Loading…
Loading…
2,589 live940 closing this weekmost from Directorate of Local Bodies UP and Meerut Municipal Corporation Meerut UP
2,589 results • Best match
TENDER NO.(15) WARD NO.39 KE ANTARGAT SANJAY LITORIYA KE PAS AVAM THE BARWAR SHOP KE PAS AVAM AMAN AATA CHAKKI KE PAS AVAM MATA MANDIR KE PAS AVAM KALLU SAHU KE PAS AVAM AAMIR KE PAS AVAM MOHAMMAD ANAVAR KE PAS AVAM MAI SAV MASZID KE PAS NALI PULIA A
Construction of drains and CC roads in Ward No. 03 (Ambedkar Nagar) from Arvind house to Jai Prakash house.
Construction of P.C.C. Road and Drain from Vikas Telecom house to near about Kunwa in Ward No. 04 Ashok Nagar at Nagar Panchayat Moosanagar, Kanpur-Dehat.
Construction of a CC road and drain from Rangilal Chauraha to Agarwal Sabha in the Khairullah Shah and Dori Lal locality (Ward Nos. 14 and 26).
Supply and fixing of Air Valves Sluice Valve and Construction of NHAI Drain Duct including other appurtenant works under 50cusec and 100cusec Water supply scheme Ghaziabad
Construction of a new RCC minor protective structure (3x5x3 span) over the drain and a new approach road on the Narayanchak Link road in Amethi district
Construction of a concrete road and drain from Amarnath Gosai s house to Pathak Ji s house behind Ward 12, Sithaura Balaji Temple. (M.L.A-Cantt. Area)
Construction of a CC road and covered drain in Ward Poorebadal, extending from the main Subeha intersection to the Bholenath temple within the police station premises
Construction of a drain and a CC (cement concrete) road in Ward 02 (Jaswantnagar Paper Mill area), extending from Bijendra Singhs house to Goma Gujaratis house.
Construction of a drain and a CC road from the house of Lavkush Garg to the house of Jagmohan Aneja in Ward-35, Guru Nanak Nagar.
15.Construction of CC road, drain, and slab from Manoj house to in front of Boss Gym in Radhe-Radhe Colony, Tulsi Adda, Ward No. 13.
Construction of road with drain and cement concrete from Nanak house to Karan Singh house in Ward-10, Partapur Railway Gate, Bamba Road, Shyam Vihar Colony.
Construction of a drain and a CC road in Ward-12, Surya City Lane No. 4 spanning the area from S.K. Saini house to Pradeep house.
Construction of a CC road and covered drain in Ward Chaughariyan East, extending from Firdous Tailors, past Sagir Master house, up to Mahmood Ahmed Siddiqui house
Construction of C.C road and drain from Welcome gate of Jalalabad to H/o Pradeep Moh- Islamnagar ward no,05. At Nagar Panchayat Jalalabad, (Distt-Bijnor)
Construction and Maintenance of Interlocking Tiles Road and Drain from Bechelal Pal house to Rajesh house in 10 Balaji Dham at Nagar Panchayat Moosanagar, Kanpur-Dehat.
Contruction of Interlocking road and drain from House of Ismail to Imambada at Moh - Shekhan in ward no - 01, 08 at Nagar Panchayat Sahaspur, Distt-Bijnor
Construction of Interlocking road and drain from house of Molana Iftekhar to Madarsha at Moh- Afganaan in ward no-09 at Nagar Panchayat Sahaspur, Distt- Bijnor
Construction and Maintenance of Interlocking Tiles Road and Drain from Ashok house to Binda house in Ward No. 02 Gandhinagar at Nagar Panchayat Moosanagar, Kanpur-Dehat.
Annual Maintenance of Roads, Surface Dressing, Road Cleaning and Drain Repairing at I.A. Sikandrabad Site-A, Site-B, Site-C, EPIP and Foundary Nagar Distt- Agra.
Construction of an RCC drain on Tehsil Road eastern side from Rajesh Tripathi house to Suraj Gupta house in Ward No 8 of Nagar Panchayat Sahjanwa.
Construction of an RCC drain from Pradeep Kannaujia house to the area in front of Thuthwa Baba Temple in Ward No 2 of Nagar Panchayat Sahjanwa.
Construction of a CC road and drain in Ward No. 25 Mohalla Harnatkiya/Rustam Tola, extending from Bhure Mulla Ji house to Sannu Hafiz Ji house.
Construction work of road and drain from Shyam Babu Singh house to Baba Sonkar Ji house in Mohalla Vakil Nagar Barasirhi under Zone-6 Ward-19.
Construction of an interlocking tile road and a drain from Molvi Khalid of house to Umar of house in Ward No. 15 of Nagar Panchayat Harra.
Ward No. 19 Construction of a CC road and underground drain from the Ramkola Kasaya Road via Maa Kali Sthan up to the Basaia link road.
Road and drain improvement work from the house of Anaadi Kushwaha to the house of Ramprakash Kushwaha behind Ramlala School under Zone-06 Ward 60 Rawatpur.
Construction of an interlocking tiles road and a drain from the distributary bank to Chaudhary Bashir Khan College in Ward No. 15 of Harra Nagar Panchayat.
work of retaining wall soil filling new drain cover and interlocking from om shankar house to near bharat kesherwani house in gokuldham colony in bathua ward.
in purani dashmi ward no 17, from bihari pehalwan house via rajaram house to ramchandra prajapati house work of drain cover and c.c on both side.
Construction of a CC road and drain from Malti Rajput house to Rajaram Sahu house in Ward 01 Sikandarpura (Length 140 m Width 3-60 m)-
Construction work of CC road and RCC drain in Ward No. 13 under Nagar Palika Parishad Suar, from Mohabbat Nagar Road to Afsar Ali Miyan house.
Ward 2 Pansariyan Construction of cc road and drain from house of sada mistry to sajid intezar to abdul hakim mehtab to anish isam to firoz
Work of drain and CC road from B-40 to B-45 and B-45 to B-52 in B-Block, Ward-96, Nehru Nagar-II.
Construction of CC road and drain from the house of Mr. Ilyas to the house of Sundar and in Irfan Wali Gali in Ward-93, Kaila.
Construction work of RCC drain and CC road from Smt. Chandravati Devi to Rampal Sharma, Bhula Pandit to Shanti Devi house in Ward 04 Mata Colony.
Construction of CC road and drain from B-10 in front of B-205 to B-137 in B Block, Sector 11, Ward 55, Pratap Vihar.
Improvement work by RCC drain and CC on A-482 to A-513 Shri Shiv Shakti Traders (Service Road) in Ward 55, Pratap Vihar Sector 11.
Construction of CC road, tiles on side track and drain from Ambedkar Road N-45 Nehrunagar Nagar II to Bijendra Rajput (239) Ramnagar in Ward-88.
Construction of RCC drain and improvement of side track from Yashoda Marg God Heights to in front of Krishna Bhawan in Ward 77 Vaishali Sector 4.
Work of drain and interlocking tiles from Balaji Tent House to Satish house and from Raju house to Hrithik house in Ward 16, New Gadhi Colony.
In Ward 53, Raispur, from Virendra house to Satveer house, from Satveer house to Harendra house, work of drain and CC road in Ramprakash Wali Gali.
In Ward 42, Munshi Harpal Colony, work of drain and interlocking tiles from Santar Singh house to Mahendra Mukhiya house, from Budhpal house to Padam house.
In Ward 46, Duhai, work of drain and interlocking tiles from Deshpal house to Jitendra house, from Indrapal house via Kiran Pal house to Kripal house.
Repair work of damaged lanes in Gali No. 01 and Gali No. 02 in Jai Bharat Enclave, Ward 60 Shyampark Main by constructing drain and C.C.
In Ward-17, Hindon Vihar, from Shabbir Khan to Bablu house and Sarfaraz Wali Gali and Haji Sagir Wali Gali, work of drain and interlocking tiles.
Improvement work by laying RCC drain and interlocking tiles in Dhanpat Wali Mange Wali and other damaged lanes in Chitrakoot Colony of Ward 44 Sanjay Colony.
Construction work of drain and interlocking tiles from Satveer house to Neeraj house and from Praveen Tyagi house to Awadhesh house in Ward-31, Radhakunj-III.
Construction of CC road and drain from Sukesh Bhalla Advocate to Mother Dairy via Babulal Mandir Chowk in City Zone Ward-33, Sarayanjar Ali Purva Hiralal.
Repair work of drain and CC in the damaged lane of Jitendra Tyagi and Balaji flour mill in Jai Bharat Enclave of Ward 60 Shyampark Main.