Loading…
Loading…
38 live16 closing this weekmost from TNEB Limited and Southern Railway
38 results • Best match
Floor mounted type 3 phase 12 way vertical fabricated, MCCB distribution board
ST060240129 - ROTARY CAM SWITCH, Gear Box Ratio 24: 1, ST060240131 - ROTARY CAM SWITCH, Gear Box Ratio 36: 1
SPECIAL REPAIR REPLACEMENT OF SWITCH GEAR MCB MCCB AN CONNECTED WORKS AND PROVN OF LEFT OVER AC POINTS AND ASSOCIATED INFRASTRUCTURE IN SMQS IN MADAMBAKKAM CAMP AREA AT AFS TAMBARAM
TTPS ES Circle EM II Preventive maintenance of BMCC III switch gear and GVDC switch gear modules in Unit III during the annual overhaul period of 2026 2027
TANK EXPANSION ASSEMBLY DRAWING/176.31. 003CB- ACB
DISTRIBUTION TRANSFORMER AND HT & LT SWITCHGEAR PANELS (SS12)
Providing 40KVA Diesel Generator Set with Standard Control Panel in Arulmigu Mandaikadu Bhagavathi Amman temple in Kalkulam taluk at Kanyakumari District
Supply of 11kV Switchgear Panels for replacement of DBB2 at TNPL Unit I
Moulded Case Circuit Breakers (MCCB) Conforming To IS/IEC60947 (Part2) (Q2)
TTPS ES Circle MRT I Annual Overhauling of CWP panels System 6 6 KV HT LT Switchgear System Generator Transformer System External Auxiliary LT Switchgear System in Unit III for the year 2026 2027
PROVIDING ELECTRICAL PANEL ROOM AND ENTRANCE ARCH ARRANGEMENTS FOR THE WORK OF CONSTRUCTION OF ADDITIONAL NEW BUILDING AT GOVERNMENT HOSPITAL ANNUR OF COIMBATORE DISTRICT
SEALING STRIP as per Schneider Part No. NPRM5510162 for Schneider make VCB. Make: Schneider only.
TTPS ES Circle MRT I Annual Overhauling works in Boiler side Valves Dampers Soot Blowers L R Blowers Soot Blower Control panels and ID FD PA fans lub oil panels in Unit III for the year 2026 2027
TTPS ES Circle EM II Annual Maintenance of LT SWGR Buses Modules Breakers electronic controller panels auxiliary control panels power transformer over hauling of LT motors and Reconditioning of Transformer oil in 20 Nos of HVR transformers in ESP
SPL REP REPLACEMENT OF LT PANEL OF MES INSTALLATIONS AND CONNECTED WORKS AT AF STATION TAMBARAM AND SPL REP/REPLACEMENT OF STREET LIGHT FITTINGS TIMER PANEL AND CONNECTED WORKS AT MAIN CAMP AT AFS TAMBARAM
SPL REPAIR AND REPLACEMENT OF LIGHT SWITCH GEARS LIGHT PANELS IN BLDG NO P-30/ A8 (JCO LIVING), BLDG NO P-120 (JCO MESS) AT 172 INF (TA) MADRAS, CINCAN LAND (ARMY), SPL REPAIRS OF LT PANELS AND ALLIED WORKS AT INS BAAZ, CAMPBELL BAY UNDER GE CAMPBELL
El.D.C.No.Centre/3592/2026/ Supply and installation of Electrical panels, wiring, supply and laying of cables, Supply and installation of submersible non-clog pumps of discharge 400 to 500 M3/hr , 500 to 600 M3/hr at Ganeshapuram Subway in Div-71, Z6
TTPS ES Circle EM II Annual maintenance of LT switchgear LT Breakers Modules Bus bars and Isolators during the Overhaul period of 26 27 at AHP Stage II
Attending faults , Replacement of faulty accessories in the existing AMF panels and Providing and fixing new AMF panel in lieu of existing Manual Control panel in 15, 20, 30, 40 KVA EA set at the BTS sites under Salem BA.(Rate contract)
Attending faults , Replacement of faulty accessories in the existing AMF panels andP and F new AMF panel in lieu of existing Manual Control panel in 15, 20, 30, 40 KVA EA set at the BTS sites under Salaem BA .(Rate contract) ( under Dhrmapuri OA)
Special Repairs to LTUG Generator Cable from the ACB MV Panel from the New JICA Building to the New MV Panel in the Old Building through Cardiology and Psyciatric Ward in Government Rajaji Hospital at Madurai
Work contract for Labour Charges and transportation for supply and Erection of 1No 33 11KV 5MVA Power transformer and Outdoor bay with 33KV Outdoor VCB at 33 11KV Pillaiyarpalayam SS in respect of Kpm region
NCTPS I ES Circle EM I division S Dn III -ESP Unit I Dismantling Lifting of ESP LT Switchgear Panel upto 2 5 feet and strengthening the base support frame in Unit I to protect from water flooding stagnation due to heavy rain during Annual overhau
NCTPS I ES Circle EM I division S Dn III Providing excavation for new Earth pits erection of new GI Earth rods and laying of new GI Earth flats for improvement of Earthing system in Unit I HVR Transformer and LT Switchgear of Water Treatment plant
SW.1: Construction of Office building for Senior Section Engineer/ Electrical/ Power/ Karur and Section Engineer/ Electrical/ Power/ Erode (Construction of Office Building for SSE/E/P/ED) (Including Electrical Work) SW.2: Proposed Construction of ... of Electrical Panel Room ...
Providing Servics Contract for assisting the section officers for the month of Sep 2026 to Nov 2026 for Providing 2 Numbers of 15 Persons Passenger lift, 250 KVA Diesel Generator, HT Panel, 630 KVA Transformer and Additional Amenities to the New Mech
Main Work Formation of Additional Lanes at Km 7/555 - 8/485 of Grand Southern Trunk Road including reconstruction of the existing compound Wall Sub Work Shifting/ dismantling of existing 1 1 No 5 way RMU RRRRL with 1 No 250 KVA DT namely
LED Luminaire (Recessed Luminaire) (Ceiling Light) Conforming To IS 10322 (Part 5/Section 2) (V4) (Under BIS Scheme - II) (Q2), LED Garden Light (V2) (Q2), LED Luminaire For Floodlight Conforming To IS 10322 (Part 5/Section 5) (V3) (Under BIS Scheme ... ( MCCB ) ...
PVC Insulated Copper Cable Single Core and Multi Core Circular Sheathed with Rigid Conductor (V2) ISI Marked To IS 694 (Q2), Heater Elements (Q3), Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2), LED Luminaire ... ( MCCB ) ...
Elecric Bells and Accessories as per IS 2268 (Q3), Non Modular Piano Type Domestic Electrical Switches ISI Marked To IS 3854 (Q2), Plasticized PVC Tapes with Non- Thermosetting Adhesive for electrical purpose (V2) ISI marked to IS 7809 (Part 3/Sec1) ... ( MCCB ) ...