Loading…
Loading…
2,589 live1,113 closing this weekmost from Directorate of Local Bodies UP and Meerut Municipal Corporation Meerut UP
2,589 results • Best match
In Ward-31, Giriraj Nagar, construction work of drain and interlocking tiles from Dinesh Tyagi house to Narayan Tyagi and from Sanjay Sharma house to Surendra house and in front of Mangepal house.
Construction of CC road and drain from C-294 to Balaji Mishthan Bhandar, C-327 to C-322 and C-135 to C-142 in C Block, City Zone, Ward-52, New Panchvati.
Construction of RCC drain in Ward No 12 extending from Amit Sharma house near Kanwar Singh Crossing passing by the residences of Nandlal and Radhakrishna to the area in front of Vikas Bhawan
KASBA CHHAPRAULI WARD NO 07 MAI PRA . PA. NO 02 SE BADRAKHA ROAD PER SHIV MANDIR KE PASS ISTHIT TALAB KI PULIYA TAK R.C.C. NALA NIRMAAN KARYA
Construction of a CC road and drain in Ward-Paliya, extending from the houses of Balkaran and Kirsan Gautam, passing by the houses of Ramkumar, Hansraj, and Devnath, up to the house of Brijlal
Construction of a drain and a CC road in Ward-60, Nehru Nagar, Lane No. 1 specifically from Dr. Anubha Tyagis house to Sethis house, and from Rajesh Kumars house to S.S. Tyagis house.
Construction of a CC road and a drain in Ward Jailbani, extending from the toilet near Pankaj Tiwari place, passing through the fields of Brahmanand Tiwari and Ramsevak, up to the Durga Puja site
Construction work of 2 X 5 X 5 m Box Culvert and approach road over the drain near Maurya Basti, Yadav Basti and Junior High School on the Vibhannamau Road in Development Block-Jalalpur.
Improvement work of road by laying drain and interlocking tiles from Alok Katiyars house to Yadav jis house via Rajneesh Awasthis house in Mohalla New Ashok Nagar under Zone-6 Ward-35 Kalyanpur North.
Improvement work of road by drain and interlocking tiles from the house of Smt. Shakuntala Devi to near the house of Bablu Gaur in Mohalla Ashok Nagar under Zone-6 Ward-35 Kalyanpur North.
Construction of CC road and drain from Kamlesh to Jai Durga Kirana Store, from M.No.-220 to Dinesh house, from Rajneesh Sharma to M.No.-214A and from Ramgopal to Godrej in Ward-88, Ramnagar.
Construction of an RCC drain with covers on both sides side footpaths, and a CC road in Ward No. 08 Defence Colony Behat Road extending from Tip Top Hair Salon to 1 Step School.
Construction of CC road and drain in Chhotu Pandit street and in front of Arihant and Gupta ji street at Ward-59, Old City Dasna Gate.
WARD 12 NAKCHED KE GHAR SE PRASADE KE GHAR HOTE HUE GURUDEEN VA RAMDEV VISHWAKARMA KE GHAR TAK INTERLOCKING AND BHUMIGAT NALI NIRMAN KARYA
Ward no.-13 me Moury Samaj Bhavan se lekar Transformer ke pas sthith nale tak khadpathar mukhya marg par r.c.c. nali ka nirman karya
Construction of a CC road and covered drain in Ward Patti Mohalla Badi Tikuri along the Mallahanpurwa connecting asphalt road stretching from Vishal house, past the houses of Puttan and Kalyan, up to Ramavatar house
Construction of a CC road and drain in Ward No. 52, covering the stretch from Bhopal Singh Road passing by the Shiv Mandir, Gopal Provision Store, and the mosque to the lane housing S.K. Tailors.
Construction of a CC road and covered drain in Md. Mallahanpurwa (Ward-Ninduri)starting from the temple near Mata Badal, passing by the houses of Ramraj and Jagjeevan, and extending up to the primary school
Ward 77, Lakhhipura, Lane No. 18/6 Drain repair and CC road construction work from Islamuddins house to Ikramuddins house, from Ikramuddins house to Bhuras house, and in the lane known as Latif Wali Gali.
In Ward-82 Ahmednagar, construction of road through drain and CC from house of Haseen Moania in Gali No. L-02 to house of Mobin Raddania and on Gali No. 03 Asif Ansari Wali Gali
In Ward No. 7, Surtihatta, construction work including RCC drain cover from Bablu Soni house in Nirmali Kund Dalit Basti to the water tank, Nirmali Kund Gate, Central Bank Square and up to Mehdawal Road.
Construction of a CC road and covered drain in Ward Malinpur (Mohalla Babapurwa), extending from the house of Amarnath Yadav, passing by the houses of Bhikharilal Yadav and Suresh, up to the Kali Mata Sthan
cross pipe chamber repair from formar councilor bambam house to rinku yadav house in bhaisahiya tola in south sabri ward and new drain and cover work on both sides of the road in jaiswal colony.
Construction of a CC road and RCC drain in Ward-Kothidih, extending from the house of Satyarth Shukla (KD-2134) passing by the house of Vijay to the house of Avadhesh Kumar Sharma (KD-2127).
Construction of 03 shops near the temple on the northern side of Sagar Talab (Rath) in Mughalpura-2 (Ward 08) along with RCC slab work over the drain installation of benches and CC repair work-
Construction work of RCC drain and CC road from the corner of Ma. Ambedkar Park to Noida Commercial Bank and from the corner of the park to Munna Khan shop in Ward 04 Mata Colony.
In Ward-43 Kadkad village, from Veer Singh to Vidya Niketan School, from Veer Singh Rawal via Ranjit Rana to Maharana Traders, from Maharana Traders to Ashok Rana, construction work of drain and CC road.
Ward-12, Atmaram enclosure, construction of CC road and drain in Masala Wali Gali from RR Garments to Gulab Singh house, Gym Wali Gali, Om Market to Sanjay Kumar and from Mukesh to Seema house.
Construction of CC road and drain from Dharamveer house to Billu house in Balmiki Basti, Ward-19, Patel Marg and in Ramesh Wali Gali, Ashok Wali Gali, Om Parcha Wali Gali and Vinod Wali Gali.
Laying of Interlocking the road between Nand Kishore Kailash Chandra College and Petrol Pump on Biswan-Sidhauli Road towards Changa field and Construction of RCC drain along the boundary wall of the school, Block Biswan
PIPE HP CYLINDER TO AC,VALVE ASSY DRAIN 1/4,ORIFICE DIA 1.3, 1/4 BSP X 1/8 BSP M,Free End Cover,BUNTY TUBE UL RR20070 OF and NON RETURN VALVE 1/8 inches
Construction work to upgrade the street and build a drain and a CC (cement concrete) road, extending from the store in Ward 35 (Gupta Colony, in the lane opposite Lal Mandir) up to Gautam Inter College.
Construction of CC road, RCC drain, and side berms from the house of Atul Dwivedi to the house of Bajrangi Bharti, and from the house of Pritam Madhi to various lanes in Ward No. 39, Gayghat.
Construction of an RCC drain and CC road in Ward No. 19, Phulwadi Nai Abadi, spanning from the soldier house to Ashok house, and from Gupta Ji house to the house belonging to the Gokul family.
Construction of CC Road and Drain work in ShankarPurva Ward-I in Bajrang Vihar Colony from Transformer to Aditya General Store to House of Shri Sidharth Dubey to House of Shri Madan Singh in Lucknow City
Construction of CC road and RCC drain in Ward No. 02 of Nagar Palika Parishad, Suar, from the house of Mehndi Hasan Narpatnagar walon, passing via Rashid Seth house, up to the front of Anwar house.
CONSTRUCTION OF 24 NOS. TYPE-III RESIDENCES STILT FLOOR TO SIX FLOOR, SUB STATION, EXTERNAL ELECTRICAL WORK, C.C. ROAD,DRAIN,INTERLOCKING.RAIN WATER HARVESTING, 16 PERSONS LIFT AND 250KVA D.G. SET AT JAGADGURU RAMBHADRACHARYA DIVYANG STATE UNIVERSIT
Construction of CC and drain work on the road from Bindra house to Mohanlal house and from Ashutosh house to Pintu Jaiswal house and from Indal house to Alok Singh house in Mohalla Bardahiya Bazaar. 04
Placement of stones on the drain and improvement of footpath from Bhuvaneshwar Dham Temple via New Speed Coaching to near Mukesh Chauhans house in Mohalla Tulsi Nagar, Rani Ganj under Zone 6 Ward 30 Ambedkar Nagar.
Interlocking tiles and drain repair work on both sides of the side track of the road from Urvashi Saree Centre to Siddharth Homes via C/70 in City Zone Ward-08, Nehru Nagar II C Block.
Construction work of drain and CC road from Ipsa Company to Praveen house, from Padma house to Balban house, from Balban to Golu Rawal house and from Praveen to Ashu house in Ward-43 Kadkad village.
Construction of RCC drain in Ward No 03 extending from in front of Samim Rain house passing by the onion warehouse Haji Shamsuddin house up to the area in front of the Late Gopal Mishra Gate
Spl repair to Qtr No 10B, 20B and 26B of Gaur Enclave under GE (West) Lucknow and Provn of Precasst Rainwater Harvesting PIT with Precast Approach Drain in Rajiv Sandhu Vihar (RSV) under GE (WEST) Lucknow
from dayal yadav to panchyat bhavn via may gali in NPA District-Maharajganj
from deepak to ramvirksh via may gali in NPA District-Maharajganj
from sanjay yadav to ramkishun maurya via may gali in NPA District-Maharajganj
Construction of a drain and a CC (cement concrete) road in Ward 34, R.K. Puram, Lane No. 04, spanning the stretch from Ashok Sharmas house to Ashok Bansals house and from Umraos house to Dinesh Agarwals house.
Construction of a drain and a CC (cement concrete) road in the lane stretching from Karmveer Singhs house to Ishwar Dayal Sharmas house, and from Sameer Trading Co. to Siddhavali Bag House, in Ward-60, Phoolbagh Colony.
Construction of a drain and a CC road in Ward-13, Uttarakhand Colony spanning the stretch from Pawan Kumar house to Ravindra Kumar house, as well as in the lane where Naveen Kumar and Amit Kumar reside.