Loading…
Loading…
18,548 results • Best match
Imp of Road Paver Block (with Cement Concrete) and RR of drain Ratha Sahi Const of Drain towards Boding Sahi , bada Sahi Road
Construction Of paver Road with drain at Pattanaik Colony Branch and Construction of Of Drain At Tulasi Nagar ,Ward No. 01,NAC Chatrapur
Construction of RCC drain with cover slabs from Paria Mallick house to Rudra Hospital side main drain at Badheisahi in Ward No.58.
Const. of drain at Gandhi Nagar 5th line west side ( near Spectrum Colony west to maruti vihar main drain in w. no. 20
Construction RCC Drain from Revenue Plot no 225 to existing culvert at Lane no 3 of Jaydev Vihar on Main drain no 4
Making effluent concrete drain (520m) from MQ-260 towards MQ-191 and providing intermediate drain besides Fish Market, Dera Colony under Talcher Colliery.
Construction of RCC drain and partly road from Sabitri Temple side main drain towards Tapan Behera house at Bankasahi in Ward No.12
Reconstruction of drain and widering of drain at Nua Sahi Friends Colony and backside of LIttle Star Play School in Ward No. 39
Construction of CC Drain from Shyam Tarei s house to the railway drain near Jagulai Temple at Patana Sahi in Ward No 07
Construction of RCC Drain and Required culvert of main drain No 5 from Mali Sahi Chaka to Railway Bridge (RD475.00-RD 900.00 mtr)
Construction Of Paver Road and Renovation of Drain at Sankar Matha Sreet , Renovation of Drain at Samrajayapea Srreet , Ward No - 10,NAC Chatrapur
Construction of RCC Drain from Mayadhar Sahoo Res to N.H-57 drain through Gangadhar Moharana Res in Ward no. 10 of NAC Daspalla
Construction of RCC boxcell drain for main drain no-7 at New Forest Park, Jagannath Temple road from Plot no 1529 to 1546
Construction of Paver road with drain and reparing of damage drain from Saraswati Sishu Mandir Scchool to Roy Babu house Ward no-19
Construction of CC Drain with Cover Plate and Culvert from Batakrushna Panda House to main drain in Ward No. 6 Of NAC Odagaon.
Cleaning of existing drain and cutting of Kuttcha drain before monsoon at Mine No. 02,03 and 04 under Orient Sub-Area,Orient Area .
Construction of RCC internal drain with cover slab at Khandagiri Vihar Lane-3 to connecting Drain near PH tank in ward no-49
Cleaning of existing drain and cutting of Kuttcha drain before monsoon at Mine No. 02,03 and 04 under Orient Sub-Area,Orient Area .
Construction of RCC Drain with Cover slab and Culvert from Ganesh Mandap to PWD Drain and Towards jail Square, Jharpada, ward no 33
CONSTRUCTION OF CC DRAIN WITH COVER SLAB FOR UNCOVERED DRAIN FROM POST OFFICE TO BAGHA SAMANTA FIELD IN WN -12 OF RANPUR NAC
Const. of CC Drain and Cover plate from SuvenduPattnaik back side to connected to Road side Drain (Phase-02) at ward no. 04
Road,Drain and Culvert work
Drain with cover plate work
Drain with Cover Slab work
IMPROVMENT OF ROAD AND DRAIN
Repair to HL Bridge over Pipal Nallah on Kamthana to Ghusrigudi road Road Repair to bridge such as minor repair to railing, wearing course etc and painting along with repair to both side approaches At 3.500 km
Providing fencing with barbed wire stretching along Phullizore Nallah (Near Quarry No.03) through boundary of Quarry No.04 (Near villages Luhurapada, Bangamunda and Sahajbahal) to wheel washing system of Lakhanpur OCP at Lakhanpur Area (Total Length-
SR to Bridge over Ichhapara Nallah on PWD road to Ichhapara road Minor repair such as repairs to railings,deck slab etc. Signage, Painting and repair of approach road under Muribahal Block for the year 2023-24
SR to Bridge over Bagbahal Nallah on PWD road to Bhuslad road Minor repair such as repairs to railings,deck slab etc. Signage, Painting and repair of approach road under Bangomunda Block for the year 2023-24
Minor repair, painting, installation of asset board, other sign boards, repair of bridge and approach road for the work- Const. of Bridge over Ghagarajore nallah at 3rd km on Tureikela to Badabanki for the year 2021-22
Construction of Proposed Bridge over Local Nallah (Baldajor river at 4 in Km. in between Taprang to Sankus road in the district of Kalahandi road under Biju KBK Plan in KBK districts for the year 2021-22
Construction and Maintenance of Karlamal to Kapani road with Bridge over Local nallah at 6th k.m on Karlamal to Kapani Road (3X10.77m) Open Foundation in the district of Bolangir under MMSY-TRIP for the year 2023-24
SR to Construction Bridge over Khagsa Nallah on Khagsa to Salepada road Minor repair such as repairs to railings,deck slab etc. Signage, Painting and repair of approach road under Tureikela Block for the year 2023-24
Construction of H.L. Bridge (Box Cell Bridge of 4/87m) over Khejuria Nallah at 14/300 Km on Baripada Chitrada Amarda railway Station Road in the District of Mayurbhanj under State Plan for the year 2023-24.
MRL-27 NH-220 at Kaduani to PWD road via Ghadadega, Bargimara and Bhagabandhi (OR-21-905) and Bridge over Local Nallah at 3rd Km on NH-220 at Kaduani to PWD road.(OR-21-LB-47)
Repair to Bridge over Dihasahi Andhari Nallah at 0.800 Km on Padhiaripally to Nuaragadi Road Road Repair to Bridges such as minor repairs to raillins, etc. and paintings along with repair of bridge approachs At 0.800 km
Construction of H. L. Bridge over Kharla Nallah at 5.900km on Sarigihi river ghat to Mahuldihi Dangahat road via weekly market Chhak, Panchamukhi Chhak, Badheipada Chhak and Mohanty Pada in the District of Sambalpur under NABARD Assistance
Repair to Bridge over Bagbahal Nallah on PWD road to Bhuslad road Road Colouring, cement washing, Stone pitching,Approach road repairing,Fixing of Guard posts etc At 1.500 km under Bangomunda Block for the year 2026-27
Repair to Bridge over Local Nallah at 0.800 km on MPV-36 to MV-72 P.S. road Road WMM and BT Work in Approach road, stone pitching, Re-fixing of guard post and painting At 0.800 km
Repair to HL bridge over Jamuna Nallah on Kendumundi to Laitara road Road Colouring, cement washing, Stone pitching,Approach road repairing,Fixing of Guard posts etc At 0.300 km under Titilagarh Block for the year 2026-27
Construction of Bridge over Kokolaba Nallah at 0.700 Km on PWD road from Budhasalua on Kandha Sarala road in the District of Ganjam under Setu Bandhana Yojana (SBY) for the year 2024-25 Span 3 x 25.36m)
Shifting of 11 KV Line from the work site Construction of HL Bridge over local nallah at 0/350 Km on PWD Road to Goluru road Building vide Lr. No. 1820 dt. 26.05.2026 of SE, R.W.Divn. Sunabeda.
Earth work and structural work
work
WORKS
Works
Works