Loading…
Loading…
10,007 results • Best match
Providing temporary protection by providing E.C Bags revtement to save C-land and village abadies of village Gurchak on left side of river Ravi US and DS of Tstud US of spur No 1 in Dharamkot Complex in Distt. Gurdaspur
Repair strengthening and bringing to design section of Markanda Bundh from RD 0 to 34000 before the flood season 2023 to save nearby abadies and Agricultural land
Estimate For clearing chocked bed of Ghagger River from sedimentation/aggradation from RD 25550 to 26700 to design specification to protect villages Manoli surat etc distt- SAS Nagar from floods and disposing off surplus material Dist.SAS Nagar
Providing Series of studs to save C Land and village abadies of village Rampur Talwara in Shri Hargobindpur Block on right side of River Beas in Distt Gurdaspur
Construction of revetment and repair of T studs to save the C Land and village Abadies of Village Gurchak on left side of River Ravi in Dharamkot Complex
Clearing weed carpet grass elephant grass booty water hyacinths sarkanda tripidium bengalense silt and obstruction etc from the bed and side slopes of Sirhind Choe in between R.D 483000 to 419130
Stg of Pachisdara Bundh with EC bags filling of Gharas with good earth in between RD 2000 to 23000 to save nearby abadies and agricultural able land
Clearing weed carpet grass elephant grass booty water hyacinths sarkanda tripidum bengalense silt and obstruction etc from the bed and side slopes of Sirhind Choe in between RD 483000 to 547000 near vill Badauli Ambemajr Shekhupur Sirhind city Di
Repairing of 3 No Studs left side along with repairing bed bars of vill Sirkapra bridge on River Ghaggar Repairing of Bstone crated bed bars and providing and Laying RS LS Bstone crated Apron Pitching on U
Repairing of 3no studs Studs on LS of river Ghaggar and repairing of bed bars of VR Bridge at Village Sirkapra to save the nearby abadies before the flood season of 2023
Reparing of Bstone crated bed bars and providing and Laying RS and Ls Bstone crated Apron and Pitching on US and DS of vill Maru bridge on River Ghaggar
Providing temporary protection with Bamboo Screens to save C-land of village Tash and Kajle on R/s of river Ujh.
Construction of revertment on river Ghaggar at village Marhu to save nearby abadies and agricultural lands before flood season of 2026
Clearance of weed jala sarkanda booty etc obstruction from the bed side slopes of Jhambowali Choe in between RD 50000 to 62250
Desilting and removal of River Bed material from village Gurchak Gunia of R Ravi RD 0 to 457 mtr to from potential flooding and erosion. (Site 3A) Distt. Gurdaspur
Raising of Existing bridge slab on Miranpur Choe at RD 116800
Repair work of Bed bars and protection of abutments of VR Bridge at Village Memadpur and Providing and Laying Bstone crated studs along with Bstone Apron and Pitching on LS of River Ghaggar near Gurudwara Sahib of vill Sarala Khurd and Maru before th
Emergent Plugging of Breach and Restoration of FPE Main Dhussi Bundh near RD 129000 near village Thetherke near Dharamkot complex on left side of River Ravi in District Gurdaspur
Desilting on right side of river Sutlej creek bandh near village Kawan wali in District Fazilka. Dist.Fazilka
Estimate for Desilting of River Sutlej from village in between Bella Karkhana to Phassa to protect nearby abadies agricultural land of tehsil Chamkaur Sahib in Distt Ropar
Providing Temporary Protection By Providing E/C Bags Revetment U/S Spur RD 29000 For The Safety Of Studs And Existing Spur And C-Land Of Village Tarpur/Marara On Left Side Of River Ravi.
Desilting of river ghaggar in village Shatabgarh and Bakarpur to protect nearby abadies and agricultural land. Dist.SAS Nagar
Providing EC Bags studs and revetment to check erosion of village Fattu Barkat on right side of river Beas.
Removal of Weed Jala booty and slush from the bed and side slopes of Mirapur choe in between RD 156300 to RD 100000 in Patiala divison
Providing Revetment and Restoring Spur D s of Thakurpur Spur L s of River Ravi to save Border Post Border Fencing Wire and C Land in Thakurpur Complex in Dist Gurdaspur
Providing series of T studs to protect the c-land of village Fatta Kulla on Right side of river Beas.
Providing studs near Village Bahadurpur Rajoa on right side of River Beas in District Gurdaspur
Clearing weed booty sarkanda silt and obstruction etc from the bed and side slopes of Sirhind Choe in between R.D 418630-347000 near vill bazidpur kaul dhingi ladhaheri and and tungan Tehsil Nabha District Patiala before flood season of 2026
Flood Risk Mitigation for River Ravi under Jurisdiction of Executive Engineer Gurdaspur By Restorig Armed Spur Originating from Main FPE Along the Bank Near Village Marara and Makura
Flood Risk Mitigation of River Edges between RD 0 to RD 9300 in Adhian section and River Ravi Edge between RD 1000 To 7000 in Makora section of left side River Ravi in District Gurdaspur
Emergent plugging of breach and Restoration of FPE Main Dhussi Buundh near RD 108000 near Kartarpur Corridor on left side of River Ravi in Dist Gurdaspur
To collect the topographical data with LiDAR and prepare DEM along with bathymetric and hydraulic data along with structural data and preparation of DPR Detailed Scope of Work is attached
Construction of V.R bridge at RD 309600 of River Ghaggar in village ballanwara Tehsil Sardulgarh Distt. Mansa
P/ROVIDING DRAINAGE SYSTEM IN VARIOUS STREETS AND LAYING CC FLORING IN STREET NO. 17 OF MOHALLA KAMALPUR ,WARD NO. 41, HOSHIARPUR (Reso No. 50 (59) dated 19.07.2021)
Provision drainage cover from RP Gate to behind Cook House at Inf Bn-II and Provn of parking shed near Bldg No P-61 at Mil Stn Abohar
Supplying and Carrying out the work of painting in various Galleries i.e. L S and R S Drainage galleries and foundation gallery of Main Dam at RSD Project.
Repair of tile and drainage Issapur Firni Road , Dera Jagadhari Firni road, Near h/o Pala Thekedar , Jattan Mohalla near Khera , Near H/o Fakir chand w.no.17
Under Water Sealed Chest Drainage System (Container) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Under Water Sealed Chest Drainage System (Container) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Foley's Rubber Catheter (for Prolonged Urinary Drainage) Conforming to IS 11497 (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Clearance weed(carpet, grass , elephant grass), booti (water hyacinths), sarkanda (tripidium bengalense), silt and obstructions etc. from M.C.M Drain in between R.D. 108000-78000 near village Manemajra, Kiri Afgana, Khanpur, Katlaur etc Tehsil Ropar
Estimate for Construction of Revetment on R/S of Mansoli Drain in B/W R.D 7000-7500 to save the abadies and C/land of village Gunu majra, Lodimajra etc Tehsil Ropar District Ropar.
Estimate for const. of street and drain Partap colony city rajpura
Const of Street and drain in village choundhary ward no 3
P/L Rcc pipe under drain ghumiyara wali street wardno.11
Interlock Tiles and drain closure of Gali Jasvir Singh Committee Wale
REPAIR AND CONST.OF DRAIN VERIOU PLACES NP KHANAURI W.No 1-13
P/L Paver and Drain Near Swaraj Nagar Ward No.16
Annual maintenance of roads , parks and drain in wd no -40
Const. of drain and Pullies in Moti Bagh Ward no. 23