Loading…
Loading…
5,362 results • Best match
T.A. road to RadhakrishnaMandir, Gamaibari Panchayat ofc to RupacherraGP along canal side, BharatRatna club to TA road via SaktiSangha, T.K. road to Budhai Sanashyi para, Budhai sanyashi para to TK road via Ganierbil, Cremation ground to GM road
Construction
Mtc. of Bankarghat road (L-1.00 km) under Gandacherra Sub- Division PWD (RnB)during the year 2021-22 / SH- WBM 3, carpeting, tack coat, Seal coat, side shouldering, surface drain etc. (Portion form 0.00 km to 1.00 km).
Providing flat and edge soling on damage surface, Removal of excess soil from the shoulder, Protection of eroded portion by providing gunny bag, Earth filling and clearing of road side katcha drain, Bituminous grouting and other allied works.
231/BLG-MC/e-DNIT/2022-23
Works
EARTHWORK
Construction
Raising and widening of embankment by earth filling, Double layer soling,C. C Block,Toe wall, RCC Drain, Reconstruction of Sluice gate (Flap Shutter) along with other allied works at ch 0.80 km to 1.60 km(Group No-II)
Maintenance of road from Gandatwisa to Raishyabari road from Ch.0.00 km to Ch. 8.80 km under Gandacherra Sub-Div. PWD (RnB) during the year 2022 - 23 / SH- Patch WBM-III , Patch Carpeting, Sand Seal Coating, Surface Drain etc
Mtc. of Agartala town road during the year 2020 21 Improvement of road from NH 44 Madhya Kashipur Narayan Ghosh to Sunil Sarkar House SH Metalling, carpeting, construction of road side drain and RCC Retaining Wall Ward No 09
Works
SH- Constn. of R.C.C Retaining Wall at different spots in between Ch. 0.00 Km to 5.50 Km and Patch metalling, grouting, re-carpeting, seal coating, restoration of damaged road formation, constn. of unlined surface drain, placing of gunny bags etc.
S.H Restoration of Rain cuts, Removal of Unsuitable soil, Patch Soling, Patch WBM-III, Patch Grouting, Patch Carpeting with sand seal coat, CC Block Pitching, Placing of Wire Crates, Filling of Mixed class Brick bats, Palasiding, Kutcha Drain and oth
FDR / Mtc. of road from KMA road near Bagmara Bazar to Balaram under Ambassa Sub-Division PWD (RnB)/ SH- Repairing of road (WBM-3, Grouting, re-carpeting, seal coat, side drain etc) at Ch. 0.60 km to Ch. 1.20 Km.
SH- Constn. of R.C.C Retaining Wall at different spots in between Ch. 0.00 Km to 9.50 Km in/c patch metalling, grouting, re-carpeting, seal coating, restoration of damaged road formation, constn. of unlined surface drain, placing of gunny bags etc.
S.H Restoration of Rain cuts, Removal of Unsuitable soil, Patch Soling, Patch WBM-III, Patch Grouting, Patch Carpeting with sand seal coat, CC Block Pitching, Placing of Wire Crates, Filling of Mixed class Brick bats, Palasiding, Kutcha Drain and oth
Maintenance of Different Roads under the Jurisdiction of Lefunga R.D block area of Mohanpur Sub-Division, PWD (R and B) during the year 2022-23/SH- Patch Grouting, Patch WBM-3, Carpeting, Patch soling, Bamboo palasiding, Surface drain andGunny Bags e
Urgent mtc of road from Matabari Gas Go Down to Slab Culvert on PMGSY Road Link No.L034 under Matabari Panchayet within Matabari Block during the year 2022-23/S.HPot hole repair through Grouting,WBM, Patch carpeting,Seal coat, road side drain etc (C
Mtc. of 02(Two) nos Type IV quarter and 04 (Four) Nos type III and 01 (One) no RCC water tank and cement concrete pavement etc.
Works
Connectivity work
CONSTRUCTION WORK
Road Connectivity and upgradation
as per NIT
CONSTRUCTION