Loading…
Loading…
1,987 results • Best match
Rewiring PMU panel, SITC of components for AMF Panel, MCCB, power contactor, Push Button, Relay, Rotary selector switch, 3 way selectro switch, MCB, Cable, on surcafe, Mosonry duct, Cabl end termination
AM for 2023-24
Ring bund,bailing out,earth work,concrete work,
REPAIR OF CANAL
annual maintenance
AS PER BOQ AND TENDER DOCUMENTS
GENERAL-AM PERIYATTUTHURA 2025- 26-Annual maintanance to VCB at Periyattuthura Kundam in Cheruthazham Panchayath in Kalliasseri Constituency, Kannur Dist. for the year 2025-26-General Civil Work
CIVIL WORK
General Civil Work
GENERAL-Monsoon preparedness-2025 - Vengoola-Urgent Desilting work of Perumbadavu thode Near Downstream side of Vengoola VCB in Eramam Kuttur Panchayath ,Payyannur Constituency in Kannur District.- General Civil Work
Kasargod Development Package Investigation Investigation Work for the Series of Checkdam Conducting Topographic Survey of Uppala River From Madanthur VCB to Kuriya in Meenja and Paivalike Panchayath Investigation Work
Solar PV module, LONGRAIL, Inverter, Monitoring Data Logger, ACDB With MCCB, Solar DC Cable, AL XLPE ARM CABLE, Earthing Kit Earthing Wire and GI Earth Strip, LIGHTNING ARRESTER, MC4 Cable Couplers, Installation kit
GENERAL-Monsoon preparedness 2025 Nagathum moola-Desilting work of up stream side of Vellur thodu near Nagathum Moola VCB in Payyannur Municipality,Payyannur Constituency in Kannur District. -General Civil Work
The project includes renovating the existing VCB at Kottanada by providing FRP shutter across Manjapuzha. Desilting,Project also includes the reconstruction of the Kotta temple road. side protection work etc
Desiltation of thodu
Annual Maintenance
As per tender documents
Indoor Court finishing, Demolition - Security Cabin, New change room, RCC Kerb, Entrance Gate, Compound wall, Chainlink Fencing, single arm, Wiring, MCCB, MCB, DBS, Earthing, LT Cable, Laying, Termination, Light Fixtures,Poles, Lift Electric, Lift
DAY TO DAY MAINT OR EPAIR TO EXTERNAL ELECTRIC SUPPLY, DG SETS, UG HT OR LT CABLES, MAINTENANCE OF DISTRIBUTION TRANSFORMERS, LT OR HT SWITCHGEAR AND PANELS, LIGHTING PROTECTION SYSTEM, SECURITY OR STREET LIGHTS AT CGDHQ-4 AND CGRA RAMESWARAM
App1. Construction of VCB 4m span at Thirunilam kaipad-(2nos) , Deepening of Adipalam Manalthodu ,Strengthening of Bund at Chootayam kaipad, Construction of Ramp (6nos) Chootayam kaipad,Deepening and widening of canals
Annual Maintenance
Desiltation
Constuction of tractor bridge maintenance etc
Desiltation
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - Sedan; Maruti Suzuki Dzire, Hyundai Xcent, Toyota Etios, Maruti Suzuki Tour S; 2019; 50, 000-75000 kms; A/C; 12
Monsoon Preparedness
Civil work
GENERAL-MI PTA -Premonsoon 2024-25 Emergency work for Clearing of Fallen trees, debris and other obstacles in various VCB 39s in various Panchayaths under MI section Mallappally in Thiruvalla Constituency General Civil Work
Reconstruction of leading channel and Kayal Deepening
Deepening works
GENERAL-Monsoon preparedness 2023- Adippalam-Urgent works required for ensuring smooth flow during monsoon through Arayolam thodu on the U/s and D/s of Adippalam VCB in Ezhome Panchayath, Kalliasseri Constituency in Kannur Dist.
Lift Irrigation
GENERAL-Monsoon preparedness 2024- Peruvalli thodu-Urgent silt removal from Peruvalli thodu for ensuring smooth flow during monsoon on the D/s of VCB at Kannom in ward no.VI of Ezhome Panchayath Kalliassery constituency, Kannur District
Monsoon preparedness 2024 -Urgent works required for ensuring smooth flow of rain water during monsoon through Karimbam thodu on the U/S of Muyyam VCB at Muyyam in Kurumathur Grama panchayath, Taliparamba constituency in Kannur Distirct.
20 WT LED Tube Light 1820 wt button, LED Bulb 18w20w, LED Bulb 7W 230V, LED Bulb 14W 15W 230V, LED Bulb 25 W, LED Tube Light 9 10W button 2, FRLS wire 6Sqmm copper Make, FRLS wire 6 Sqmm 90 Mtr roll Make, Call bell buzzer type Make, Un armed multi ... Sqmm, MCCB 250 ... Amp, MCCB 100 ... KA, MCCB 125 ... KA, MCCB 320 ... KA, MCCB 160 ...
Clearing grass and desilting
construction of pump house Repair of existing VCB at Plakkoottam and construction of side protection on both sides DR and PCC installation of pump and motor_ installation of pipe system _400 m on right bank to distribute water to cistern
Construction of VCBs and renovation works
MINI.CIR.BREAKER 3P, 125A, MINI.CIR.BREAKER 1P, 2A, MINI.CIR.BREAKER 1P, 4A, MINI.CIR.BREAKER 1P, 6A, MINI.CIR.BREAKER 1P, 16A, MINI.CIR.BREAKER 2P, 2A, MINI.CIR.BREAKER 3P, 2A, MINI.CIR.BREAKER 3P, 4A, MINI.CIR.BREAKER 3P, 6A, MINI.CIR.BREAKER 3P, ... 25A, MCCB 200A ... FOR MCCB , ...
Monsoon Preparedness Desiltation of ThannicheriKarinkuzhi thodu
Operation of shutters in thiruvallam thodu
Rennovation Works
GENERAL-CMO Portal Petition-Construction o f s i d e p r o t e c t i o n w a l l f o r Kanniyampuramthodu at d/s of Kakkathodu VCb in Ottappalam Municipality of Palakkad District-General Civil Work
Bayonet Lamp Holders as per IS - 1258 (Q2), MCCB with Thermal Magnetic/Microprocessor Based Trip Unit (Q3), Power Contactors as per IS 13947 - 4 - 1 (Q3), RCCB - Residual Current Operated Circuit - Breakers as per IS 12640 (Q3), MCB - Miniature Circuit - Breakers for A.C. Operation as per IS/IEC 60898 (Part 1) (Q2)
20KVA ups with 3 phase IN and 3 phase out with 2 hour backup at full load, 120AH 12V SMF Battery, UPS battery rack with insulated rubber mat, Parallel cable, 6W DTPN Distribution BOX, 100A Three phase incomer, 63A 4P MCCB, One Ton Air Conditioner with stabilisers, DE humidifier 8L, Installation and commissioning charges, Earthing work for UPS
Power Supply 0 to 40 KV Positive Power Supply, Power Supply 0 to 30 KV Negative Power supply, Syringe Translational Motion _ Replacement Control PCB Sensors Drive and Cables, Fitting motorized Distance adjustment Control PCB Sensors Drive and Cables, ... each, Control Panel , ...
GRAPHIC CARD, MAGNETRON 25KW, MOTOR/GEARBOX ASSEMBLY, TP MCCB RATED 250A(NSX250B), RESIN CAST CURRENT TRANSFORMER 200/5A, 100VA, CL-5P10, PF MTR 0.5-1-0.5 3 PH 1 ELMNTS 96X96MM, 240 DEGRE 415V, 5A, 5, DOUBLE V MTR 0-500V REDMARK AT 415V 96X96MM(EQ960), DOUBLE HZ MTR 45-50-55 REDMARK AT 50HZ, 415V 96X96MM(ZQ96), RECEIVER ASSEMBLY, PCB ASSY.- TRIGGER, MODULATOR PCB ASSY 10KW, PCB ASSY - 'X' BAND PSU AC
SMPS Powerplant Rectifier modular Type Input 3 phase Output 54V DC 100A Module 4 plus 1 with Rack and Remote access function like smtp for integration to IBMS set, Li ion Battery 100AH 5 nos 48 V nominal 42 to 54 V DC with Rack and Remote access ... and LT panels DG ... Main LT panel , ...
L-1 or if bid of any seller(s) eligible for Make in India preference is/are coming within price band of 20% of non MII L-1, then such MSE/Make in India seller shall also be allowed to participate in the RA process. Heating Element 8.5 MM Dia SS, 3 ... T), MCCB 63A, ...
diesel generators- DG Sets Average Turn Over of Last 3 Years 200 Lakh (s) Experience with Gov. Required 3 Year (s) Diesel Generators- DG Sets ( 1 ) Technical Specifications Specification Specification Name Values Allowed Values OUTPUT CAPACITY ... - CONTROL PANEL Control Panel AMF ... of Control Panel IP ...