Loading…
Loading…
33,079 results • Best match
Regarding the laying of a new drainage line in place of the damaged drainage line in South Gadarkhedi under Zone No. 01, Ward No. 09.
Regarding laying of new drainage line in place of damaged drainage line of Nandan Nagar, Nageen Nagar Colony under Zone No. 16 Ward No. 03.
Replace the dilapidated drainage line with a new drainage line in the lane of Nayapura near Bholenath Temple under Zone No. 20, Ward No. 06.
Under Zone No. 22, Ward No. 36, lay a new drainage line on Rewa Farm main road and connect it to the main drainage line.
Regarding laying new drainage lines and cross pipes in place of damaged drainage lines at various locations within Ward No. 73, under Zone No. 21.
Renewal Of B.T. Road At Rota Nala To Hanuman Mandir Road Ward No 02, Petrol Pump To Rota Nala Road 04, Rani Durgavati To Agrawal Store 04, Lakhnadoan Under Kaya Kalp Abhiyan
Construction Work of C.C. Road and Drain at Alija Bagh Colony Isthit Girja Ke Pass ki sadko par C.C. Road and Nali Nirman Kary Ward No.34 File No.759/25X3/6.2nd Call.
CONST.OF DRAIN AND C.C ROAD AT MALIPURA GALI AND DAUD GALI TO HAWA MAHEL GALI WARD NO.21 Z-02
CONST. OF RCC DRAIN AT WARD NO. 03 JAMA BAI HOUSE TO SUKHRAM NINORIYA HOUSE KHILLIKHEDA OBAIDULLAGANJ, DISTT. RAISEN
earthwork (silt removal) from CD U/S and D/S Nallah At chain 2141,2161,2223,2265,2203,2386,2283 and 2107 of Tawa Left Bank Main canal.
Provide and laying drainage line from treasure township mainroad to bijalpur kanya vidhyalaye at zone 13 ward 78.
Construction Of CC Road and Drain iin sonu kirana bali gli or anay gli me ward 07
Construction of C C Road And Drain At Ward No. 70 Zone 11
De-silting and cleaning of nallah, check-dams and cleaning of area around bunkers by mechanical means as a measure to prevent coal dust particles and other industrial waste mixing with rain water flowing in nallah through the mine at Tawa Mine, WCL
REDEVELOPMENT WORK OF BOUNDARY WALL, PROVIDING AND FIXING OF INTERLOCKING PAVER BLOCKS, CONSTRUCTION OF DRAIN AND OTHER WORKS AT SANJIVNI CLINIC, NEAR SHIV MANDIR, NEAR PATEL BABA CHABUTARA AND NEAR VINOD GOUD HOUSE,SEVANIYA GOND WARD 26 ZONE 21
Construction of platform as per unicef design and other miscellaneous work Taking out and lowering of handpump concrete block over dry tube wells and Filling moorum, Construction of drain pit and sokage pit as per requirement in different villages
Construction of Drain from Ashish Agrawal to Nagesh House and Construction of Road from Rajendra Sharma house to behind Girls hostel and Construction of Park Boundary Wall in-front of Girls Hostel in Jayprakash Ward, Nagar Palika Parishad, Kareli
WARD NO 8 JANKI SE MAIN ROAD TK RCC NALI NAINPUR MANDLA
Provide precast cover on open drainage at various places of zone 12 ward 59. Second Call
Const.of C.C.Road and drain ward No. 18 back side Bank of india
Const.of C.C.Road and drain ward No. 12 jitendra prajapati to Bhura chaki
CONST.OF RCC COVERD DRAIN WARD 08 FROM GUDDA RAJAK TO DHOBI GHAT
SDRF PROJECT- CONSTRUCTION OF RCC DRAIN IN WARD NO.14 AND 15
Const.of C.C.Road and drain ward No. 11 kamal prajapti to kalesh khare
Construction Of RCC Drain In Ward Number 03 Shishu Mandir ke Piche
CONSTRUCTION OF RCC DRAIN WARD NO 9 LALAKHEDA CHOURAHA TO SHAMSHAN GHAT
Construction of PCC drain Naseema Madam To Main Road At ward 1
CONSTRUCTION OF RCC DRAIN NEAR KARAMVEER NAGAR PARK W-66 Z-15.
CONSTRICTION OF RCC DRAIN AT MURLI NAGAR STREETS WARD 78 ZONE 17
Construction Of CC Road and Drain in Aawasiya Colony ward no.01
Construction Of CC Road and Drain in Various Places ward no.02
Replace destructed drainage line by new line banganga street no 1infront of house no 78/1 at zone 4 ward 10.
Replace destructed drainage line by new line freeganj located house no 22/1 to frreganj sq at zone 4 ward 10.
1. Construction of drain from Ward No. 09 Jhari Road to Bhatan River 2. Construction of drain from Ward No. 07 Maitar Mohalla to Masjid 3. Construction of drain from Ward No. 07 Subhash Chowk to Masjid
CONSTRUCTION OF SURFACE DRAIN AND PARK DEVELOPMENT AT GANESH NAGAR WELLFARE SOCIETY W-53 Z-13
SURVEY OF KANHARNALLA TANK PROJECT BLOCK-PARASWADA, DISTT. BALAGHAT
Providing and laying new sewer line from barkhedi nallah to 450KLD STP plant, under Zone 21
construction of nali c c and paving blocks behind 1250 market w 31 z 07
CONSTRUCTION AND FIXING PRECAST SLAB OPEN DRAINAGE AT MUNICIPAL AREA
construction of cc road and rcc drainage at ward 08
Construction of Drainage and chamber mandi yard no. 02 Dewas
Strengthening of existing drainage system near weighbridge at Nigahi Project
Construction of Cross Drainage on Marwad Road, Bhadwasa, Janpad Badod
Maintenance and leveling Drainage system At Krishi Upaj mandi Ujjain
Drainage construction work at various locations in Ward No. 29.
PROVN OF NEW SEWAGE AND DRAINAGE SYSTEM AT MCTE, MHOW
REPAIRING VARIOUS C. C. DRAINAGE WARD NO.- 06 TO 10
NEW DRAINAGE LINE AT NEW BUILDING MENTAL HOSPITAL BANGANGA INDORE
CHAINGING OF DRAINAGE LINE AT CANCER HOSPITAL INDORE IIIRD CALL
REPAIRING VARIOUS C. C. DRAINAGE WARD NO.- 11 TO 15