MAMTA DEVI HOUSE , RAMANUJ PANDEY HOUSE AT GAS GODAM GALI IN WARD NO. 23 UNDER JHUMRITELAIYA NAGAR PARISHAD
Construction of RCC Drain and 450mm NP2 hume pipe drain from house of Hareshwar Pandey to Sapra main road via house of Devkant Singh and Uttam Mishra at Satbahani in Ward No. 03 under AMC.
Estimate for Cleaning and Repairing of Batti ghar (Cap Lamp) drain from colliery store main gate to Batti ghar and Colliery E and M engineer room towards Main drain at Gopalichak Colliery under PB Area
Repair and Maintenance of drain, cleaning and earth cutting for kutcha drain behind MTK building, 1 n 2 inclined fan house and behind Sawang C seam at Govindpur, Under Govindpur U/G Project, Kathara Area.
Fabrication and erection of suction short pieces, nozzle, drain nipple, flange, fitting of suction valves, drain valves and connection of suction pipe line in thickener no. II in the Fine Coal Section of Kathara Washery
Making new katcha garland drain and cleaning of old katcha drain including provision of RCC Hume pipe and PCC LMV entry road to potanga pit office at Urimari Project under monsoon preparartion of BS Area.
Construction of RCC drain (broken/damage part) and making slabs including cleaning drain from plot no M to M9, L to L9 and K to K9 at Pampiya of Lohandia rehab site, under Rajmahal Area.
Construction of RCC drain in Rajpati sah colony from Rohit jee house to Anuj kr.sinha house,Balram mahato house to Bada drain ,Near Ganga bhawan and Link gali in ward no 30 under DMC Dhanbad
A/R & M/O to Non-residential building of CPWD Ranchi during 2022-23 SH: Construction of new drain to connect with existing main drain back side & miscellaneous works at Office of EE-Hinoo Ranchi
Laying of new 8 inch dia pipeline (Second range) from coal face sump to Dhupgraha Nala and shifting of 2000 GPM pump as and when required under Dakra Project (Approx total length of new pipeline 1000 Mtr and shifting 200 Mtr.).
Provision of 90 watt LED Street light with 7 mtr Octagonal pole along the road from Harish Chandra Mahto house (Sone pada nala NH-33) to Brahmananda narayan Multispecialty Hospital (1.5 Km) with 5 year annual maintenance at Dist. Seraikella Kharsawa.
Construction of High Level Bridge over till river at ch 22.850 km (Span- 3x16.6) and Construction of High Level Bridge over Nala at ch 21st km (Span-1x10.60m) of Haripur-Asanbani Road under Road Division Dumka for the year 2024-25.
CN OF P. C. C. ROAD FROM NAND BATIKA TO SHAMSHAN GHAT P. C. C. ROAD and R. C. C. NALA WITH PRECAST SLAB FROM POST OFFICE TO BABU CHOWK and PAVER BLOCK ETC WARD NO 5,11 and 12 Gr-7
CONOF PAVER BLOCK ROAD FROM SHIVE PUR POKHAR NORTH SIDE TO SWARAJ SHOW ROOM VIA BUDHAKAR JHA HOUSE LANGBASANI NAGAR and CONSTRUCTION OF R.C.C. NALA WITH PRECAST SLAB FROM RAJKACHAHARI POKHAR TO MACHHALI GODAN etc in ward 1 2 3 4
FABRICATION AND INSTALLATION OF NEW C/R AND H/R GATE WITH EMBEDDED PARTS, HOISTING ARRANGEMEN T OF CANAL CHAIN NO. 53 AND MAINTENANCE OF C/R GATE, H/R GATE AND HOISTING ARRANGEMEN T OF NAKTI NALA WEIR SCHEME.
Construction of HYDT 200 165mm dia boring including providing 3 H P submersible pump pump house security guard room electrical wiring construction of approach road and drainage at 132 33 KV GSS Dharha Chatra
Installation of Six nos hand pumps with solar submersible pump Staging platform and drainage arrangement at different locations of Dhadhu Bhageya and Dumaro of Latehar Dist under CSR Work of CMPDI RI III Ranchi
Necessary civil repair works in Store room beside CCN and Store room under Compressor shed and drainage related works in the area behind E10-B TE building at E10-B TE Compound, Saraidhela ,Dhanbad.
Construction of 08 Nos. Type-III G plus 3 Residential Quarters including Internal Water Supply, Sanitary Installation Drainage, Providing Internal EI and Fire Fighting System in the campus of ICAR IARI Goriyakarma, Hazaribagh, Jharkhand
Construction of 01 No. 180 Men Barrack G plus 3 storied for GC CRPF at Musabani, Jamshedpur, Jharkhand including Internal water supply, Sanitary installation, Drainage, Internal E.I and Fans with service connection. Balance Work.
Day to day mopping, brooming and cleaning work of PO office area, workshop open area toilets and drains of old Piparwar offices, excavation workshop, E and M workshop offices and its connected shops areas, canteen, pump section etc including other a
Day to day mopping, brooming and cleaning work of PO Office area, workshop open area, toilets and drains of old Piparwar offices, excavation workshop, E and M workshop offices and its connected shop areas, canteen, pump section etc including other a
Construction of Drains from behind Binod Singhs house in B Block to Pankajs house, from Imrans house to Hari Ojhas house, and in A Block behind Yogi Chauhans house, behind Ajay Srivastavas house, behind Arvind Singhs house, behind Satendra Ojhas hous
Carriage of accumulated slurry / coal from the surrounding area of fresh water pump house and its approach drains by manual labour including loading unloading and stacking and loading of stacked material to nearby suitable place for a lead less than
Providing and fixing 08 nos. RCC hume pipe (1000 mm dia) NP4 in mines and Cleaning and repairing of existing garland drains of length 2000 m at different locations in mines for monsoon preparation work under Sirka Project of Argada Area.
Construction of P.C.C. Roads and R.C.C. Drains at Various Locations from D.A.V. School to No. 3 Bungalow and Adjoining Areas of Jamadoba Dumri, including Arvind Singh House, Sita Devi House, Rinku Singh House Samir Sheikh House, Manoj Singh House, Pa
RCC DRAIN IN W.NO 09 SASTITALLA TO WARD NO 10 JUDGE COLONY CULVERT VIA MINI SAROJ CINEMA AND IN WARD NO 08 and 09 FROM TOWER CHOWK TO AJANTA CHOWK WITH SOLAR LIGHTS AND PATHWAY UNDER NAGAR PANCHAYAT JAMTARA
Construction Side Drain under Sr.DEN.5 - 1.9 km in section KQR-MMD -1.9 km (SL).
Construction of RCC drain along periphery of Lohandia rehab site (Sarju Group) L-400 Mtrs.
Construction of catch drain and quarry boulder fencing along the mines of Gidi C Project
Construction of BT road Drain from Radha Krishna Mandir to Gandhi chowk under Nagar Parishad
Construction of R.C.C. drain with culvert North side of Reliance section quarry under Kapasara OCP.
Construction of RCC Drain and Slab from Old DAV School to NH 75 (Part-1)
Construction of RCC branch drain at Lohandia rehab site, under Rajmahal Area (L-550 M).
Cleaning of garland drain at South side of Nirsa OCP under Lakhimata Group of Mines.
Renovation of Main drain Situated at 100 unit Qtrs South Balihari Colliery under PB Area
Construction of RCC drain from Panchyat Bhawan to towards Harakha village at Lohandia rehab site.
Renovation and heightening of brick masonry drain dump side along light vehicle road under ROCP.
Cleaning and repairing of drain of LCH Colony Mohan Nagar under Dakra Project, NK Area.
Construction of RCC main drain at Naya Bhorai (Pradhan tola) rehab site. (L-210 M).
Construction of RCC Drain and slab in shree nagar colony namkum under Ward No-47
Construction of RCC Drain at Neem Chowk infront of Devi Mandir under ward No-29
Construction of RCC Drain from Noor Nagar road to Noor Maszid under ward No-21
Repairing, heightening and cleaning of drain near DH-4 area at RCHP under Rajmahal Area.
Repair and maintenance of well and drain at PSB-2 at Tetulmari under Sijua area